BOUK-PLN-CONS-01 | Version 1.0 | 23 October 2026 | GB baseline
COMPLETED FICTIONAL EXAMPLE. BuildOut UK Ltd is an illustrative construction business. The arrangements and cases below are examples for adaptation; no actual work, approval or signature is represented.
Choose consultation routes and opportunities that reach employees and subcontractors.
Example project context
This plan belongs to the fictional 2027 BuildOut portfolio: Eastfield commercial refurbishment, Harbour retail fit out, Foundry light-industrial build and Meadow residential development. Apply the stated arrangements only to the relevant task and phase. The example has no real site address, named staff or technical certification. Project-specific engineering, exposure and rescue information remains a prerequisite to genuine work release.
| Plan control | Completed example arrangement |
|---|---|
| Accountable role | Competent health and safety adviser coordinates the plan and confirms competent deputies. |
| Activities and interfaces | Monthly forum and daily trade coordination |
| Risk and policy link | BOUK-POL-CONS and the current task register; map affected work packages before release. |
| Resources and timing | Project manager confirms competent people, equipment, welfare, time and specialist input before the relevant phase. Site manager reviews the next eight weeks at weekly coordination. |
| Change route | Changed scope, equipment, sequence, people or site conditions reopen the affected plan and task release. |
Delivery stages responsibilities and evidence
| When and owner | Completed arrangement | Evidence required |
|---|---|---|
| Before appointment Competent health and safety adviser | The competent adviser and Site Manager provide meaningful consultation in good time on risk assessments, changed methods, equipment selection, welfare, training and major control decisions. | Consultation plan; representative meetings; worker suggestions; response and feedback log; evidence that controls changed |
| Before mobilisation Project manager and competent specialist | Daily briefings and trade coordination include direct employees, subcontractors and agency workers. Recognised representatives use the applicable consultation route, and workers can raise confidential concerns without adverse treatment. | Consultation plan; representative meetings; worker suggestions; response and feedback log; evidence that controls changed |
| At each relevant work stage Site manager and Trade supervisor | A supervisor records the issue, action owner, time for feedback and any immediate restriction. Urgent concerns are acted on at once, not deferred to the monthly forum. | Consultation plan; representative meetings; worker suggestions; response and feedback log; evidence that controls changed |
| After change or before handback Site manager and competent reviewer | The manager checks whether the proposed control is practical with those doing the task and explains why a suggestion was adopted, modified or declined. Consultation does not transfer the employer’s duty to workers. | Consultation plan; representative meetings; worker suggestions; response and feedback log; evidence that controls changed |
Hold points and safe release
Stop affected work when a consultation report identifies an uncontrolled serious risk; resolve it before asking workers to continue.
At a failed prerequisite, the supervisor holds the affected work and protects people. The Site Manager records the boundary and communicates it to adjacent teams. The competent specialist resolves technical conditions; the authorised operating role checks implementation, briefs changes and records the release conditions. Recheck a later change rather than extending an expired acceptance automatically.
Specific plan arrangements
Representation
The Site manager confirms the applicable employee representation route and includes direct employees, subcontractors, agency staff and evening teams in practical communication. Representatives receive time and usable information.
Daily contact
Supervisors use workface briefings to explain planned work, changes and stop conditions and invite practical objections. They verify understanding rather than collecting attendance alone.
Weekly coordination
Trade representatives review the next work sequence, delivery routes, shared access, welfare and simultaneous work before those decisions are fixed.
Monthly forum
The Project manager reviews worker concerns, proposed equipment/product changes, audit learning and the response to earlier suggestions. Record adopted, modified and declined proposals with reasons.
Urgent concerns
An uncontrolled serious risk is restricted immediately and escalated to the Site manager. Do not wait for a monthly meeting; confidential reporting remains available.
Feedback and effectiveness
The issue owner gives feedback by the agreed date and checks the changed control with affected workers. Reopen impractical or ineffective arrangements and review whether all shifts were reached.
Practical application and review
Worked decision trail
| Fictional situation | Decision and evidence |
|---|---|
| What changes | A proposed delivery route crosses the break-area entrance. |
| Response | Workers identify the conflict before installation; the Site Manager changes the route and explains the decision to all shifts. |
| Verification | Observe a busy delivery and seek feedback from workers using the entrance. |
How can the ISO 45001 hierarchy of controls turn worker consultation into stronger risk controls
Ask the people who do the job before approving a change, test the proposal at work and close the feedback loop.
Show how worker input changes the decision
Consultation needs a proposal people can understand, a usable representation route and a response that explains what changed. It is more than collecting attendance signatures.
Assurance and update cycle
Supervisors check the controls before relevant work and after change. The Site Manager samples implementation during actual work; the H&S adviser challenges recurring gaps and the plan owner reviews the resulting evidence. Specialist and statutory inspections retain their own competent methods and required intervals. Actions need both completion evidence and a separate effectiveness check; reopen a failed change.