Excavation inspection and defect report

BOUK-FRM-EXC-01 · v1.0 · Blank editable master · DOCX

Record competent inspections, defects and safe-work restrictions.

Download editable DOCXView this policy branch

Read-only preview. Use the downloaded native file for your own working copy. Examples are fictional; signatures, work releases and operational evidence remain separate.

BOUK-FRM-EXC-01 | Version 1.0 | 23 October 2026 | GB baseline

BLANK EDITABLE MASTER. Record actual facts, evidence and decisions. Operational entries, signatures and approvals are blank.

Record competent inspections, defects and safe-work restrictions.

Arrange inspection before shift work, after an event affecting strength or stability, and after material falls or is dislodged. Inspect safely. Communicate unsafe findings immediately and hold affected work until remedied and rechecked. BuildOut requires this record and its delivery to the Site Manager before the shift ends. Record the trigger and the actual delivery time.

Record identityActual entry
Record reference and project
Exact location and description including equipment and materials
Inspector name position competence and inspection date and time
Name and address of organisation for whom inspection is made

Scope facts and prerequisites

Required informationActual evidence or decision
Excavation location depth stage and inspection trigger
Inspector competence date time and safe observation point
Ground support access and service condition
Edge loads plant water and atmosphere where relevant
Design or method reference and observed differences

Decisions handover and verification

Stop excavation or entry when service identity, stability, support, water, atmosphere, access or protective separation is uncertain or deteriorates.

Required informationActual evidence or decision
Defects and immediate withdrawal or protection
Competent corrective action and reinspection
Entry restriction or release decision and reason
Person notified of unsafe findings and time plus next inspection trigger
Finding or actionOwner and due dateEvidence and effectiveness
Review and acceptanceActual entry
Reviewer name role and date
Report delivered to name role date and time
Remaining restrictions and restart authority

Retain factual evidence and limitations. A signature, permit or tick does not establish that the physical controls work. Use the separate procedure and the completed decision example for guidance; never copy an example as an actual result.

Guidance Excavations: ground, services and inspection · Buried services and safe excavation · HSE Excavations