SHAREhub home

Ladder and short-duration access justification/check

BOUK-CHK-WAH-01 · v1.0 · Blank editable master · DOCX

Demonstrate suitability for low-risk work and check condition and positioning.

Download editable DOCXView this policy branch

Read-only preview. Use the downloaded native file for your own working copy. Examples are fictional; signatures, work releases and operational evidence remain separate.

ROUTINE FIRST-LINE CHECK

Blank editable checklist. Demonstrate suitability for low-risk work and check condition and positioning. Use actual evidence for the defined scope. No inspection, approval or signature is prefilled.

Location and taskChecker and date
Site: ___________________
Area / asset: ___________________
Checker: ___________________
Date: ___________ Shift: ___________
Scope / approved criteria
Short-duration inspection in a constrained area. Stop height work when ground, weather, edge protection, access, equipment, falling-object protection or the required rescue capability no longer meets the plan.

Version: 1.0 | * = critical control. Observe safely; never defeat a guard or open live equipment.

RefClosed control questionOne response
C01Is the selected access equipment identified in the task plan?Yes No N/A
C02Is the access route clear of obstructions?Yes No N/A
C03Is ladder use justified by the task assessment?Yes No N/A
C04Is the ladder suitable for the task?Yes No N/A
C05* Is the ladder secured against slipping?Yes No N/A
C06Is the leaning ladder at the specified angle?Yes No N/A
C07Is access above the landing arranged as specified?Yes No N/A
C08Is the task within the ladder's load rating?Yes No N/A
YesNoN/AScore %

Yes = 1; No = 0. Score = Yes / (Yes + No) x 100. N/A needs a reason and is excluded, not a pass. Unanswered checks remain incomplete. A critical failure requires immediate containment and escalation regardless of the score. This is not certification of safety or compliance.

Findings actions and review

Record each No finding and N/A reason by check reference. Make unsafe conditions safe before continuing. Give each action a named owner and due date.

CheckFinding / N/A reason / immediate controlAction owner / required actionDue / evidence
Review fieldAuditor or verifier entry
Checker name / signature / date
Supervisor or verifier / date
Restrictions / escalation / restart authority
Verification / evidence / effectiveness
Next routine check date
Deeper review neededYes No
Offline photograph or evidence reference
Insert image or record evidence details here

Compare only the same checklist version, wording, criteria and N/A pattern. Record the same area, asset and shift consistently. A high score does not override a failed critical control.

Regulatory context: Great Britain baseline; Northern Ireland, fire and environmental duties need nation-specific review. These are original monitoring checks, not legal certification.

Background reading

Working at Height

Dropped Objects

Scaffolding Safety

Content basis

Built from the BuildOut policy and arrangement register, the SHARE policy/risk/routine-checklist/audit databases and the linked SHAREknowledge topics.

Register legal summaries retain their own review dates. No actual inspection, clinical record, specialist certificate or company approval is represented.