BOUK-FRM-PTW-01 | Version 1.0 | 23 October 2026 | GB baseline
BLANK EDITABLE MASTER. Record actual facts, evidence and decisions. Operational entries, signatures and approvals are blank.
Record energy source, isolation point, lock owner, verification and restoration.
| Record identity | Actual entry |
|---|---|
| Record reference and project | |
| Exact location task and date | |
| Recorder role and competence |
Scope facts and prerequisites
| Required information | Actual evidence or decision |
|---|---|
| System equipment boundary and linked permits | |
| Energy and material sources including stored energy | |
| Isolation point ID method lock tag and responsible person | |
| Verification or test reference and competent checker | |
| Residual hazards and protective measures |
Decisions handover and verification
Suspend the permit when the scope, operating state, isolation or other prerequisite changes or fails. Restart requires revalidation by the authorised roles.
| Required information | Actual evidence or decision |
|---|---|
| Lock ownership key control and shift transfer | |
| Suspension changes and affected teams | |
| Removal sequence and reinstatement authority | |
| Final condition and controlled handback |
| Finding or action | Owner and due date | Evidence and effectiveness |
|---|---|---|
| Review and acceptance | Actual entry |
|---|---|
| Reviewer name role and date | |
| Required signatures and date | |
| Remaining restrictions and restart authority |
Retain factual evidence and limitations. A signature, permit or tick does not establish that the physical controls work. Use the separate procedure and the completed decision example for guidance; never copy an example as an actual result.
Guidance Permit-to-work Systems · Isolation, Lockout and Line Breaking