ROUTINE FIRST-LINE CHECK
Blank editable checklist. Check control use, suitability and practical effectiveness. Use actual evidence for the defined scope. No inspection, approval or signature is prefilled.
| Location and task | Checker and date |
|---|---|
| Site: ___________________ Area / asset: ___________________ | Checker: ___________________ Date: ___________ Shift: ___________ |
| Scope / approved criteria |
|---|
| Correct fitting and condition of hearing protectors. Stop or restrict the noisy task when assessed source controls, separation or required hearing protection fail, or the exposure basis no longer matches the work. |
Version: 1.0 | * = critical control. Observe safely; never defeat a guard or open live equipment.
| Ref | Closed control question | One response |
|---|---|---|
| C01 | * Does the exposure assessment cover the actual noisy tasks and durations? | Yes No N/A |
| C02 | * Are quieter methods and task-suitable lower-noise equipment in use where practicable? | Yes No N/A |
| C03 | * Are acoustic enclosures barriers and equipment maintenance effective? | Yes No N/A |
| C04 | Are nearby workers protected through separation and work sequencing? | Yes No N/A |
| C05 | Are required hearing-protection zones and access arrangements clear? | Yes No N/A |
| C06 | Is hearing protection suitable compatible serviceable and correctly used? | Yes No N/A |
| C07 | Are competent exposure evaluation and indicated surveillance arrangements in place? | Yes No N/A |
| C08 | * Are changed duration symptoms or failed controls referred for review before unsafe exposure continues? | Yes No N/A |
| Yes | No | N/A | Score % |
|---|---|---|---|
Yes = 1; No = 0. Score = Yes / (Yes + No) x 100. N/A needs a reason and is excluded, not a pass. Unanswered checks remain incomplete. A critical failure requires immediate containment and escalation regardless of the score. This is not certification of safety or compliance.
Findings actions and review
Record each No finding and N/A reason by check reference. Make unsafe conditions safe before continuing. Give each action a named owner and due date.
| Check | Finding / N/A reason / immediate control | Action owner / required action | Due / evidence |
|---|---|---|---|
| Review field | Auditor or verifier entry |
|---|---|
| Checker name / signature / date | |
| Supervisor or verifier / date | |
| Restrictions / escalation / restart authority | |
| Verification / evidence / effectiveness | |
| Next routine check date | |
| Deeper review needed | Yes No |
| Offline photograph or evidence reference |
|---|
| Insert image or record evidence details here |
Compare only the same checklist version, wording, criteria and N/A pattern. Record the same area, asset and shift consistently. A high score does not override a failed critical control.
Regulatory context: Great Britain baseline; Northern Ireland, fire and environmental duties need nation-specific review. These are original monitoring checks, not legal certification.