Storage, delivery and handling-route check

BOUK-CHK-MAN-01 · v1.0 · Blank editable master · DOCX

Reduce double handling, height/reach demands and poor access.

Download editable DOCXView this policy branch

Read-only preview. Use the downloaded native file for your own working copy. Examples are fictional; signatures, work releases and operational evidence remain separate.

ROUTINE FIRST-LINE CHECK

Blank editable checklist. Reduce double handling, height/reach demands and poor access. Use actual evidence for the defined scope. No inspection, approval or signature is prefilled.

Location and taskChecker and date
Site: ___________________
Area / asset: ___________________
Checker: ___________________
Date: ___________ Shift: ___________
Scope / approved criteria
Direct delivery of blocks to suitable work height. Stop a handling task when the agreed aid, route, grip, staffing or placement control is missing, or the load or worker cannot be managed as assessed.

Version: 1.0 | * = critical control. Observe safely; never defeat a guard or open live equipment.

RefClosed control questionOne response
C01Is the planned route clear?Yes No N/A
C02Has avoidable manual lifting been removed from this task?Yes No N/A
C03Is the load weight known before movement?Yes No N/A
C04Are the load's handholds usable?Yes No N/A
C05Is the destination space available?Yes No N/A
C06Is the assessed lifting aid ready?Yes No N/A
C07Is the lifting aid within its rated capacity?Yes No N/A
C08Is the load stable for movement?Yes No N/A
YesNoN/AScore %

Yes = 1; No = 0. Score = Yes / (Yes + No) x 100. N/A needs a reason and is excluded, not a pass. Unanswered checks remain incomplete. A critical failure requires immediate containment and escalation regardless of the score. This is not certification of safety or compliance.

Findings actions and review

Record each No finding and N/A reason by check reference. Make unsafe conditions safe before continuing. Give each action a named owner and due date.

CheckFinding / N/A reason / immediate controlAction owner / required actionDue / evidence
Review fieldAuditor or verifier entry
Checker name / signature / date
Supervisor or verifier / date
Restrictions / escalation / restart authority
Verification / evidence / effectiveness
Next routine check date
Deeper review neededYes No
Offline photograph or evidence reference
Insert image or record evidence details here

Compare only the same checklist version, wording, criteria and N/A pattern. Record the same area, asset and shift consistently. A high score does not override a failed critical control.

Regulatory context: Great Britain baseline; Northern Ireland, fire and environmental duties need nation-specific review. These are original monitoring checks, not legal certification.

Background reading

Manual handling

Content basis

Built from the BuildOut policy and arrangement register, the SHARE policy/risk/routine-checklist/audit databases and the linked SHAREknowledge topics.

Register legal summaries retain their own review dates. No actual inspection, clinical record, specialist certificate or company approval is represented.