Excavations and buried services

Plan excavation, locate services and recognise instability before entry.
Full public teaching and readers are free to read without an account. A free learner account is required for confirmed saved assessment, completion and certificate records in the LMS.
What you will work through
Fictional Canal Yard project: a drainage trench runs beside an occupied block and a changing delivery route. You are the workface reviewer. Build an evidence-based recommendation; the site’s competent people retain design and release authority.
The course has 5 modules and 18 lessons, with teaching, applied activities, feedback and a check of understanding throughout. There are 4 practice pauses in the actual construction model, with an equivalent accessible text route. Public interactive practice is separate from confirmed LMS assessment and completion records.
Explore the interactive practice copy. Return to the LMS route for recorded learning.
Learning outcomes
- Reconcile service information and safe-exposure evidence before ground penetration.
- Identify protection, access, loading and inspection requirements for the actual excavation.
- Recognise when water, ground or sequence changes require a hold and competent reassessment.
Course outline
Plan the work
- Define the dig before choosing controlsA route change can alter ground loads, services, temporary works and people exposed. Reconcile the plan with the actual location.
- Who plans, checks and releases?Design information and a competent workface check perform different jobs; both must connect through the work sequence.
- Read the ground and its neighboursGround, water and adjoining foundations are interacting conditions. A visual guess at a universal slope cannot establish stability.
- Plan, locate and expose servicesPlanning, locating and safe excavation are complementary controls; uncertainty must be resolved before the tool reaches the service.
Find and protect services
- What a locator can and cannot tell youNo signal does not establish absence. Service material, depth, conditions, equipment and operator competence affect detection.
- Permits and safe exposureA permit coordinates verified controls. It cannot replace the physical checks and safe excavation method it requires.
- Support, shielding and safe slopesA shield protects people within its design limits; it is not automatically a shoring design for ground or structures outside it.
- Edge loads and falling materialSurcharge can contribute to failure before visible warning. Setbacks depend on the site-specific protective arrangement.
Control the open excavation
- Safe access and protected edgesAccess must be usable without defeating the protective system or creating a second exposure.
- Water, pumping and stabilityDewatering can affect ground and structures. It belongs in the protective design and inspection process.
- Atmospheres and confined-space decisionsAn open excavation can still contain a dangerous atmosphere. Assessment, equipment and emergency arrangements must match the risk.
- Keep people clear of moving plantVisibility aids and clothing do not establish separation from the operating envelope or protect an unstable edge.
Inspect, respond and hand over
- Inspection is a continuing decisionInspections must respond to events that can affect safety, not only the calendar. Record defects and the conditions for release.
- Respond to a strike or collapseRescue must not create further casualties. Emergency services and the utility need accurate location and hazard information.
- Brief the workface and hand over changeThe handover must explain the actual state of the excavation and the protective sequence, not simply prove that a briefing took place.
Prove the decision
- Build an evidence packEvidence must connect the planned system to present conditions and resolved defects; volume of paperwork is not assurance.
- Capstone: earn a controlled restartA restart is a coordinated decision based on all relevant conditions, not one repaired symptom.
- Transfer the learning to your next jobLearning helps you ask and verify the right questions; it does not establish specialist design competence or authorise entry.
Assessment and completion
Complete the required lessons and activities, then take the 20-question final assessment. The pass threshold is 80% plus every designated critical safety answer. Points and badges cannot compensate for a critical error.
Use the LMS to save and resume confirmed progress. Certificate availability follows its passed-completion and grade conditions. Browser practice and printed learning pages do not issue the official LMS record.
Independent construction learning. Completion records learning within the course scope; competent site assessment, practical training and task authorisation remain necessary. It does not confer a NEBOSH qualification.
Sources and learning provenance
The teaching draws on public SHAREhub topic pages and structured source records, with original fictional workface cases. Use the linked primary guidance and the applicable jurisdiction when planning a live task.
