Give visitors a route that does not depend on driver attention

Map the public enquiry journey and remove predictable pedestrian/vehicle conflicts.

Separated pedestrian walkway and parked forklift in a UK yard. Photorealistic illustration.
Photorealistic illustrative UK workplace scene. Review checks: Setting: Receive and unload identified palletised packaged goods from a rigid lorry using a suitable counterbalance forklift. Act: The supervisor checks the bay surface, lighting, pedestrian barriers, clear route and local unloading plan. Hold / review: Hold an unbooked vehicle, changed vehicle type, unknown load mass, damaged pallet or shifted load for the supervisor and, when needed, supplier or competent specialist.

Give visitors a route that does not depend on driver attention

A recycling entrance brings unfamiliar people into contact with heavy vehicles. A visitor may follow the shortest visible route to the gatehouse, particularly when signs are obscured by a queue. The useful assessment follows that real journey from arrival to assistance, rather than assuming that everyone knows the staff traffic plan. Include drivers who leave their cabs, passengers and people needing accessible assistance.

The model shows a visitor walking between waiting vehicles to ask a question. The immediate response is to prevent conflicting movement through the site arrangement and guide the person to safety without entering another danger zone. Then examine why the safe route was not obvious or usable. An instruction to be more careful leaves the same invitation to the next arrival.

Start with separation and layout. Provide an enquiry and pedestrian route that avoids vehicle lanes where practicable, with appropriate barriers, controlled crossings and a safe destination. Consider turning areas, queue growth, gate operation and emergency access. Painted lines and high-visibility clothing communicate expectations but do not stop a vehicle entering a pedestrian space. The actual design needs assessment for the site and users.

The gatehouse team also needs a workable control of arrivals. Communicate restrictions before visitors commit to a route, coordinate deliveries and public access, and explain where people remain while waiting. A temporary closure must not send pedestrians through a commercial tipping doorway. If the intended arrangement is unavailable, pause or reroute the relevant movement through an authorised plan rather than improvising at the busiest point.

For practice, draw a visitor journey on the fictional site plan and place one evidence card at each conflict. State the physical control, the person coordinating movement and the stop condition if the route fails. Observe an ordinary enquiry and a queue exception. This awareness exercise does not design a live traffic scheme; it teaches you to challenge an arrangement that works only when every driver happens to notice every pedestrian.

How do you design safer routes and choose controls?

Map actual movements, remove unnecessary vehicle–pedestrian contact, then protect unavoidable interfaces. Physical separation and suitable layout come before signs, high-visibility clothing and expectations that people will always react correctly.

Observe the site at busy and quiet times. Draw staff routes to toilets, welfare and exits alongside forklifts, lorries, customer cars, waste collections and emergency access. Include a pedestrian’s natural walking route, not just the route drawn on the plan. A long detour that encourages shortcuts needs redesign, not repeated reminders. See HSE workplace transport risk assessment for the relevant source and scope.

  1. Remove or reduce the movement: relocate a collection point, use drive-through arrangements or keep deliveries outside public access periods where practicable.
  2. Separate by design: provide suitable pedestrian routes, barriers, separate doors and protected waiting areas. Select barriers for the foreseeable impact; a painted line is not a crash barrier.
  3. Control remaining crossings: use visible, accessible crossing points away from reversing areas, suitable lighting, clear priority and enough visibility and stopping distance.
  4. Support the design: brief routes, control access and delivery timing, supervise and enforce locally assessed speed limits. Select task-appropriate protective equipment for residual risks.

Routes must suit the largest vehicle and load that will actually use them, including turns, slopes, headroom and ground-bearing capacity. Keep surfaces drained and clear; protect vulnerable racking, fuel equipment and edges. Temporary routes need the same risk-based scrutiny. HSE HSG136 third edition (pages 9–13) provides the design principles.

There is no single safe speed, lane width or pedestrian clearance for every yard. The vehicle, load, bends, visibility, surface and users determine the decision. A posted limit is a maximum within the local system, not permission to drive at that speed when conditions are worse. HSE site speed limits describes choosing and enforcing site limits.

How should a safe site be laid out?

Remove unnecessary vehicle movements, separate pedestrians from vehicles, and design routes and crossings for the vehicles that will actually use them.

Use separate entrances and direct pedestrian walkways where practicable; protect crossing points and keep them visible and unblocked. Locate delivery and storage areas to avoid crossing busy people routes. Size and maintain roads for the largest likely visitor and its turning requirements; protect structures and provide suitable signs, lighting and drainage. A painted line alone may not give effective separation where a barrier or different route is needed.

PrioritySite decision
Reduce movementPlace deliveries and parking to avoid transit through active work.
SeparateProvide protected paths and controlled crossing points.
Fit the routeCheck dimensions, ground, turning, edges, structures and visibility.
MaintainInspect surfaces, signs, barriers and temporary closures.

Basis: HSE Workplace road systems; HSE Construction traffic management on site; HSENI Drive Danger Out: dutyholders

Applied case

The marked enquiry path ends behind a queue, so a visitor walks between vehicles to reach the gatehouse.

Decision and explanation

A protected, usable enquiry route with coordinated vehicle access and clear waiting arrangements.

Make the safe journey usable and separated. Visibility clothing and warnings cannot compensate for a route that directs people into vehicle movements.

Lesson 2

Secure the vehicle before the driver becomes a pedestrian

Recognise rollaway risk and plan safe parking, waiting and cab-exit arrangements.

A lorry stands on an illustrative sloping approach with its front facing a fixed wall. A red arrow and shaded space identify rollaway and crushing between the vehicle and wall. A separate check panel connects suitable parking, the vehicle-specific securing method and sound parking systems.
Original SHAREhub schematic for the associated activity. The written lesson case supplies the decision evidence.

Secure the vehicle before the driver becomes a pedestrian

A vehicle does not become harmless when its engine is quiet. An unattended vehicle can roll, and a driver leaving the cab becomes a pedestrian within the same traffic system. The parking and waiting arrangement must control both risks. Consider surface conditions, gradients, the type and condition of vehicle, other movements and the driver's safe route to the required destination.

In the model, a driver leaves a vehicle unsecured on the weighbridge approach. Keep people away from its potential movement path and apply the site emergency or control arrangements through competent personnel. Do not stand in front of the vehicle to stop it or attempt an improvised rescue. A nearby parked vehicle or gatehouse wall can create a crushing trap as well as a collision risk.

The assessed securing method belongs to the actual vehicle and operation. Drivers need suitable instruction and the vehicle must have effective parking arrangements and necessary maintenance. Do not invent a universal sequence, wheel-chock rule or slope limit from this course. If a defect prevents reliable securing, the restriction is a work-control problem to resolve before the driver leaves the vehicle under that arrangement.

Coordinate the driver’s next task. A weighbridge instruction that requires a walk to the office should provide a safe place to stop, a controlled cab exit and a protected route. Long queues, unclear signals and pressure to move can encourage shortcuts. Review those conditions, including visiting drivers unfamiliar with site rules, rather than relying on a repeated reminder after each near miss.

For the exercise, separate the evidence into vehicle condition, site condition and driver arrangement. Add a fictional defect such as an uncertain parking function and explain how the movement remains controlled while it is assessed. Your handover should identify the vehicle, its current safe state, restriction and responsible controller. A signed induction is useful background but cannot establish that this particular unattended vehicle has actually been secured.

How are overturn and runaway risks controlled?

Match vehicle, load and manoeuvre to the ground and manufacturer limits; secure stationary vehicles and use restraints as specified.

Assess slope, edges, soft ground, turning, raised loads, articulation, attachment and load position. Follow equipment-specific rollover protection and restraint instructions rather than a blanket rule for every vehicle. Park, brake, chock or isolate as the task and vehicle require, especially during loading or maintenance. Stop for ground or route conditions outside the assessed envelope.

ConditionHold point
Soft or sloping groundConfirm bearing, stability and route suitability. Sources: HSE; HSENI
Raised or offset loadCheck capacity and travel position against instructions. Source: HSE
Stationary vehicle under loadVerify immobilisation and release control. Source: HSE

Basis: HSE HSG136 Workplace transport safety; HSENI Safe vehicles; HSE Safe loading and unloading

What hazards remain while plant is stopped or loading?

A stationary vehicle can still roll, tip, shed a load or crush someone under a raised body or attachment. Immobilise, support and isolate before intervention.

Stopped and loading plant decisions
Task Failure route Control and stop trigger
Dumper tipping Uneven load, soft ground or edge collapse. Use firm level ground, distributed load and safe edge stop; stop if bearing/edge is uncertain.Sources: HSE construction site dumpers; HSE safe use of vehicles on construction sites HSG144
Raised body or hydraulic repair Hydraulic failure drops body or attachment. Isolate energy and fit manufacturer-approved mechanical support; never rely on hydraulics alone.Sources: HSE safe use of vehicles on construction sites HSG144; HSE mobile work equipment
Loading or trailer coupling Rollaway, unstable load or person in loading zone. Apply brakes, check firm ground and secure exclusion before coupling/loading.Sources: HSE coupling and uncoupling; HSE workplace transport loading areas

The supervisor checks access to the cab and any loading platform, the attachment lock and maintenance hand-back before releasing the machine. If a support, brake, coupling or exclusion control fails, keep the plant out of service. Sources: HSE safe use of vehicles on construction sites HSG144, HSE coupling and uncoupling, HSE workplace transport loading areas.

