Safety-critical design information transmittal

BOUK-FRM-DES-02 · v1.0 · Blank editable master · DOCX

Record issue and acknowledgement of significant residual risks.

Download editable DOCXView this policy branch

Read-only preview. Use the downloaded native file for your own working copy. Examples are fictional; signatures, work releases and operational evidence remain separate.

BOUK-FRM-DES-02 | Version 1.0 | 23 October 2026 | GB baseline

BLANK EDITABLE MASTER. Record actual facts, evidence and decisions. Operational entries, signatures and approvals are blank.

Record issue and acknowledgement of significant residual risks.

Record identityActual entry
Record reference and project
Exact location task and date
Recorder role and competence

Scope facts and prerequisites

Required informationActual evidence or decision
Transmittal ID date sender and recipients
Drawing or specification references and revisions
Safety-critical assumption limit or residual risk
Affected activity asset and work boundary
Required action before use

Decisions handover and verification

Hold procurement, fabrication or construction when a design assumption, capacity, support condition, lifting point or significant residual risk is unresolved. Site convenience does not authorise a design alteration.

Required informationActual evidence or decision
Recipients acknowledgement of understanding
Missing information and work hold
Superseded information withdrawn
Follow-up confirmation
Finding or actionOwner and due dateEvidence and effectiveness
Review and acceptanceActual entry
Reviewer name role and date
Required signatures and date
Remaining restrictions and restart authority

Retain factual evidence and limitations. A signature, permit or tick does not establish that the physical controls work. Use the separate procedure and the completed decision example for guidance; never copy an example as an actual result.

Guidance What are the Construction Design and Management Regulations? · Foundations of Construction Health and Safety Management

Content basis

Built from the BuildOut policy and arrangement register, the SHARE policy/risk/routine-checklist/audit databases and the linked SHAREknowledge topics.

Register legal summaries retain their own review dates. No actual inspection, clinical record, specialist certificate or company approval is represented.