Material/product substitution safety review

BOUK-CHK-SUB-03 · v1.0 · Blank editable master · DOCX

Check changed hazards, installation method and compatibility before substitution.

Download editable DOCXView this policy branch

Read-only preview. Use the downloaded native file for your own working copy. Examples are fictional; signatures, work releases and operational evidence remain separate.

ROUTINE FIRST-LINE CHECK

Blank editable checklist. Check changed hazards, installation method and compatibility before substitution. Use actual evidence for the defined scope. No inspection, approval or signature is prefilled.

Location and taskChecker and date
Site: ___________________
Area / asset: ___________________
Checker: ___________________
Date: ___________ Shift: ___________
Scope / approved criteria
New adhesive requiring different ventilation and PPE. Hold appointment, delivery or work when necessary competence, safeguards, technical information or coordinated arrangements cannot be demonstrated.

Version: 1.0 | * = critical control. Observe safely; never defeat a guard or open live equipment.

RefClosed control questionOne response
C01* Is the proposed material or product substitution precisely identified?Yes No N/A
C02* Are the reason and affected design task and occupied interfaces recorded?Yes No N/A
C03* Are exposure fire compatibility and installation effects reassessed?Yes No N/A
C04Are current product data and required competent design or specialist advice available?Yes No N/A
C05Have safer alternatives and lifecycle maintenance implications been considered?Yes No N/A
C06Are revised assessments methods PPE and waste arrangements adequate?Yes No N/A
C07Are affected users and dutyholders informed before the substitution is used?Yes No N/A
C08* Is use held until necessary acceptance evidence and control changes are verified?Yes No N/A
YesNoN/AScore %

Yes = 1; No = 0. Score = Yes / (Yes + No) x 100. N/A needs a reason and is excluded, not a pass. Unanswered checks remain incomplete. A critical failure requires immediate containment and escalation regardless of the score. This is not certification of safety or compliance.

Findings actions and review

Record each No finding and N/A reason by check reference. Make unsafe conditions safe before continuing. Give each action a named owner and due date.

CheckFinding / N/A reason / immediate controlAction owner / required actionDue / evidence
Review fieldAuditor or verifier entry
Checker name / signature / date
Supervisor or verifier / date
Restrictions / escalation / restart authority
Verification / evidence / effectiveness
Next routine check date
Deeper review neededYes No
Offline photograph or evidence reference
Insert image or record evidence details here

Compare only the same checklist version, wording, criteria and N/A pattern. Record the same area, asset and shift consistently. A high score does not override a failed critical control.

Regulatory context: Great Britain baseline; Northern Ireland, fire and environmental duties need nation-specific review. These are original monitoring checks, not legal certification.

Background reading

How should contractors and supply chains be managed safely?

Provision and Use of Work Equipment (PUWER)

Content basis

Built from the BuildOut policy and arrangement register, the SHARE policy/risk/routine-checklist/audit databases and the linked SHAREknowledge topics.

Register legal summaries retain their own review dates. No actual inspection, clinical record, specialist certificate or company approval is represented.