Demolition exclusion and stability inspection

BOUK-CHK-DEM-02 · v1.0 · Blank editable master · DOCX

Check boundaries, changing stability, debris and unplanned exposures.

Download editable DOCXView this policy branch

Read-only preview. Use the downloaded native file for your own working copy. Examples are fictional; signatures, work releases and operational evidence remain separate.

ROUTINE FIRST-LINE CHECK

Blank editable checklist. Check boundaries, changing stability, debris and unplanned exposures. Use actual evidence for the defined scope. No inspection, approval or signature is prefilled.

Location and taskChecker and date
Site: ___________________
Area / asset: ___________________
Checker: ___________________
Date: ___________ Shift: ___________
Scope / approved criteria
Daily work-front assessment after strip-out. Stop demolition or alteration at an unexplained structural condition, uncontrolled exposure, failed isolation, loss of exclusion or deviation from the accepted sequence.

Version: 1.0 | * = critical control. Observe safely; never defeat a guard or open live equipment.

RefClosed control questionOne response
C01Is the current demolition sequence available?Yes No N/A
C02* Is the exclusion zone secured?Yes No N/A
C03Is debris loading within the agreed allowance?Yes No N/A
C04Is structural information available for this phase?Yes No N/A
C05Are service disconnections confirmed?Yes No N/A
C06Is asbestos information resolved for the work?Yes No N/A
C07Is the required temporary support installed?Yes No N/A
C08Are dust controls ready?Yes No N/A
YesNoN/AScore %

Yes = 1; No = 0. Score = Yes / (Yes + No) x 100. N/A needs a reason and is excluded, not a pass. Unanswered checks remain incomplete. A critical failure requires immediate containment and escalation regardless of the score. This is not certification of safety or compliance.

Findings actions and review

Record each No finding and N/A reason by check reference. Make unsafe conditions safe before continuing. Give each action a named owner and due date.

CheckFinding / N/A reason / immediate controlAction owner / required actionDue / evidence
Review fieldAuditor or verifier entry
Checker name / signature / date
Supervisor or verifier / date
Restrictions / escalation / restart authority
Verification / evidence / effectiveness
Next routine check date
Deeper review neededYes No
Offline photograph or evidence reference
Insert image or record evidence details here

Compare only the same checklist version, wording, criteria and N/A pattern. Record the same area, asset and shift consistently. A high score does not override a failed critical control.

Regulatory context: Great Britain baseline; Northern Ireland, fire and environmental duties need nation-specific review. These are original monitoring checks, not legal certification.

Background reading

Demolition and dismantling safety

Content basis

Built from the BuildOut policy and arrangement register, the SHARE policy/risk/routine-checklist/audit databases and the linked SHAREknowledge topics.

Register legal summaries retain their own review dates. No actual inspection, clinical record, specialist certificate or company approval is represented.