Distinguish checking a restraint from using it

For the assessed dumper, use the provided seat restraint; ROPS alone does not keep the operator within its protective space. Keep loads within manufacturer limits and clear of the sightline. Follow the specified loading position: an operator on an exposed dumper leaves during loading and waits safely outside plant movement. Do not travel with an elevated high-lift skip. Match the method to the actual dumper/cab and competent instructions. HSE CIS52: dumpers.

Applied case

The weighbridge process requires drivers to walk to an office, but the waiting position and vehicle-securing arrangements have not been assessed.

Decision and explanation

Vehicle securing, safe cab exit and the protected pedestrian journey together.

Parking and the subsequent pedestrian movement form one task. Resolve both physical conditions through the actual assessed vehicle/site method.

Lesson 3

Treat a container exchange as a controlled change of site

Establish and maintain effective exclusion during lifting and reopening.

Separated pedestrian walkway and parked forklift in a UK yard. Photorealistic illustration.
Photorealistic illustrative UK workplace scene. Review checks: Setting: Receive and unload identified palletised packaged goods from a rigid lorry using a suitable counterbalance forklift. Act: The supervisor checks the bay surface, lighting, pedestrian barriers, clear route and local unloading plan. Hold / review: Hold an unbooked vehicle, changed vehicle type, unknown load mass, damaged pallet or shifted load for the supervisor and, when needed, supplier or competent specialist.

Treat a container exchange as a controlled change of site

A container exchange changes the site’s normal pattern. A bay used by visitors becomes part of a lifting and vehicle operation with moving equipment, suspended or shifting containers and restricted visibility. The controller must plan that transition before the lorry arrives. Public familiarity with the unloading bay can make a small sign an especially weak boundary during the change.

The model shows a skip lorry beginning to lift while people remain beside an adjacent bay. Stop the conflicting operation through the agreed safe communication and keep people outside the affected area. The relevant danger space is determined by the actual vehicle, load, lifting operation and foreseeable movement, not only the painted footprint of the destination container. A visitor should not need to judge where a suspended container might swing.

The responsible people need a suitable planned lifting arrangement, competent roles and effective access control. Close and clear the relevant area, reroute arrivals and confirm the boundary before lifting. Consider who prevents a new pedestrian entering from the far side while attention is on the driver. A banksman or attendant is not automatically protected merely because they wear high-visibility clothing.

Communication must be clear about who controls the movement and what stops it. If the boundary is breached or communication is lost, follow the defined safe response and re-establish control before continuation. Do not continue because the container is almost in place. Keep emergency routes and the alternative public route workable while the affected bays remain unavailable.

For practice, sequence closure, clearance, verified exclusion, controlled exchange, placement checks and authorised reopening. Put a visitor-arrival card into the middle of the sequence and explain how it is handled without weakening the lifting boundary. Reopening is a positive decision after the equipment and area are ready, not simply the removal of a cone when the lorry driver waves. The exercise does not authorise lifting or specify a generic exclusion distance.

How does movement become an injury?

A moving vehicle or unstable load becomes harmful when its path reaches a person. The key decisions are to prevent that overlap, detect a failing control early and stop before the movement continues.

HSE identifies four main workplace-transport accident types: vehicle strike or run-over, falling objects from vehicles, falls from vehicles and overturns. A person is exposed to the hazard; the person or a health condition is not the hazard. The impact can cause fractures, crush injury, head or spinal injury, internal injury or death. A fall can also cause serious injury even without a moving vehicle. The exact outcome depends on the vehicle, load, position and rescue conditions. HSE workplace transport risk assessment; HSENI workplace transport risk assessment. See HSE workplace transport risk assessment for the relevant source and scope.

Mechanism and likely harmEarly warningStop or hold when
Vehicle enters a pedestrian path; impact, crushing or run-over can cause major fractures, internal injury or death.A barrier is displaced, a shortcut appears, a blind turn is used or the driver cannot see the whole route.A person enters the operating zone, separation fails or the driver cannot confirm a clear path. (HSE)
Load shifts or falls during travel or unloading; impact can cause head injury, crush injury or death.Packaging is torn, a pallet leans, restraints loosen or mass and stability are unknown.The load condition or handling method is uncertain; keep people out and obtain a competent plan before opening or moving it. (HSE)
A person climbs onto or leaves a vehicle; slipping or falling can cause fractures, head or spinal injury.Wet or damaged steps, missing handholds, poor lighting or a task that unexpectedly requires climbing.Safe access or collective protection is missing; redesign for ground-level work where practicable. (HSE)
Vehicle loses stability on a slope, edge, soft ground or sharp turn; driver or bystander may be crushed or killed.Unknown ground capacity, visible edge damage, lean, excessive speed or an unverified high or offset load.Route, ground or load stability is unverified; isolate the area and obtain a competent assessment. (HSE)

Treat these as prompts for the actual site assessment, including visiting vehicles, quiet-time tasks and changing weather. The stop decision applies to the affected movement; restart only after the responsible people verify an effective control.

How should loading and unloading be controlled?

Coordinate host, haulier and driver before arrival; use a suitable loading area, keep uninvolved people clear and prevent premature vehicle movement.

Check the ground and vehicle stability, access, trailer or deck condition, load shift, safe equipment, load restraint and who is in charge. Agree where the driver waits and how the vehicle is immobilised or released. Avoid working at height where the task can be done from ground level. A load may have shifted in transit; do not open doors or restraints into its path. Use an interlock or robust operating system where early drive-off is credible.

PhaseDecision
ArrivalVehicle and bay fit; people know the host rules. Source: HSE
Before handlingVehicle secured, load stable and area controlled. Source: HSE
DuringMaintain communication and keep pedestrian access closed. Source: HSE
ReleaseSecure load, account for people and equipment, then authorise departure. Source: HSE

Basis: HSE Safe loading and unloading; HSE Preventing falls from vehicles; HSE HSG136 Workplace transport safety

A failed departure gate

Illustrative example: the driver receives a departure signal while loading equipment still bridges the vehicle and dock. The host holds departure and tells driver and loader that release is cancelled. The named loading lead verifies people and equipment clear, the agreed restraint/interlock or operating-system state, and load security, then issues one unambiguous release through the agreed communication method. Conflicting signals or an unverified state keep the vehicle held. Select the site-specific system; this does not prescribe universal wheel chocks or key retention.

Applied case

One attendant watches the lorry, while another entrance allows visitors to walk into the exchange area.

Decision and explanation

The exclusion is not effective across every access route and must be restored before lifting proceeds.

A boundary must prevent entry into the actual danger area. Watching the lift cannot compensate for uncontrolled access elsewhere.

Lesson 4

Remove the blind reverse from the plan where possible

Coordinate deliveries, sightlines and pedestrian protection before movement.

A delivery lorry faces away from a tipping-hall doorway and reverses towards it. A red manoeuvring envelope ends near a separate staff door. A physical green pedestrian barrier and route show the required separation; the scene highlights lost visibility and communication as stop triggers.
Original SHAREhub schematic for the associated activity. The written lesson case supplies the decision evidence.

Remove the blind reverse from the plan where possible

Reversing creates risk where people can enter a space the driver cannot see or cannot stop clear of. The first planning question is whether the reverse can be eliminated or reduced through the route and delivery arrangement. When it remains necessary, the assessed system must control the actual vehicle, sightlines, pedestrian access and communication. A camera or alarm is one feature, not the whole safe system.

In the fictional delivery, a commercial vehicle reverses towards a staff-only tipping doorway. A cleaner can emerge from the same door, and stored containers reduce the view. Establish the planned arrival and tipping route before the movement begins. Keep people clear through effective separation and access control rather than asking the driver to discover a safe path while reversing.

Where a trained signaller is required by the assessed arrangement, define their safe position, signals, visibility and response when contact is lost. Do not appoint a passer-by to stand behind the vehicle. The driver and site contact need the same understanding of who directs the movement and when it stops. Other people should not issue competing instructions from the doorway.

Review the compatibility of vehicle and site: turning space, ground, doorway, load and pedestrian routes. A route suitable for a smaller regular vehicle may not be suitable for a different delivery. Temporary stock, maintenance or a queue can invalidate the earlier assessment. Use the agreed hold or alternative arrangement when the conditions differ; a delivery booking does not authorise entry into an unsuitable space.

