Register fields
| Field | Use |
|---|---|
| Action ID and linked risk | Enter the actual action id and linked risk for this item. Retain the referenced evidence separately. |
| Finding and immediate restriction | Enter the actual finding and immediate restriction for this item. Retain the referenced evidence separately. |
| Lasting control required | Enter the actual lasting control required for this item. Retain the referenced evidence separately. |
| Accountable owner | Enter the actual accountable owner for this item. Retain the referenced evidence separately. |
| Implementation evidence | Enter the actual implementation evidence for this item. Retain the referenced evidence separately. |
| Effectiveness test and verifier | Enter the actual effectiveness test and verifier for this item. Retain the referenced evidence separately. |
| Due date | Enter the actual due date for this item. Retain the referenced evidence separately. |
| Verification evidence and date | Enter the actual verification evidence and date for this item. Retain the referenced evidence separately. |
| Current action state | Enter the actual current action state for this item. Retain the referenced evidence separately. |
Fictional worked decision
A quiet route check is positive but a busy delivery blocks the route.
The manager changes sampling time, records the control failure and traces the systemic cause through a formal audit.
Separate implementation evidence from an effectiveness test during representative deliveries.
Worked register entries
| Action ID and linked risk | Finding and immediate restriction | Lasting control required | Accountable owner | Implementation evidence | Effectiveness test and verifier | Due date | Verification evidence and date | Current action state | Record check |
|---|---|---|---|---|---|---|---|---|---|
| EX A01 R02 | Pedestrian route blocked during delivery | Revised physical route and booking sequence | Example Site manager | Layout change proposed | Observe two representative deliveries with independent verifier | 30 Oct 2026 | Effectiveness not tested | Open | |
| EX A02 R02 | Pedestrian route blocked during delivery | Revised physical route and booking sequence | Layout change proposed | Observe two representative deliveries with independent verifier | 30 Oct 2026 | Effectiveness not tested | Open | Missing Accountable owner ; |
The operational Register sheet is blank. The Guide sheet explains ownership, privacy, date checks, review and extension of the table. The Record check column identifies incomplete entries; it does not authorise work or prove effective controls.