Your practical risk assessment project
Submit after passing the assigned theory paper. Assess one agreed activity and three significant hazards. Pass: 20/30, at least two acceptable critical controls and explicit assessor safety verification.
1. Agree the task and protect information
Choose a real task with your provider/employer’s permission and safe access, or an issued fictional scenario where that route is authorised. Do not carry out hazardous work or enter restricted areas to obtain evidence. Define the activity boundaries and people affected. Redact unnecessary personal, health, security and commercial information.
2. Observe, consult and establish the facts
Speak with the team, check relevant instructions and competent information, and record actual current controls. Take immediate concerns through the responsible workplace escalation route. Explain assumptions and limitations. An SDS, template or simulation is an information source, not a complete assessment of the task.
3. Complete all three rows
- Hazard and source
- Who may be harmed and how
- Actual existing controls and evidence
- Initial likelihood, severity, rating and justification
- Additional ERIC-PD controls and reasons
- Owner, due date and interim protection
- Target residual likelihood, severity, rating and justification
- Critical control, performance requirement and failure response
- Implementation evidence, verification owner/date and review triggers
Use the SLS matrix and descriptors. Explain each factor. Target residual ratings remain conditional on implementation and verification. Essential safeguards and applicable duties override numerical bands.
4. Review and amend with the team
Check the entire chain from hazard to credible harm, current controls, proposed changes, owners and evidence. Discuss practical constraints and amend the method where necessary. Record the review date, change triggers, emergency and stop/restart arrangements. Obtain competent input where needed. This is preparation for assessment and does not release real work.
5. Submit and retain receipt
Download the editable Word template, complete your own work in your preferred editor and export a readable accepted file. The LMS accepts PDF, DOCX, ODT, XLSX or TXT, up to three files at 20 MB each. Reopen the saved file and check all content before upload. Use the final declaration and submit action; a draft is not a completed submission. Final submission sends an ASSESSMENT REQUIRED notice to the private backend inbox for allocation to an assessor. Keep the recorded receipt and respond to assessor feedback through the same assignment.
Download editable Word templateOpen your recorded LMS programme and private submission area
How the project is marked
| Element per row | Marks | What the assessor looks for |
|---|---|---|
| Initial rating | 2 | 1 for factors/arithmetic consistent with SLS descriptors; 1 for a credible evidence-based justification of current exposure and controls. |
| ERIC-PD controls | 5 | 1 each for considering stronger hierarchy options, specific suitable measures, addressing the harm pathway, workable ownership/timing/interim protection, and explicit verification. Do not give a point merely for naming a hierarchy letter. |
| Target residual rating | 2 | 1 for consistent factors/arithmetic; 1 for justified conditional effectiveness and assumptions. Unsupported severity reduction loses the relevant mark. |
| Critical control | 1 | A specific essential barrier with a clear function and a credible performance/stop criterion, connected to the serious-harm pathway. |
Total 30 marks. Pass 20. At least two acceptable critical controls are mandatory. Missing validity information or an unresolved essential-safeguard omission requires correction even when a numerical total exceeds 20. The assessor records marks and feedback plus a separate safety verification. The public practice workbook never awards project marks.
Choose an issued fictional scenario if authorised
Warehouse light replacement
Replace a fitting above a dispatch area using a method to be selected and justified. Deliveries continue nearby and the electrical circuit label is unclear. Assess access/falls, vehicle interfaces and hazardous electrical energy. Establish equipment suitability, competent isolation, separation, coordination and emergency arrangements. Do not invent a load or attachment capability.
Jammed recycling conveyor
A conveyor has jammed with material under tension. A loader works nearby and an operator proposes pressing the emergency stop before reaching inside. Assess moving/stored energy, plant interfaces and the waste material. Plan secure isolation and verification, guarding/access and suitable competent intervention. An emergency stop is not complete isolation.
Solvent leak in an enclosed plant room
For this fictional case, the issued product information states flammable vapour and harmful inhalation exposure. A leak is suspected in a poorly ventilated room. Assess exposure, ignition and emergency access. Hold entry and obtain competent identification, atmosphere/control and emergency planning. Do not improvise ventilation switching or assume a generic glove or respirator is suitable.
Roadside service trench
A planned 2.5 m excavation is beside traffic and recorded underground services. Ground support, water and pedestrian access need design and verification. Assess collapse, services and vehicle/public interfaces. Establish competent excavation protection, locating and safe digging, inspection and access. A scan alone or an arbitrary barrier description is not a complete method.