Electrical tools, leads and distribution inspection

BOUK-CHK-ELEC-01 · v1.0 · Blank editable master · DOCX

Set risk-based user checks and inspection/testing arrangements.

Download editable DOCXView this policy branch

Read-only preview. Use the downloaded native file for your own working copy. Examples are fictional; signatures, work releases and operational evidence remain separate.

ROUTINE FIRST-LINE CHECK

Blank editable checklist. Set risk-based user checks and inspection/testing arrangements. Use actual evidence for the defined scope. No inspection, approval or signature is prefilled.

Location and taskChecker and date
Site: ___________________
Area / asset: ___________________
Checker: ___________________
Date: ___________ Shift: ___________
Scope / approved criteria
Damaged extension lead or unsuitable equipment in wet conditions. Do not use or work on a supply of uncertain identity, isolation or condition. Keep clear of damaged live equipment and use the project emergency arrangements.

Version: 1.0 | * = critical control. Observe safely; never defeat a guard or open live equipment.

RefClosed control questionOne response
C01Are extension leads within the site's approved loading arrangement?Yes No N/A
C02Are leads routed away from crush points?Yes No N/A
C03Is the inspection status current under the site maintenance scheme?Yes No N/A
C04Is the asset identifiable against the equipment list?Yes No N/A
C05Is the item approved for the planned environment?Yes No N/A
C06* Is the plug body free of cracks or exposed parts?Yes No N/A
C07* Is the cable sheath intact along the visible length?Yes No N/A
C08Is the cable grip retaining the outer sheath?Yes No N/A
YesNoN/AScore %

Yes = 1; No = 0. Score = Yes / (Yes + No) x 100. N/A needs a reason and is excluded, not a pass. Unanswered checks remain incomplete. A critical failure requires immediate containment and escalation regardless of the score. This is not certification of safety or compliance.

Findings actions and review

Record each No finding and N/A reason by check reference. Make unsafe conditions safe before continuing. Give each action a named owner and due date.

CheckFinding / N/A reason / immediate controlAction owner / required actionDue / evidence
Review fieldAuditor or verifier entry
Checker name / signature / date
Supervisor or verifier / date
Restrictions / escalation / restart authority
Verification / evidence / effectiveness
Next routine check date
Deeper review neededYes No
Offline photograph or evidence reference
Insert image or record evidence details here

Compare only the same checklist version, wording, criteria and N/A pattern. Record the same area, asset and shift consistently. A high score does not override a failed critical control.

Regulatory context: Great Britain baseline; Northern Ireland, fire and environmental duties need nation-specific review. These are original monitoring checks, not legal certification.

Background reading

Electrical control measures, safe systems and inspection

Isolation, Lockout and Line Breaking

Content basis

Built from the BuildOut policy and arrangement register, the SHARE policy/risk/routine-checklist/audit databases and the linked SHAREknowledge topics.

Register legal summaries retain their own review dates. No actual inspection, clinical record, specialist certificate or company approval is represented.