Topic records, source IDs and versions
| Public topic section | Chunk and version | Jurisdiction and source IDs |
|---|---|---|
| excavations · meaning | excavations--meaning Version 2.2 | Great Britain, Northern Ireland S2, hse-hsg47, hseni-cdm |
| excavations · planning | excavations--planning Version 2.2 | Great Britain, Northern Ireland S2, hseni-cdm |
| excavations · audience | excavations--audience Version 2.2 | Great Britain, Northern Ireland S2, hse-hsg47, hseni-cdm |
| excavations · management-system | excavations--management-system Version 2.2 | Great Britain, Northern Ireland hse-rights-12 |
| excavations · hazards | excavations--hazards Version 2.2 | Great Britain, Northern Ireland S2, hse-hsg47, hseni-cdm |
| excavations · ground-stability-field-check | excavations--ground-stability-field-check Version 2.2 | Great Britain, Northern Ireland S2, hse-hsg47 |
| buried-services · safe-system | buried-services--safe-system Version 20261016-letter-review-1 | Great Britain, Northern Ireland hsg47, hse-cables |
| buried-services · planning | buried-services--planning Version 20261016-letter-review-1 | Great Britain, Northern Ireland hsg47, hse-cables |
| buried-services · locating | buried-services--locating Version 20261016-letter-review-1 | Great Britain, Northern Ireland hsg47, hse-cables |
| buried-services · marking | buried-services--marking Version 20261016-letter-review-1 | Great Britain, Northern Ireland hsg47, hse-cables |
| buried-services · permit | buried-services--permit Version 20261016-letter-review-1 | Great Britain, Northern Ireland hsg47, hse-cables |
| buried-services · excavation | buried-services--excavation Version 20261016-letter-review-1 | Great Britain, Northern Ireland hsg47, hse-cables |
| excavations · collapse | excavations--collapse Version 2.2 | Great Britain, Northern Ireland S2 |
| excavations · edge-protection | excavations--edge-protection Version 2.2 | Great Britain, Northern Ireland S2, hse-hsg47, hseni-cdm |
| excavations · plant | excavations--plant Version 2.2 | Great Britain, Northern Ireland S2, hse-hsg47, hseni-cdm |
| excavations · field-ready-controls | excavations--field-ready-controls Version 2.2 | Great Britain, Northern Ireland S2, hse-hsg47, hseni-cdm |
| excavations · warning-signs | excavations--warning-signs Version 2.2 | Great Britain, Northern Ireland S2, hse-hsg47, hseni-cdm |
| excavations · water-ground | excavations--water-ground Version 2.2 | Great Britain, Northern Ireland S2 |
| excavations · atmospheres | excavations--atmospheres Version 2.2 | Great Britain, Northern Ireland hse-confined, gb-confined, ni-confined |
| excavations · emergency | excavations--emergency Version 2.2 | Great Britain, Northern Ireland S2, hse-hsg47, hseni-cdm, hse-emergency |
| excavations · risk-register | excavations--risk-register Version 2.2 | Great Britain, Northern Ireland S2, hse-hsg47, hseni-cdm |
| excavations · inspection | excavations--inspection Version 2.2 | Great Britain, Northern Ireland S2 |
| buried-services · emergency | buried-services--emergency Version 20261016-letter-review-1 | Great Britain, Northern Ireland hsg47, hse-cables |
| buried-services · strike-response | buried-services--strike-response Version 20261016-letter-review-1 | Great Britain, Northern Ireland hsg47, hse-cables, hse-gas |
| excavations · training | excavations--training Version 2.2 | Great Britain, Northern Ireland S2, hse-hsg47, hseni-cdm |
| excavations · buildout-excavation-example | excavations--buildout-excavation-example Version 2.2 | Great Britain S2, S14, S1, S4, S17 |
| excavations · business-example | excavations--business-example Version 2.2 | Great Britain, Northern Ireland S2, hse-hsg47, hseni-cdm |
| excavations · study | excavations--study Version 2.2 | Great Britain, Northern Ireland S2, hse-hsg47, hseni-cdm |
| excavations · ericpd | excavations--ericpd Version 2.2 | Great Britain, Northern Ireland S2, hse-hsg47, hseni-cdm |
| excavations · legal | excavations--legal Version 2.2 | Great Britain, Northern Ireland gb-cdm, ni-cdm, gb-hswa, ni-hswo, gb-mhswr, ni-mhswr, gb-confined, ni-confined |
Course version 2026.10.20.4 · SH-EXC-01. Factual source identity and jurisdiction are retained in the .
Questions about this course
Is this course free?
Yes. The training is £0. Full public teaching and readers can be used without an account. A free learner account is required for confirmed saved assessment, completion and certificate records in the LMS.
How long should I allow?
Approx. 2h–3h: approximately 120–180 minutes of self-paced learning, including required activities and one final-assessment attempt. Your pace, review and retries may increase the time. Save and resume in the LMS.
Can I study without a 3D-capable browser?
Yes. The complete learning reader is available in ordinary HTML. Where this course includes model practice, an accessible text route provides the same decision sequence. Use the interactive LMS course to complete its assessed requirements.
What do I need to pass?
Complete the required learning and achieve at least 80% in the final assessment, with every critical safety answer correct. Follow the feedback and review the relevant lesson before retrying.
Where is my completion record?
The LMS holds confirmed grades, completion and certificate records for your learner account. Public browser practice has its own separate progress and is not an official completion record.
Does completion authorise construction work?
Independent construction learning. Completion records learning within the course scope; competent site assessment, practical training and task authorisation remain necessary. It does not confer a NEBOSH qualification.
Presentation and model workshop
Use the same course imagery, worked decisions and source case in a 28-slide teaching companion. Practise classification, compare explained choices and inspect the linked model case.
Open the interactive presentation workshop · Download PowerPoint
This optional companion does not replace the required course activities or final assessment.