For practice, compare a through-route proposal with a retained reverse under controlled conditions. Explain the source control and the remaining evidence required for each. Add an obstructed doorway and decide which planned movement must wait. Your output should name the conflict, controller, safe pedestrian arrangement and stop trigger. Do not use the model to prescribe a live manoeuvre or assume that equipment visibility aids remove the need for an effective route plan.

What is the safest approach to reversing?

Avoid or minimise reversing and separate pedestrians first. Use a trained signaller only when the task assessment requires one, in a safe position with agreed signals; stop immediately if the driver loses sight.

One-way flow, drive-through loading and turning space can remove the manoeuvre. If reversing is necessary, establish a clear controlled area and safe communication. Cameras and alarms help but have limits. HSE does not recommend banksmen as a routine first-line fix because they can be struck; if a risk assessment requires one, they must be trained, visible in a safe position and use agreed signals. The driver stops immediately if the banksman disappears from view.

Basis: HSE Choosing and training safe drivers; HSE Construction traffic management on site; HSE HSG136 Workplace transport safety

How do you check vehicle and route compatibility?

Check the whole vehicle–load–route combination. A vehicle fitting through a gate, holding a conformity mark or having an adequate nominal capacity does not prove that it can manoeuvre or handle this load safely.

A new delivery vehicle may pass the entrance but need a larger turning area, sweep its trailer over the footway or exceed the unloading equipment’s reach. Ask the supplier or carrier for actual dimensions, load information and operating instructions before accepting the task. HSE vehicle handling explains why size, manoeuvrability and visibility must be considered together. See HSE HSG136 third edition for the relevant source and scope.

CheckDecision to make
Dimensions and swept pathConfirm vehicle and load height, width, length and turning envelope against the entire route, overhead hazards and protected pedestrian space. (HSE)
Surface and stabilityVerify bearing capacity, drainage, slopes and edges for the loaded vehicle and any stabilisers. An unknown cover, void or ground capacity requires a competent assessment. (HSE)
Load and handling equipmentConfirm load identity, mass, centre of gravity, packaging, capacity at the required reach or height, attachments and unloading sequence against the actual instructions. (HSE)
Visibility and protective systemsCheck mirrors, cameras and other controls assumed by the plan. Their coverage and condition must suit the movement; alarms alone do not establish a clear route. (HSE)
Driver and maintenanceCheck relevant competence, site familiarisation, vehicle checks and defect clearance. A road licence or supplier certificate alone does not settle these questions. (HSE)

Worked decision: a carrier substitutes an articulated lorry for the rigid lorry normally used. Its stated width is similar, so reception initially expects it to fit. The supervisor holds it at an agreed safe waiting point. The carrier’s turning information shows the trailer would cross the protected footway on the existing turn. The delivery is reassigned to a suitable vehicle or another assessed unloading arrangement; the pedestrian barrier is not removed to squeeze it through. Record the vehicle identity, route decision, agreed alternative and driver briefing.

For vehicles in use, HSG136 recommends daily driver checks before use and planned maintenance following manufacturer guidance. Check brakes, steering, tyres, lights, visibility aids, restraints, access steps and task-specific safety systems. A safety defect means taking the affected operation out of use until a competent person establishes and verifies a safe solution. A universal weekly route inspection rule is not justified; set route-check frequency from risk, deterioration, use and changes.

Applied case

A visiting lorry is larger than expected, and containers now obstruct the assessed reversing sightline.

Decision and explanation

Hold the movement and reconcile a suitable route and pedestrian-control arrangement.

Changed vehicle and site conditions require review. Neither speed nor an old briefing establishes a safe current manoeuvre.

Lesson 5

Floor picking and loaders need incompatible movements separated

Identify when the picking task conflicts with mobile-plant operation.

Separated pedestrian walkway and parked forklift in a UK yard. Photorealistic illustration.
Photorealistic illustrative UK workplace scene. Review checks: Setting: Receive and unload identified palletised packaged goods from a rigid lorry using a suitable counterbalance forklift. Act: The supervisor checks the bay surface, lighting, pedestrian barriers, clear route and local unloading plan. Hold / review: Hold an unbooked vehicle, changed vehicle type, unknown load mass, damaged pallet or shifted load for the supervisor and, when needed, supplier or competent specialist.

Floor picking and loaders need incompatible movements separated

Recovering a recyclable from a waste floor can expose a worker to a loader whose driver cannot reliably see every approach. The load, bucket, changing pile and building structure can all affect visibility and escape. The value or apparent smallness of an item does not reduce the harm if a person is struck, pinned or run over. Begin with whether the task can avoid that shared space.

The model shows a picker stepping towards a pile as the loader approaches. Stop the conflicting movement through the agreed safe arrangement and protect the person. Do not assume that eye contact, a wave or high-visibility clothing establishes a maintained safe boundary. The driver may lose the view when turning, handling the load or looking towards another operating hazard.

The assessed working method should prevent people and operating plant entering the same danger space. Separation can involve layout, controlled access, coordinated different work periods and suitable protected locations, with evidence that the system works for the actual task. A refuge that requires crossing the loader route to reach it is not automatically a safe answer. Avoid treating floor picking as an informal exception to the traffic plan.

Communication must establish a definite controlled state before the picker enters and a definite clearance before plant operation resumes. Account for everyone, including contractors and relief workers. If waste, noise or sightlines prevent the method being followed, pause and reassess. Production pressure does not justify substituting a louder shout for effective control, and this course supplies no generic safe distance from a loader.

For the exercise, draw the loader operating envelope and the picker’s complete journey. Remove an avoidable overlap and mark the remaining controlled transition with an owner and verification step. Test it with a second person arriving mid-task. A successful plan remains effective when attention is divided; it does not depend on the driver keeping one individual continuously in view while operating a moving machine.

When must the movement stop and how can it restart?

Stop the affected operation whenever its safe conditions are lost or cannot be confirmed. Keep people clear, inform the responsible supervisor and restart only after the defect or changed conditions have been assessed, controlled and communicated.

Avoid reversing wherever practicable. Where it remains necessary, provide a designated area, exclusion and suitable visibility controls. A banksman or signaller is a person guiding the driver, not a protective barrier. HSG136 treats this as a last-resort measure after other ways to control reversing risk; some vehicle and industry settings make it unsuitable. If used, the trained signaller needs an agreed signal system, a safe position and continuous visibility to the driver. If the driver loses sight of the signaller, stop immediately. HSE safe reversing. See HSE workplace transport risk assessment for the relevant source and scope.

TriggerImmediate actionRestart evidence
Person in an operating or reversing zoneStop vehicle and load movement safely. Keep other traffic out.Supervisor confirms the person is clear and effective segregation and access control are restored. (HSE)
Lost signaller, obscured route or failed visibility aidStop the affected manoeuvre; do not continue by guesswork.Visibility, agreed communication and all controls required by the assessed method are re-established. (HSE)
Brake, steering, restraint or other safety defectTake the affected operation out of use and report the defect.Competent repair and verification, or a separately assessed recovery method; no informal bypass. (HSE)
Unknown load, incompatible vehicle or changed routeHold in a safe place and contact the host, carrier or supplier.Identity and suitability confirmed; revised plan approved by the responsible competent people and briefed. (HSE)
Ice, spill, failed light, damaged barrier or unsafe surfaceClose the affected route or bay and protect people.Defect corrected and inspected, or an assessed and protected alternative route put into use. (HSE)

Collision, trapped person, fire or leak: stop surrounding traffic without entering its path, raise the alarm and call the local emergency response and 999 where needed. Keep clear of unstable vehicles, loads, fuel and electrical hazards. Do not attempt improvised lifting or vehicle movement to free a person; emergency responders and the site rescue arrangements must control that decision. Provide first aid only when it is safe and within competence. Preserve relevant evidence after immediate protection and emergency needs are met.

Report damage and near misses internally so the underlying route or system failure can be corrected. The responsible person must separately check whether statutory reporting applies: use HSE incident reporting for GB and HSENI report an incident for Northern Ireland. Their criteria differ; not every near miss is a reportable dangerous occurrence.

How do safe site, vehicle and driver controls work together?

Keep people out of vehicle paths first; make the vehicle suitable and maintained; train and supervise operators for the actual site.

Safe site vehicle and driver
Part Control Live check
Site Separate routes, minimise reversing, light crossings and protect visitors. Walk a live shift including deliveries.Sources: HSE introduction to workplace transport safety; HSENI workplace transport
Vehicle Match equipment to ground/load; maintain brakes, steering, tyres, lights and restraints. Pre-use check and defect quarantine.Sources: HSE mobile work equipment; Provision and Use of Work Equipment Regulations (NI) 1999
Driver Authorise competence for type, attachment and site; supervise behaviour. Observe task and retrain after change.Sources: HSE managing lift trucks; HSENI forklift trucks

Applied case

A picker waves to a loader driver, then enters the pile area while the loader continues handling material.

Decision and explanation

It does not establish effective, maintained segregation or the agreed controlled state.

