Risk assessment project submission checklist

Project MS 5.0 preparation prompts. Your provider’s current instructions govern.

  1. Agree a real work area/task, safe observation arrangements, form and deadline.
  2. Observe work, consult the team, check relevant information and act on immediate danger.
  3. Select four significant inadequately controlled hazards; identify relevant people and how harm occurs.
  4. Record actual existing controls and justify current L, C and R.
  5. Choose specific stronger measures, conditional residual ratings, accountable owners and dated actions.
  6. Check the logical chain across every row. Do not manipulate ratings or treat proposals as installed controls.
  7. Complete opening details, review date, accepted signature and actual provider name.
  8. Save, close and reopen the final file; check every page and cell. Submit through the provider’s route and retain receipt.

38 project marks: 1 opening + 4 × 9 row elements + 1 closing. Project pass threshold 23/38. Self-review does not award a mark.