Supervisor daily safe-start and close-down check

BOUK-CHK-MON-01 · v1.0 · Blank editable master · DOCX

Verify work-front controls, welfare, access and safe shutdown.

Download editable DOCXView this policy branch

Read-only preview. Use the downloaded native file for your own working copy. Examples are fictional; signatures, work releases and operational evidence remain separate.

ROUTINE FIRST-LINE CHECK

Blank editable checklist. Verify work-front controls, welfare, access and safe shutdown. Use actual evidence for the defined scope. No inspection, approval or signature is prefilled.

Location and taskChecker and date
Site: ___________________
Area / asset: ___________________
Checker: ___________________
Date: ___________ Shift: ___________
Scope / approved criteria
Multi-trade floor before work starts. Escalate a failed critical control immediately and restrict affected work; an acceptable overall inspection score cannot overrule that failure.

Version: 1.0 | * = critical control. Observe safely; never defeat a guard or open live equipment.

RefClosed control questionOne response
C01* Are today's work packages matched to current assessments and competent supervision?Yes No N/A
C02* Are critical survey design service and permit prerequisites verified before release?Yes No N/A
C03* Are access welfare fire and public boundaries suitable for this shift?Yes No N/A
C04Are equipment exposure and task rescue controls effective at the actual workface?Yes No N/A
C05Have changed work and adjacent trades been coordinated and briefed?Yes No N/A
C06At close-down are hazardous energy incomplete works and stored materials made safe?Yes No N/A
C07Are remaining restrictions defects and permit states handed over to the responsible person?Yes No N/A
C08* Are failed critical controls stopped protected and escalated rather than carried into the next shift?Yes No N/A
YesNoN/AScore %

Yes = 1; No = 0. Score = Yes / (Yes + No) x 100. N/A needs a reason and is excluded, not a pass. Unanswered checks remain incomplete. A critical failure requires immediate containment and escalation regardless of the score. This is not certification of safety or compliance.

Findings actions and review

Record each No finding and N/A reason by check reference. Make unsafe conditions safe before continuing. Give each action a named owner and due date.

CheckFinding / N/A reason / immediate controlAction owner / required actionDue / evidence
Review fieldAuditor or verifier entry
Checker name / signature / date
Supervisor or verifier / date
Restrictions / escalation / restart authority
Verification / evidence / effectiveness
Next routine check date
Deeper review neededYes No
Offline photograph or evidence reference
Insert image or record evidence details here

Compare only the same checklist version, wording, criteria and N/A pattern. Record the same area, asset and shift consistently. A high score does not override a failed critical control.

Regulatory context: Great Britain baseline; Northern Ireland, fire and environmental duties need nation-specific review. These are original monitoring checks, not legal certification.

Background reading

Health and Safety Performance Monitoring, Measuring, Review and Audit

Active and reactive monitoring

Health and safety auditing

Content basis

Built from the BuildOut policy and arrangement register, the SHARE policy/risk/routine-checklist/audit databases and the linked SHAREknowledge topics.

Register legal summaries retain their own review dates. No actual inspection, clinical record, specialist certificate or company approval is represented.