Momentary acknowledgement is not a protected working arrangement. Prevent the conflicting movements through the assessed method and verified clearance.

Lesson 6

Move the high load without losing control of the pedestrian route

Assess sightlines and the whole movement rather than prescribing a generic driving direction.

Counterbalanced lift truck includes wheels, overhead guard, seated operator, mast, carriage and forks supporting a high bale load. The load blocks the operator sightline and a dashed red area indicates obscured forward space. A physically protected pedestrian waiting area is outside the operating space; travel is held pending assessment.
Original SHAREhub schematic for the associated activity. The written lesson case supplies the decision evidence.

Move the high load without losing control of the pedestrian route

A lift-truck load can obscure the driver's view and change stability and manoeuvring conditions. The safe method depends on the vehicle, load, route and surrounding work. A rule repeated without that context can transfer the risk elsewhere. The planning priority is a suitable load movement with people effectively separated, not a demand that every operator improvise when the view disappears.

The model shows a high load beside a walking route. Hold the movement when the assessed conditions are not satisfied and establish the appropriate arrangement with the responsible controller. Examine the full journey: pickup, travel, turns, doors, set-down and return. Pedestrian access can be clear at pickup yet conflict at a later corner or doorway. An audible warning does not reserve the whole route.

Competent operators need suitable equipment, load information and authority for the actual task. Check the relevant vehicle condition, load stability, attachments and route compatibility through the defined system. The course does not specify a universal travel direction, speed, load height or turning method. Those choices require the assessed operating method and manufacturer information for the actual equipment.

The site must control the public and visiting-driver interface as well as employed pedestrians. Deliveries, queues, temporary storage and maintenance can change sightlines. Communicate closures and safe waiting places before the movement begins. If an alternative route is proposed, establish that it is suitable and controlled rather than moving the high load through an unfamiliar public area simply because it looks empty.

For practice, compare an original route with a proposed reroute. Identify the conflicts at each stage and what evidence supports the selected arrangement. Document a fictional movement brief covering who is clear, who controls access and what stops travel. Finish by verifying the set-down and restored route before reopening. A useful brief is specific enough to be checked during the work, rather than a general instruction to sound the horn and take care.

What is different for lift trucks and mobile plant?

Use equipment-specific training, familiarisation, supervision and manufacturer instructions; a general driving licence or certificate alone does not authorise a workplace task.

HSE lift-truck guidance describes basic, job-specific and familiarisation training. Employers should assess competence for the actual truck, attachment, site and load. There is no government-issued general workplace transport operator licence; public-road use has separate road requirements. L117 is a GB lift-truck Approved Code of Practice (ACOP), not a universal rule for every vehicle or automatically an NI ACOP. Apply suitable NI work-equipment law and HSENI guidance to NI sites.

StageEvidence
Basic skillTraining and practical assessment on relevant truck type. Source: HSE
Job-specificLoad, attachment, site rules and hazards. Source: HSE
FamiliarisationObserved safe use under local conditions. Source: HSE
Refresh or changeReassessment after incident, poor practice, new truck or task. Source: HSE

Basis: HSE L117 Rider-operated lift trucks; HSE Lift-truck training; HSE Workplace transport FAQs; HSENI PUWER (Northern Ireland) 1999

How do you check vehicle and route compatibility?

Check the whole vehicle–load–route combination. A vehicle fitting through a gate, holding a conformity mark or having an adequate nominal capacity does not prove that it can manoeuvre or handle this load safely.

A new delivery vehicle may pass the entrance but need a larger turning area, sweep its trailer over the footway or exceed the unloading equipment’s reach. Ask the supplier or carrier for actual dimensions, load information and operating instructions before accepting the task. HSE vehicle handling explains why size, manoeuvrability and visibility must be considered together. See HSE HSG136 third edition for the relevant source and scope.

CheckDecision to make
Dimensions and swept pathConfirm vehicle and load height, width, length and turning envelope against the entire route, overhead hazards and protected pedestrian space. (HSE)
Surface and stabilityVerify bearing capacity, drainage, slopes and edges for the loaded vehicle and any stabilisers. An unknown cover, void or ground capacity requires a competent assessment. (HSE)
Load and handling equipmentConfirm load identity, mass, centre of gravity, packaging, capacity at the required reach or height, attachments and unloading sequence against the actual instructions. (HSE)
Visibility and protective systemsCheck mirrors, cameras and other controls assumed by the plan. Their coverage and condition must suit the movement; alarms alone do not establish a clear route. (HSE)
Driver and maintenanceCheck relevant competence, site familiarisation, vehicle checks and defect clearance. A road licence or supplier certificate alone does not settle these questions. (HSE)

Worked decision: a carrier substitutes an articulated lorry for the rigid lorry normally used. Its stated width is similar, so reception initially expects it to fit. The supervisor holds it at an agreed safe waiting point. The carrier’s turning information shows the trailer would cross the protected footway on the existing turn. The delivery is reassigned to a suitable vehicle or another assessed unloading arrangement; the pedestrian barrier is not removed to squeeze it through. Record the vehicle identity, route decision, agreed alternative and driver briefing.

For vehicles in use, HSG136 recommends daily driver checks before use and planned maintenance following manufacturer guidance. Check brakes, steering, tyres, lights, visibility aids, restraints, access steps and task-specific safety systems. A safety defect means taking the affected operation out of use until a competent person establishes and verifies a safe solution. A universal weekly route inspection rule is not justified; set route-check frequency from risk, deterioration, use and changes.

Applied case

The load blocks the lift-truck operator’s forward view, and a pedestrian door opens into the travel route.

Decision and explanation

A suitable assessed load/vehicle/route method with effective pedestrian control.

The whole movement and actual interfaces require control. Visibility aids and warnings support rather than replace a suitable segregated arrangement.

Lesson 7

Pedestrian crossing through weighbridge traffic

A controlled route removes the conflict; visibility aids and reassurance do not stop a vehicle.

Separated pedestrian walkway and parked forklift in a UK yard. Photorealistic illustration.
Photorealistic illustrative UK workplace scene. Review checks: Setting: Receive and unload identified palletised packaged goods from a rigid lorry using a suitable counterbalance forklift. Act: The supervisor checks the bay surface, lighting, pedestrian barriers, clear route and local unloading plan. Hold / review: Hold an unbooked vehicle, changed vehicle type, unknown load mass, damaged pallet or shifted load for the supervisor and, when needed, supplier or competent specialist.

Understand the activity and how harm develops

A visitor needs help while cars and commercial vehicles queue for the weighbridge. The shortcut between bumpers puts a person inside a driver’s blind area. Drivers concentrating on the scale, ticket window or vehicle ahead may move without noticing them. Children, mobility aids and visitors carrying waste make the public interface harder to predict.

Plan the enquiry route from the public entrance to the gatehouse before considering signs. It needs to remain usable when queues are longest and when a driver leaves a cab. A painted line cannot physically prevent a person stepping into moving traffic. Check where staff actually stand to answer questions, including during breakdowns or refused loads.

Recognise the evidence boundary

QuestionCase evidence
What is observed?A visitor walks between waiting vehicles to ask at the gatehouse.
How can harm occur?A moving vehicle could strike or trap the visitor.
What information is needed?Compare the public pedestrian route with gatehouse traffic movements.

Protect, manage and verify

PurposePractical application
Immediate protectionProvide a protected enquiry route and control vehicle access.
Accountable work arrangementRemove the need to cross the weighbridge lane by providing help from a protected public route. Provide suitable pedestrian barriers, a controlled crossing where needed and clear sightlines. Hold vehicle movement while an authorised crossing takes place; keep queue management outside the vehicle path.
Release verificationConfirm visitors can reach assistance without entering vehicle lanes.

Apply this at work

At the next inspection, look for the same failure pathway beyond weighbridge crossing. Walk the route during a busy arrival period and include a visitor who cannot use steps. Recheck after changes in waste, staffing, weather, equipment or layout.

How do you check vehicle and route compatibility?

Check the whole vehicle–load–route combination. A vehicle fitting through a gate, holding a conformity mark or having an adequate nominal capacity does not prove that it can manoeuvre or handle this load safely.

A new delivery vehicle may pass the entrance but need a larger turning area, sweep its trailer over the footway or exceed the unloading equipment’s reach. Ask the supplier or carrier for actual dimensions, load information and operating instructions before accepting the task. HSE vehicle handling explains why size, manoeuvrability and visibility must be considered together. See HSE HSG136 third edition for the relevant source and scope.

