Workplace practice sheets
Use the fictional evidence in your own notes. The exercises do not create or approve operational records.
Load-and-route planning exercise
For the motor case, identify avoidance options, missing load data, equipment configuration, route and landing risks, role and signal arrangements, stop conditions and evidence for responsible release.
- Fictional exercise: A workshop needs to move a motor. The proposed equipment has an examination report, but the load information, attachment arrangement and shared pedestrian route are not fully confirmed.
- For the motor case, identify avoidance options, missing load data, equipment configuration, route and landing risks, role and signal arrangements, stop conditions and evidence for responsible release.
- Make three columns: observed facts, missing evidence and the responsible action. State the condition that prevents starting or requires stopping, and the verification needed before release. Do not invent results or approvals.
Open the live SHAREhub resource ↗
Optional extension. Live SHAREhub tools may need a separate sign-in. The included exercise works offline and submits no workplace record.
Optional visual practice and worked application
Use these fictional exercises to compare evidence and rehearse decisions. They do not alter course completion or assessment requirements. You can work through the same choices on paper.
Plan the complete operation rather than the load number
Fictional continuing case. The team has an earlier examination report and a familiar load mass. It has not reviewed the changed reach, configuration, route or landing.
Whole-operation scope
Consider the actual load, equipment configuration, ground/route, people, communication and landing. Equal mass does not make a routine pallet and unusual fragile assembly the same planning problem.
Assurance types differ
Condition checks, maintenance, examination and an operation plan answer different questions. A report does not approve every later load, reach or destination.
Worked planning hold
Known changes: unstable/loose assembly, reach and pedestrian landing interface. Unresolved: suitable configuration and method, load security and accessory identity. Keep the affected move on hold for the competent planning route; invent no capacity from the picture.
Sort the lifting-operation evidence
Fictional worked application: A fictional workshop plans to move a stable pallet. The current load is instead a fragile assembly with loose parts and an altered centre of gravity. An accessory’s identification does not match its report, and a new landing point crosses the pedestrian route. Stage evidence: The team has an earlier examination report and a familiar load mass. It has not reviewed the changed reach, configuration, route or landing.
Sort the lifting-operation evidence. Use the evidence in this stage, rather than assuming what happened off screen.
- The operating reach differs from the accepted configuration. Actual operation question to resolve. The arrangement must suit the actual load and conditions.
- The landing point crosses an occupied pedestrian route. Actual operation question to resolve. The complete move needs control of the new interface.
- An earlier report covers identified equipment within its scope. Limited evidence not a complete lift plan. It does not determine the later route and load method.
- Both the pallet and fragile assembly have the same stated mass. Limited evidence not a complete lift plan. Complexity, stability and competent needs can still differ.
Assess the complete lifting-operation pathway
Draw pickup, path, interface and landing. Add actual load/configuration assumptions, accessory identity, people, communication and stop triggers. Distinguish a condition report from an operation plan; invent no lifting capacity or engineering limit.
Draw pickup, path, interface and landing. Add actual load/configuration assumptions, accessory identity, people, communication and stop triggers. Distinguish a condition report from an operation plan; invent no lifting capacity or engineering limit.
Use only a fictional or authorised non-confidential example. Keep planned actions separate from verified current protection.
A saved practice entry does not alter the graded course or authorise work.
Resolve the accessory and load before movement
Fictional continuing case. The damaged sling is replaced, but its replacement identification is not yet matched to the report. A colleague proposes a trial lift to settle suitability.
Identity is not a load test
Retain the affected use until suitable condition and identity evidence are established. A trial load must not be used to discover whether an unidentified item is suitable.
Load and method remain current
The loose parts and fragile configuration need suitable competent planning. Replacing an accessory corrects one condition, not the unreviewed destination or load-security question.
Movement control
Agree clear communication and the planned safe stop. A lost view, conflicting instructions or an uncontrolled crossing is not settled by moving slowly or choosing a random signal.
Choose the readiness evidence for this changed move
Fictional worked application: A fictional workshop plans to move a stable pallet. The current load is instead a fragile assembly with loose parts and an altered centre of gravity. An accessory’s identification does not match its report, and a new landing point crosses the pedestrian route. Stage evidence: The damaged sling is replaced, but its replacement identification is not yet matched to the report. A colleague proposes a trial lift to settle suitability.
