BOUK-PRO-CONF | Version 1.0 | 23 October 2026 | GB baseline
COMPLETED FICTIONAL EXAMPLE. BuildOut UK Ltd is an illustrative construction business. The arrangements and cases below are examples for adaptation; no actual work, approval or signature is represented.
Classify the space, isolate, test/control atmosphere, authorise entry and rehearse rescue.
Scope and operating responsibility
We apply this procedure to Service duct, tank, chamber or deep excavation. Evidence includes Avoid-entry review; confined-space assessment; isolation and atmosphere evidence; entry authorisation; communication and rescue-readiness checks. The role controlling the task checks applicability before mobilisation and whenever the scope changes.
| Role | Required action |
|---|---|
| Authorised specialist / appointed person | Own this arrangement, confirm competent support and maintain its evidence trail. |
| Project manager and Site manager | Coordinate the actual package, provide resources and verify prerequisites before release; resolve occupied and subcontractor interfaces. |
| Trade supervisor and workers | Use the accepted current method, demonstrate understanding, report changes and stop when critical safeguards are uncertain. |
| Competent specialist and H&S adviser | Provide technical advice within competence; challenge evidence and identify limitations. Management retains the operating decision. |
Inputs before using the procedure
Use the current project risk register, relevant survey and design revisions, equipment or product information, worker consultation and the task-specific records listed below. Resolve conflicting or missing information before relying on it. Do not fill missing technical values from an example.
How we carry out the arrangement
1 Plan and obtain reliable information
Avoid entry to service ducts, tanks, chambers and other confined spaces where the task can be completed without entry. A deep excavation is assessed for its conditions rather than labelled safe or confined from depth alone.
2 Verify capability and prerequisites
A competent assessment addresses specified risks, connections, isolation, atmosphere, ingress, access, work activity and people outside. Monitoring and ventilation must suit the actual hazard and method.
3 Control work and interfaces
Where entry is necessary, the supervisor verifies the safe system, competent team, communication and suitable rescue arrangements before authorisation; a permit alone does not make entry safe.
4 Review change and safe handback
The rescue team and equipment must be available and capable for the space. Emergency services are contacted as necessary but are not the sole planned rescue provision.
Stop restrict and restart
Prohibit entry or withdraw if isolation, atmosphere, communication, monitoring, staffing or rescue readiness is not maintained.
The person controlling the work makes the affected area safe and notifies the Site Manager. Restart requires the competent technical decision for the actual control, the authorised work-release decision and a fresh briefing of affected people. Record unresolved limits; an updated date or a completed form does not remove a hold.
Practical control detail
An emergency response plan should tell people what to do for the incidents their workplace could face: raise the alarm, protect people, call help, isolate a hazard only when safe, and hand over to responders. Choose evacuation or shelter from the actual threat, include contractors and visitors, and test night-shift and changed-route conditions before relying on the plan. Retain the scenario, role checks, alarm test and improvement actions; retest any failed arrangement.
Confined-space risk assessment should identify the space, the specified risks, the work activity, changing conditions, affected people and the controls needed before entry.
Evidence follow up and learning
Worked decision trail
| Fictional situation | Decision and evidence |
|---|---|
| What changes | A drainage camera task is changed to proposed chamber entry. |
| Response | Entry remains prohibited until a competent space-specific safe system, isolation, monitoring, team and rescue capability are established. |
| Verification | Verify those prerequisites at the space; a permit and a call to emergency services alone are insufficient. |
Supporting arrangement documents
| Reference | How the document is used |
|---|---|
| BOUK-RA-CONF-01 Confined-space identification and avoidance assessment | Determine confined-space status and specified risks; explore work without entry. |
| BOUK-PTW-CONF-01 Confined-space entry permit and handback | Confirm isolation, atmospheric testing, ventilation, entrants, standby and rescue readiness. |
| BOUK-PLN-CONF-01 Confined-space rescue and emergency plan | Provide suitable rescue arrangements and competent people before entry. |
| BOUK-FRM-CONF-01 Atmospheric test, equipment and entrant log | Record readings, test equipment status, entrants and changing conditions. |
| BOUK-CHK-CONF-01 Confined-space drill and readiness review | Test practical rescue communications, equipment and team readiness. |
Retain the record ID, task, location, competent author, revision, date, decision, restrictions, action owner and separate effectiveness evidence. Restrict personal and health information and apply the relevant retention rule. File genuine results separately from teaching examples.