CheckDecision to make
Dimensions and swept pathConfirm vehicle and load height, width, length and turning envelope against the entire route, overhead hazards and protected pedestrian space. (HSE)
Surface and stabilityVerify bearing capacity, drainage, slopes and edges for the loaded vehicle and any stabilisers. An unknown cover, void or ground capacity requires a competent assessment. (HSE)
Load and handling equipmentConfirm load identity, mass, centre of gravity, packaging, capacity at the required reach or height, attachments and unloading sequence against the actual instructions. (HSE)
Visibility and protective systemsCheck mirrors, cameras and other controls assumed by the plan. Their coverage and condition must suit the movement; alarms alone do not establish a clear route. (HSE)
Driver and maintenanceCheck relevant competence, site familiarisation, vehicle checks and defect clearance. A road licence or supplier certificate alone does not settle these questions. (HSE)

Worked decision: a carrier substitutes an articulated lorry for the rigid lorry normally used. Its stated width is similar, so reception initially expects it to fit. The supervisor holds it at an agreed safe waiting point. The carrier’s turning information shows the trailer would cross the protected footway on the existing turn. The delivery is reassigned to a suitable vehicle or another assessed unloading arrangement; the pedestrian barrier is not removed to squeeze it through. Record the vehicle identity, route decision, agreed alternative and driver briefing.

For vehicles in use, HSG136 recommends daily driver checks before use and planned maintenance following manufacturer guidance. Check brakes, steering, tyres, lights, visibility aids, restraints, access steps and task-specific safety systems. A safety defect means taking the affected operation out of use until a competent person establishes and verifies a safe solution. A universal weekly route inspection rule is not justified; set route-check frequency from risk, deterioration, use and changes.

Applied case

A visitor walks between waiting vehicles to ask at the gatehouse. The following options are fictional decisions for this inspection point.

Decision and explanation

Hold the affected traffic and direct the family to the protected enquiry route.

Eye contact is uncertain, especially with vehicle blind spots; it does not create a protected crossing. Standing behind a reversing vehicle exposes the helper as well as the visitors. A controlled route removes the conflict; visibility aids and reassurance do not stop a vehicle. Verify the arrangement before work resumes.

Lesson 8

Unattended vehicle rollaway

Switching off the engine does not establish secure parking, and a person must never act as a vehicle restraint.

Separated pedestrian walkway and parked forklift in a UK yard. Photorealistic illustration.
Photorealistic illustrative UK workplace scene. Review checks: Setting: Receive and unload identified palletised packaged goods from a rigid lorry using a suitable counterbalance forklift. Act: The supervisor checks the bay surface, lighting, pedestrian barriers, clear route and local unloading plan. Hold / review: Hold an unbooked vehicle, changed vehicle type, unknown load mass, damaged pallet or shifted load for the supervisor and, when needed, supplier or competent specialist.

Understand the activity and how harm develops

The driver steps away from a vehicle on the weighbridge approach. If it is not securely parked, gravity or movement during unloading can set it rolling. The crushing space between a vehicle and the gatehouse is particularly unforgiving: a person has little room to escape and may not hear the movement.

Treat parking as part of the reception procedure. Identify a suitable place for drivers to stop, apply the manufacturer’s parking method and confirm that the vehicle cannot move before leaving it. Transmission position, parking brake condition, gradient and the intended operation all matter. Wheel chocks are an assessed additional measure where appropriate; they do not repair defective brakes or make an unsuitable stopping place acceptable.

Recognise the evidence boundary

QuestionCase evidence
What is observed?A driver leaves a vehicle on the weighbridge approach without securing it.
How can harm occur?An unattended vehicle could roll into people or other vehicles.
What information is needed?Check the parking arrangement and operator instructions.

Protect, manage and verify

PurposePractical application
Immediate protectionUse the assessed parking and vehicle-securing procedure.
Accountable work arrangementProvide a designated suitable stopping area instead of leaving drivers to park on the approach. Maintain vehicle parking systems and suitable ground; prevent pedestrians entering trapping spaces. Use the vehicle-specific securing procedure before leaving the cab and report any brake defect.
Release verificationConfirm the vehicle is secured before the driver leaves it.

Apply this at work

At the next inspection, look for the same failure pathway beyond vehicle parking. Observe a representative arrival and confirm the procedure matches the actual vehicle and gradient. Recheck after changes in waste, staffing, weather, equipment or layout.

How do you check vehicle and route compatibility?

Check the whole vehicle–load–route combination. A vehicle fitting through a gate, holding a conformity mark or having an adequate nominal capacity does not prove that it can manoeuvre or handle this load safely.

A new delivery vehicle may pass the entrance but need a larger turning area, sweep its trailer over the footway or exceed the unloading equipment’s reach. Ask the supplier or carrier for actual dimensions, load information and operating instructions before accepting the task. HSE vehicle handling explains why size, manoeuvrability and visibility must be considered together. See HSE HSG136 third edition for the relevant source and scope.

CheckDecision to make
Dimensions and swept pathConfirm vehicle and load height, width, length and turning envelope against the entire route, overhead hazards and protected pedestrian space. (HSE)
Surface and stabilityVerify bearing capacity, drainage, slopes and edges for the loaded vehicle and any stabilisers. An unknown cover, void or ground capacity requires a competent assessment. (HSE)
Load and handling equipmentConfirm load identity, mass, centre of gravity, packaging, capacity at the required reach or height, attachments and unloading sequence against the actual instructions. (HSE)
Visibility and protective systemsCheck mirrors, cameras and other controls assumed by the plan. Their coverage and condition must suit the movement; alarms alone do not establish a clear route. (HSE)
Driver and maintenanceCheck relevant competence, site familiarisation, vehicle checks and defect clearance. A road licence or supplier certificate alone does not settle these questions. (HSE)

Worked decision: a carrier substitutes an articulated lorry for the rigid lorry normally used. Its stated width is similar, so reception initially expects it to fit. The supervisor holds it at an agreed safe waiting point. The carrier’s turning information shows the trailer would cross the protected footway on the existing turn. The delivery is reassigned to a suitable vehicle or another assessed unloading arrangement; the pedestrian barrier is not removed to squeeze it through. Record the vehicle identity, route decision, agreed alternative and driver briefing.

For vehicles in use, HSG136 recommends daily driver checks before use and planned maintenance following manufacturer guidance. Check brakes, steering, tyres, lights, visibility aids, restraints, access steps and task-specific safety systems. A safety defect means taking the affected operation out of use until a competent person establishes and verifies a safe solution. A universal weekly route inspection rule is not justified; set route-check frequency from risk, deterioration, use and changes.

Applied case

A driver leaves a vehicle on the weighbridge approach without securing it. The following options are fictional decisions for this inspection point.

Decision and explanation

Verify the vehicle is secured using its parking procedure before the driver leaves.

Switching off the engine does not establish secure parking, and a person must never act as a vehicle restraint. Verify the arrangement before work resumes. A vehicle remaining still for a few seconds does not establish that it is secured. A human body must never be used as a restraint or wheel chock.

Lesson 9

Public beneath a container exchange

Warning devices do not remove people from a lifting envelope or protect them from a suspended container.

Lifting accessories being inspected beside a stationary UK overhead crane. Photorealistic illustration.
Photorealistic illustrative UK workplace scene. Review checks: Load: What is being lifted and where is the centre of gravity? Equipment: Is the lift truck and attachment suitable? Route: Can the load travel safely?

Understand the activity and how harm develops

Container exchange changes the public bay into a lifting operation. The moving container, lifting arms, vehicle and landing area create a danger zone that extends beyond the load’s footprint. A member of the public may continue unloading because the bay looked available moments earlier. Queue pressure makes the boundary especially important.

Plan the exchange and close affected public routes before the lorry begins. Equipment suitability, ground conditions, competent operators and the relevant inspection or examination records are part of the lift arrangements. A skip is not automatically lifting equipment under LOLER, while the lifting mechanism and relevant accessories may be. The site lead and driver must agree who establishes exclusion and who authorises reopening.

Recognise the evidence boundary

QuestionCase evidence
What is observed?A skip lorry starts lifting while visitors remain in the adjacent bay.
How can harm occur?A moving or suspended container could crush a member of the public.
What information is needed?Check the lifting plan and effectiveness of the closed-area boundary.

Protect, manage and verify

PurposePractical application
Immediate protectionClose and clear the lifting area and reroute arrivals before exchange.
Accountable work arrangementSchedule exchanges to avoid public exposure and remove the need for simultaneous unloading. Provide an effective closed-area boundary covering the lifting envelope and vehicle movements. Clear and confirm the area before the lift; keep people out until the container and equipment are safe.
Release verificationThe responsible operator verifies exclusion before lifting and reopening.

Apply this at work

At the next inspection, look for the same failure pathway beyond skip exchange. Check the live exclusion, competent operator and applicable equipment records, then complete a bay handback. Recheck after changes in waste, staffing, weather, equipment or layout.

How should lifting operations be planned?

Plan the load, route, equipment, people and failure response before anyone attaches a hook or starts a truck.

HSE LOLER overview says lifting operations must be properly planned by a competent person, supervised and carried out safely. For a workshop motor lift, record load mass and centre of gravity, rated capacity, sling angles, attachment points, travel route, floor condition, pedestrian exclusion and who signals and stops the move.