Choose the readiness evidence for this changed move. Select every defensible evidence or action; leave unsupported substitutes unselected.
- Match accessory identification to the relevant suitability and condition evidence. Relevant evidence. A similar-looking item cannot simply borrow another report.
- Review load security, configuration, full path and landing with competent planning. Relevant evidence. The actual assembly and destination differ from the routine template.
- Use a trial move to prove the accessory identity and clear the planning gap. Insufficient evidence. An improvised move is not the missing evidence.
- Treat the replacement sling as approval for the unassessed landing route. Insufficient evidence. One corrected condition cannot settle another open operation requirement.
Assess the complete lifting-operation pathway
Draw pickup, path, interface and landing. Add actual load/configuration assumptions, accessory identity, people, communication and stop triggers. Distinguish a condition report from an operation plan; invent no lifting capacity or engineering limit.
Draw pickup, path, interface and landing. Add actual load/configuration assumptions, accessory identity, people, communication and stop triggers. Distinguish a condition report from an operation plan; invent no lifting capacity or engineering limit.
Use only a fictional or authorised non-confidential example. Keep planned actions separate from verified current protection.
A saved practice entry does not alter the graded course or authorise work.
Reopen the plan when control is lost
Fictional continuing case. During the planned move, agreed view and communication are lost at the crossing. A second person gives a different instruction. Maintenance paperwork is later offered as release evidence.
Use the planned safe stop
Restore workable communication and controls through the operation plan. The clear view at the briefing does not establish the current state.
Keep assurance scoped
A maintenance work order records the work done. Required examination, functional acceptance or remaining operation-readiness evidence must not be assumed from it.
Verify the whole move
A powered aid can reduce manual effort while introducing movement/stability hazards. Retain those in the actual route and task review rather than declaring all handling risk eliminated.
Follow the move after a communication change
Fictional worked application: A fictional workshop plans to move a stable pallet. The current load is instead a fragile assembly with loose parts and an altered centre of gravity. An accessory’s identification does not match its report, and a new landing point crosses the pedestrian route. Stage evidence: During the planned move, agreed view and communication are lost at the crossing. A second person gives a different instruction. Maintenance paperwork is later offered as release evidence.
Are the agreed view, signals and control of the operation currently workable?
- Are the agreed view, signals and control of the operation currently workable?
- No / not established in this case: Conflicting directions and lost view invalidate the previous communication basis. Next: Current decision — Use the planned safe stop and restore the communication/control arrangement.
- Yes, supported by the stated evidence: Proceed to the separate verification question; the first condition alone is not the final decision. Next: Are the changed load, accessory and destination conditions accepted on relevant evidence?
- Current decision
Use the planned safe stop and restore the communication/control arrangement.
- Are the changed load, accessory and destination conditions accepted on relevant evidence?
- The relevant evidence is still missing: Retain the relevant hold until the remaining readiness evidence is established. Next: Verification still required — Retain the relevant hold until the remaining readiness evidence is established.
- Yes, the responsible check is evidenced within its scope: Resume only within the competent accepted operation scope. Next: Scoped decision supported — Resume only within the competent accepted operation scope.
- Verification still required
Retain the relevant hold until the remaining readiness evidence is established.
- Scoped decision supported
Resume only within the competent accepted operation scope.
Assess the complete lifting-operation pathway
Draw pickup, path, interface and landing. Add actual load/configuration assumptions, accessory identity, people, communication and stop triggers. Distinguish a condition report from an operation plan; invent no lifting capacity or engineering limit.
Draw pickup, path, interface and landing. Add actual load/configuration assumptions, accessory identity, people, communication and stop triggers. Distinguish a condition report from an operation plan; invent no lifting capacity or engineering limit.
Use only a fictional or authorised non-confidential example. Keep planned actions separate from verified current protection.
A saved practice entry does not alter the graded course or authorise work.
Optional choices save on this browser, separately from recorded course progress. Live tools retain their own access and competent-review requirements.