The lift plan should be proportionate: a routine well-controlled pallet lift may use a standard method, while an unusual, fragile, tandem or people-lifting operation needs more detailed competent planning. A change in load, ground, weather, equipment or people reopens the plan.

CheckRelease evidenceHold triggerDirect source
Load and routeKnown mass/centre, stable path, exclusion of people.Unknown mass or pedestrian interface.HSE LOLER
EquipmentRated lift/accessories, compatible attachments and pre-use condition.Damaged sling, missing mark or inadequate capacity.HSE equipment selection
PeopleCompetent operator/signaller and supervisor proportionate to task.Unclear signalling or unbriefed change.HSE lift planning

Applied case

A skip lorry starts lifting while visitors remain in the adjacent bay. The following options are fictional decisions for this inspection point.

Decision and explanation

Hold the exchange until the affected lifting area is closed and cleared.

No one should steady a suspended container from beneath or enter its crush envelope. Warning devices do not remove people from a lifting envelope or protect them from a suspended container. Verify the arrangement before work resumes. A beacon gives a warning but does not clear the lift’s danger area or establish exclusion.

Lesson 10

Reversing delivery into a blind area

A controlled manoeuvre needs separation and competent arrangements before movement begins.

Separated pedestrian walkway and parked forklift in a UK yard. Photorealistic illustration.
Photorealistic illustrative UK workplace scene. Review checks: Setting: Receive and unload identified palletised packaged goods from a rigid lorry using a suitable counterbalance forklift. Act: The supervisor checks the bay surface, lighting, pedestrian barriers, clear route and local unloading plan. Hold / review: Hold an unbooked vehicle, changed vehicle type, unknown load mass, damaged pallet or shifted load for the supervisor and, when needed, supplier or competent specialist.

Understand the activity and how harm develops

The staff tipping doorway is a transition between outdoor traffic and an enclosed work area. A reversing vehicle can hide a worker behind the body or inside a poorly lit doorway. Alarms compete with loader noise and hearing protection, while temporary stockpiles can change the sightline after the route was originally assessed.

Prefer a route that avoids reversing. Where reversing remains necessary, keep people physically separated and provide an agreed controlled method suited to the vehicle and site. Reversing aids support the arrangement. A trained reversing assistant may be used where the assessed method requires one, with a safe position and a stop rule if communication or visibility is lost. Never assume a driver has seen a person.

Recognise the evidence boundary

QuestionCase evidence
What is observed?A commercial vehicle reverses towards a staff-only tipping doorway.
How can harm occur?An unseen worker could be run over or crushed.
What information is needed?Review the delivery route and observe sightlines from a safe position.

Protect, manage and verify

PurposePractical application
Immediate protectionSeparate people and vehicles and eliminate or control reversing.
Accountable work arrangementUse a suitable one-way or drive-through layout to eliminate avoidable reversing. Maintain segregated pedestrian routes, suitable lighting and clear driver sightlines. Coordinate delivery entry; use the assessed reversing method and stop when its conditions fail.
Release verificationConfirm the driver and site contact use the agreed movement arrangement.

Apply this at work

At the next inspection, look for the same failure pathway beyond reversing bay. Observe a delivery under representative lighting and check no pedestrian route opens into the manoeuvre. Recheck after changes in waste, staffing, weather, equipment or layout.

How do you check vehicle and route compatibility?

Check the whole vehicle–load–route combination. A vehicle fitting through a gate, holding a conformity mark or having an adequate nominal capacity does not prove that it can manoeuvre or handle this load safely.

A new delivery vehicle may pass the entrance but need a larger turning area, sweep its trailer over the footway or exceed the unloading equipment’s reach. Ask the supplier or carrier for actual dimensions, load information and operating instructions before accepting the task. HSE vehicle handling explains why size, manoeuvrability and visibility must be considered together. See HSE HSG136 third edition for the relevant source and scope.

CheckDecision to make
Dimensions and swept pathConfirm vehicle and load height, width, length and turning envelope against the entire route, overhead hazards and protected pedestrian space. (HSE)
Surface and stabilityVerify bearing capacity, drainage, slopes and edges for the loaded vehicle and any stabilisers. An unknown cover, void or ground capacity requires a competent assessment. (HSE)
Load and handling equipmentConfirm load identity, mass, centre of gravity, packaging, capacity at the required reach or height, attachments and unloading sequence against the actual instructions. (HSE)
Visibility and protective systemsCheck mirrors, cameras and other controls assumed by the plan. Their coverage and condition must suit the movement; alarms alone do not establish a clear route. (HSE)
Driver and maintenanceCheck relevant competence, site familiarisation, vehicle checks and defect clearance. A road licence or supplier certificate alone does not settle these questions. (HSE)

Worked decision: a carrier substitutes an articulated lorry for the rigid lorry normally used. Its stated width is similar, so reception initially expects it to fit. The supervisor holds it at an agreed safe waiting point. The carrier’s turning information shows the trailer would cross the protected footway on the existing turn. The delivery is reassigned to a suitable vehicle or another assessed unloading arrangement; the pedestrian barrier is not removed to squeeze it through. Record the vehicle identity, route decision, agreed alternative and driver briefing.

For vehicles in use, HSG136 recommends daily driver checks before use and planned maintenance following manufacturer guidance. Check brakes, steering, tyres, lights, visibility aids, restraints, access steps and task-specific safety systems. A safety defect means taking the affected operation out of use until a competent person establishes and verifies a safe solution. A universal weekly route inspection rule is not justified; set route-check frequency from risk, deterioration, use and changes.

Applied case

A commercial vehicle reverses towards a staff-only tipping doorway. The following options are fictional decisions for this inspection point.

Decision and explanation

Hold movement until exclusion and the agreed reversing method are established.

Noise, hearing protection and distraction mean an alarm cannot guarantee that a person will move clear. An untrained helper placed behind the vehicle can become the casualty; any assistance needs a safe assessed arrangement. A controlled manoeuvre needs separation and competent arrangements before movement begins. Verify the arrangement before work resumes.

Lesson 11

Floor picker inside loader operating space

Experience and visibility do not remove the shared operating space; the movements must be separated.

Separated pedestrian walkway and parked forklift in a UK yard. Photorealistic illustration.
Photorealistic illustrative UK workplace scene. Review checks: Setting: Receive and unload identified palletised packaged goods from a rigid lorry using a suitable counterbalance forklift. Act: The supervisor checks the bay surface, lighting, pedestrian barriers, clear route and local unloading plan. Hold / review: Hold an unbooked vehicle, changed vehicle type, unknown load mass, damaged pallet or shifted load for the supervisor and, when needed, supplier or competent specialist.

Understand the activity and how harm develops

Floor picking places people near a loader that turns, reverses and approaches a changing waste face. The bucket, body and material pile all obstruct visibility. A worker concentrating on a valuable item may enter the operating space without recognising the next vehicle movement. Informal eye contact does not create a reliable separation system.

Challenge whether hand retrieval beside mobile plant is necessary. Pre-sorting or another process may remove the conflict. Where the activity remains, design protected refuges and an agreed sequence so the loader cannot operate while a picker is exposed. Everyone, including temporary workers, must understand how the area is cleared and released. The control is separation in practice, not a high-visibility vest or a driver’s confidence.

Recognise the evidence boundary

QuestionCase evidence
What is observed?A worker retrieves a recyclable while the loader approaches the pile.
How can harm occur?The loader could strike or crush the worker.
What information is needed?Check the floor-picking method and protected refuge arrangements.

Protect, manage and verify

PurposePractical application
Immediate protectionPrevent simultaneous conflicting movements through effective segregation.
Accountable work arrangementUse pre-sorting or another process to remove avoidable hand picking around mobile plant. Establish effective segregated zones and protected refuges suited to the plant’s full operating envelope. Prevent conflicting simultaneous movements; require positive clearance under the agreed system.
Release verificationConfirm pickers are protected and the driver has the agreed clearance.

Apply this at work

At the next inspection, look for the same failure pathway beyond loader envelope. Observe the complete picking-and-loader cycle and check new workers understand the release signal. Recheck after changes in waste, staffing, weather, equipment or layout.

How do you check vehicle and route compatibility?

Check the whole vehicle–load–route combination. A vehicle fitting through a gate, holding a conformity mark or having an adequate nominal capacity does not prove that it can manoeuvre or handle this load safely.

A new delivery vehicle may pass the entrance but need a larger turning area, sweep its trailer over the footway or exceed the unloading equipment’s reach. Ask the supplier or carrier for actual dimensions, load information and operating instructions before accepting the task. HSE vehicle handling explains why size, manoeuvrability and visibility must be considered together. See HSE HSG136 third edition for the relevant source and scope.

CheckDecision to make
Dimensions and swept pathConfirm vehicle and load height, width, length and turning envelope against the entire route, overhead hazards and protected pedestrian space. (HSE)
Surface and stabilityVerify bearing capacity, drainage, slopes and edges for the loaded vehicle and any stabilisers. An unknown cover, void or ground capacity requires a competent assessment. (HSE)
Load and handling equipmentConfirm load identity, mass, centre of gravity, packaging, capacity at the required reach or height, attachments and unloading sequence against the actual instructions. (HSE)
Visibility and protective systemsCheck mirrors, cameras and other controls assumed by the plan. Their coverage and condition must suit the movement; alarms alone do not establish a clear route. (HSE)
Driver and maintenanceCheck relevant competence, site familiarisation, vehicle checks and defect clearance. A road licence or supplier certificate alone does not settle these questions. (HSE)

Worked decision: a carrier substitutes an articulated lorry for the rigid lorry normally used. Its stated width is similar, so reception initially expects it to fit. The supervisor holds it at an agreed safe waiting point. The carrier’s turning information shows the trailer would cross the protected footway on the existing turn. The delivery is reassigned to a suitable vehicle or another assessed unloading arrangement; the pedestrian barrier is not removed to squeeze it through. Record the vehicle identity, route decision, agreed alternative and driver briefing.

For vehicles in use, HSG136 recommends daily driver checks before use and planned maintenance following manufacturer guidance. Check brakes, steering, tyres, lights, visibility aids, restraints, access steps and task-specific safety systems. A safety defect means taking the affected operation out of use until a competent person establishes and verifies a safe solution. A universal weekly route inspection rule is not justified; set route-check frequency from risk, deterioration, use and changes.

Applied case

A worker retrieves a recyclable while the loader approaches the pile. The following options are fictional decisions for this inspection point.

Decision and explanation

Stop the conflict and restore the agreed separation and clearance sequence.

Being visible at one moment does not stop a turning machine or maintain separation through the full cycle. Driver experience cannot create a safe space between a person, moving bucket and changing pile. Experience and visibility do not remove the shared operating space; the movements must be separated. Verify the arrangement before work resumes.

Lesson 12

Lift-truck load obscuring pedestrians

Warnings do not remove the blind area or prevent pedestrian entry.

Separated pedestrian walkway and parked forklift in a UK yard. Photorealistic illustration.
Photorealistic illustrative UK workplace scene. Review checks: Setting: Receive and unload identified palletised packaged goods from a rigid lorry using a suitable counterbalance forklift. Act: The supervisor checks the bay surface, lighting, pedestrian barriers, clear route and local unloading plan. Hold / review: Hold an unbooked vehicle, changed vehicle type, unknown load mass, damaged pallet or shifted load for the supervisor and, when needed, supplier or competent specialist.

Understand the activity and how harm develops

A lift truck carrying a high bale load may have a restricted forward view. A pedestrian route that crosses the vehicle path can disappear from the operator’s sight behind the load. The rear swing, turning space and unstable or oversized loads add further hazards during despatch.

Separate pedestrian access from load movements and assess a method that maintains safe visibility for the actual load and truck. Reversing is not an automatic solution: the route, vehicle, operator and any assistance need to suit the manoeuvre. Keep visiting drivers in a suitable protected waiting location. Confirm load capacity and stability as well as sightlines; a clear route does not make an unsuitable load safe.

Recognise the evidence boundary

QuestionCase evidence
What is observed?A high load blocks a lift-truck operator's view beside a walking route.
How can harm occur?A pedestrian could be struck or crushed.
What information is needed?Check sightlines and the dispatch traffic arrangement.

Protect, manage and verify

PurposePractical application
Immediate protectionSeparate pedestrian access and use the assessed load movement method.
Accountable work arrangementRemove pedestrian crossings from the bale movement route where practicable. Provide physical separation, clear routes and suitable visibility aids for the assessed movement. Use authorised competent operators and a planned method suited to the truck, load and route.
Release verificationConfirm an unobstructed safe movement arrangement before travel.

Apply this at work

At the next inspection, look for the same failure pathway beyond forklift route. Observe a representative full-load movement and verify pedestrians cannot enter blind operating space. Recheck after changes in waste, staffing, weather, equipment or layout.

How do you check vehicle and route compatibility?

Check the whole vehicle–load–route combination. A vehicle fitting through a gate, holding a conformity mark or having an adequate nominal capacity does not prove that it can manoeuvre or handle this load safely.

A new delivery vehicle may pass the entrance but need a larger turning area, sweep its trailer over the footway or exceed the unloading equipment’s reach. Ask the supplier or carrier for actual dimensions, load information and operating instructions before accepting the task. HSE vehicle handling explains why size, manoeuvrability and visibility must be considered together. See HSE HSG136 third edition for the relevant source and scope.

CheckDecision to make
Dimensions and swept pathConfirm vehicle and load height, width, length and turning envelope against the entire route, overhead hazards and protected pedestrian space. (HSE)
Surface and stabilityVerify bearing capacity, drainage, slopes and edges for the loaded vehicle and any stabilisers. An unknown cover, void or ground capacity requires a competent assessment. (HSE)
Load and handling equipmentConfirm load identity, mass, centre of gravity, packaging, capacity at the required reach or height, attachments and unloading sequence against the actual instructions. (HSE)
Visibility and protective systemsCheck mirrors, cameras and other controls assumed by the plan. Their coverage and condition must suit the movement; alarms alone do not establish a clear route. (HSE)
Driver and maintenanceCheck relevant competence, site familiarisation, vehicle checks and defect clearance. A road licence or supplier certificate alone does not settle these questions. (HSE)

Worked decision: a carrier substitutes an articulated lorry for the rigid lorry normally used. Its stated width is similar, so reception initially expects it to fit. The supervisor holds it at an agreed safe waiting point. The carrier’s turning information shows the trailer would cross the protected footway on the existing turn. The delivery is reassigned to a suitable vehicle or another assessed unloading arrangement; the pedestrian barrier is not removed to squeeze it through. Record the vehicle identity, route decision, agreed alternative and driver briefing.

For vehicles in use, HSG136 recommends daily driver checks before use and planned maintenance following manufacturer guidance. Check brakes, steering, tyres, lights, visibility aids, restraints, access steps and task-specific safety systems. A safety defect means taking the affected operation out of use until a competent person establishes and verifies a safe solution. A universal weekly route inspection rule is not justified; set route-check frequency from risk, deterioration, use and changes.

Applied case

A high load blocks a lift-truck operator's view beside a walking route. The following options are fictional decisions for this inspection point.

Decision and explanation

Hold travel until an assessed safe movement and pedestrian separation are established.

A horn cannot remove the blind area or ensure every pedestrian hears and responds. Asking pedestrians to watch out leaves the shared route and sightline failure unchanged. Warnings do not remove the blind area or prevent pedestrian entry. Verify the arrangement before work resumes.

Lesson 13

The queue, container exchange and loader all want the same space

Integrate public access, vehicle control and verified handover before releasing movement.

Separated pedestrian walkway and parked forklift in a UK yard. Photorealistic illustration.
Photorealistic illustrative UK workplace scene. Review checks: Setting: Receive and unload identified palletised packaged goods from a rigid lorry using a suitable counterbalance forklift. Act: The supervisor checks the bay surface, lighting, pedestrian barriers, clear route and local unloading plan. Hold / review: Hold an unbooked vehicle, changed vehicle type, unknown load mass, damaged pallet or shifted load for the supervisor and, when needed, supplier or competent specialist.

The queue, container exchange and loader all want the same space

The fictional recycling yard is busy. A public queue obscures the enquiry route, a visiting lorry is ready to exchange a container and a loader is needed at the waste pile. A picker has found a valuable item near the loader approach. A lift truck waits with a high load beside a pedestrian door. Some routes remain properly separated, while the planned exchange area has an uncontrolled second entrance.

Start by controlling the conflicts that exist now. Prevent lifting into an area the public can enter and prevent simultaneous picker/loader movement. Hold the high-load journey until its pedestrian interface is resolved. Guide the visitor through a protected arrangement without sending an attendant into moving traffic. Preserve the distinction between these restrictions and unrelated routes that can demonstrably remain safe.

At the gatehouse, trace the enquiry journey from the arriving vehicle to assistance. Resolve the queue obstruction and provide a workable waiting and cab-exit arrangement. The visiting driver needs instructions before entering the changed area. Confirm the vehicle is secured through its assessed method when the driver leaves it; an induction record does not establish the current parked state.

For the container exchange, identify the actual affected space and every approach. The responsible lifting controller needs verified closure and clearance, competent roles, suitable equipment and agreed communication. Control new arrivals while attention is on the lift. A breach or lost communication triggers the defined safe response; the fact that the container is nearly placed cannot justify continuing with people in the danger area.

For the loader task, remove or control the overlap with floor picking. Establish the definite safe state needed before a person enters and the clearance before plant movement resumes. Do not substitute a wave or a promise to watch for maintained separation. Consider other people arriving mid-task and whether the protected location remains reachable without crossing the operating route.

For the lift truck, assess the complete high-load journey and the pedestrian door. Use the authorised method for the actual load, vehicle and route, rather than inventing a travel direction or speed. If another route is proposed, check its compatibility and access control before releasing the movement. An apparently empty public area is not automatically an approved alternative.

Your final plan should sequence the conflicting activities and name the controller of each transition. State what is closed, what may proceed, the evidence needed to reopen and how the next shift will know the current status. Use the fictional worksheet only. The learning outcome is a coherent safe site arrangement that does not depend on perfect attention, not permission to drive plant, direct lifts or redesign live traffic routes without competent assessment.

How do you design safer routes and choose controls?

Map actual movements, remove unnecessary vehicle–pedestrian contact, then protect unavoidable interfaces. Physical separation and suitable layout come before signs, high-visibility clothing and expectations that people will always react correctly.

Observe the site at busy and quiet times. Draw staff routes to toilets, welfare and exits alongside forklifts, lorries, customer cars, waste collections and emergency access. Include a pedestrian’s natural walking route, not just the route drawn on the plan. A long detour that encourages shortcuts needs redesign, not repeated reminders. See HSE workplace transport risk assessment for the relevant source and scope.

  1. Remove or reduce the movement: relocate a collection point, use drive-through arrangements or keep deliveries outside public access periods where practicable.
  2. Separate by design: provide suitable pedestrian routes, barriers, separate doors and protected waiting areas. Select barriers for the foreseeable impact; a painted line is not a crash barrier.
  3. Control remaining crossings: use visible, accessible crossing points away from reversing areas, suitable lighting, clear priority and enough visibility and stopping distance.
  4. Support the design: brief routes, control access and delivery timing, supervise and enforce locally assessed speed limits. Select task-appropriate protective equipment for residual risks.

Routes must suit the largest vehicle and load that will actually use them, including turns, slopes, headroom and ground-bearing capacity. Keep surfaces drained and clear; protect vulnerable racking, fuel equipment and edges. Temporary routes need the same risk-based scrutiny. HSE HSG136 third edition (pages 9–13) provides the design principles.

There is no single safe speed, lane width or pedestrian clearance for every yard. The vehicle, load, bends, visibility, surface and users determine the decision. A posted limit is a maximum within the local system, not permission to drive at that speed when conditions are worse. HSE site speed limits describes choosing and enforcing site limits.

How should loading and unloading be controlled?

Coordinate host, haulier and driver before arrival; use a suitable loading area, keep uninvolved people clear and prevent premature vehicle movement.

Check the ground and vehicle stability, access, trailer or deck condition, load shift, safe equipment, load restraint and who is in charge. Agree where the driver waits and how the vehicle is immobilised or released. Avoid working at height where the task can be done from ground level. A load may have shifted in transit; do not open doors or restraints into its path. Use an interlock or robust operating system where early drive-off is credible.

PhaseDecision
ArrivalVehicle and bay fit; people know the host rules. Source: HSE
Before handlingVehicle secured, load stable and area controlled. Source: HSE
DuringMaintain communication and keep pedestrian access closed. Source: HSE
ReleaseSecure load, account for people and equipment, then authorise departure. Source: HSE

Basis: HSE Safe loading and unloading; HSE Preventing falls from vehicles; HSE HSG136 Workplace transport safety

A failed departure gate

Illustrative example: the driver receives a departure signal while loading equipment still bridges the vehicle and dock. The host holds departure and tells driver and loader that release is cancelled. The named loading lead verifies people and equipment clear, the agreed restraint/interlock or operating-system state, and load security, then issues one unambiguous release through the agreed communication method. Conflicting signals or an unverified state keep the vehicle held. Select the site-specific system; this does not prescribe universal wheel chocks or key retention.

Applied case

A public queue, container exchange, floor-picking request and high-load movement create overlapping access needs; an exchange entrance is not controlled.

Decision and explanation

Control and sequence the specific conflicting movements, verify separation and assign clear release ownership.

Resolve the real interfaces and maintain reliable distinctions. Extra warnings cannot replace effective exclusion, while unrelated controlled activity should be assessed on its own evidence.

Lesson 14

Take a verified action into the workplace

Connect one actual task to an owner, evidence and a clear release or escalation decision.

Separated pedestrian walkway and parked forklift in a UK yard. Photorealistic illustration.
Photorealistic illustrative UK workplace scene. Review checks: Setting: Receive and unload identified palletised packaged goods from a rigid lorry using a suitable counterbalance forklift. Act: The supervisor checks the bay surface, lighting, pedestrian barriers, clear route and local unloading plan. Hold / review: Hold an unbooked vehicle, changed vehicle type, unknown load mass, damaged pallet or shifted load for the supervisor and, when needed, supplier or competent specialist.

Turn awareness into a practical question

Awareness in a fictional household recycling and commercial processing yard. Apply GB occupational guidance or the separate NI route as appropriate. No plant-driving, lifting or traffic-design authority is granted.

Choose one relevant operation from the course. Describe the person or environment at risk, the mechanism of harm and the exact condition that needs controlling. Separate an observation from a conclusion. A display, signature, badge or clean appearance answers only a limited question.

Use the included practice resources to prepare a fictional task brief, risk review or verification question. Decide which competent role owns the decision and which evidence must be available before work restarts or waste is released. Keep worker protection, public exclusion, waste acceptance and environmental decisions distinct where required.

At work, use your actual approved arrangements. Report uncertainty and preserve the relevant hold, restriction or safe state while it is resolved. Confirm that the action addressed the original harm route and check whether another shift, load, cleaning task or maintenance change could reintroduce it.

Course completion records awareness learning. It does not establish practical competence, certify a waste business, vary a permit, classify an unknown waste or authorise maintenance, chemical work or emergency entry.

How do you design safer routes and choose controls?

Map actual movements, remove unnecessary vehicle–pedestrian contact, then protect unavoidable interfaces. Physical separation and suitable layout come before signs, high-visibility clothing and expectations that people will always react correctly.

Observe the site at busy and quiet times. Draw staff routes to toilets, welfare and exits alongside forklifts, lorries, customer cars, waste collections and emergency access. Include a pedestrian’s natural walking route, not just the route drawn on the plan. A long detour that encourages shortcuts needs redesign, not repeated reminders. See HSE workplace transport risk assessment for the relevant source and scope.

  1. Remove or reduce the movement: relocate a collection point, use drive-through arrangements or keep deliveries outside public access periods where practicable.
  2. Separate by design: provide suitable pedestrian routes, barriers, separate doors and protected waiting areas. Select barriers for the foreseeable impact; a painted line is not a crash barrier.
  3. Control remaining crossings: use visible, accessible crossing points away from reversing areas, suitable lighting, clear priority and enough visibility and stopping distance.
  4. Support the design: brief routes, control access and delivery timing, supervise and enforce locally assessed speed limits. Select task-appropriate protective equipment for residual risks.

Routes must suit the largest vehicle and load that will actually use them, including turns, slopes, headroom and ground-bearing capacity. Keep surfaces drained and clear; protect vulnerable racking, fuel equipment and edges. Temporary routes need the same risk-based scrutiny. HSE HSG136 third edition (pages 9–13) provides the design principles.

There is no single safe speed, lane width or pedestrian clearance for every yard. The vehicle, load, bends, visibility, surface and users determine the decision. A posted limit is a maximum within the local system, not permission to drive at that speed when conditions are worse. HSE site speed limits describes choosing and enforcing site limits.

How should loading and unloading be controlled?

Coordinate host, haulier and driver before arrival; use a suitable loading area, keep uninvolved people clear and prevent premature vehicle movement.

Check the ground and vehicle stability, access, trailer or deck condition, load shift, safe equipment, load restraint and who is in charge. Agree where the driver waits and how the vehicle is immobilised or released. Avoid working at height where the task can be done from ground level. A load may have shifted in transit; do not open doors or restraints into its path. Use an interlock or robust operating system where early drive-off is credible.

PhaseDecision
ArrivalVehicle and bay fit; people know the host rules. Source: HSE
Before handlingVehicle secured, load stable and area controlled. Source: HSE
DuringMaintain communication and keep pedestrian access closed. Source: HSE
ReleaseSecure load, account for people and equipment, then authorise departure. Source: HSE

Basis: HSE Safe loading and unloading; HSE Preventing falls from vehicles; HSE HSG136 Workplace transport safety

A failed departure gate

Illustrative example: the driver receives a departure signal while loading equipment still bridges the vehicle and dock. The host holds departure and tells driver and loader that release is cancelled. The named loading lead verifies people and equipment clear, the agreed restraint/interlock or operating-system state, and load security, then issues one unambiguous release through the agreed communication method. Conflicting signals or an unverified state keep the vehicle held. Select the site-specific system; this does not prescribe universal wheel chocks or key retention.

Applied case

The shift action log says “training completed, issue closed”. It records no condition check, waste disposition or task owner.

Decision and explanation

The accountable person verifies the task-specific control and records the justified decision.

Learning supports the decision; evidence that the relevant control works is needed before the responsible person closes the action.