Design review and residual-risk communication procedure

BOUK-PRO-DES · v1.0 · Completed fictional example · DOCX

Record design decisions, interfaces, change control and safety-critical information.

Download editable DOCXView this policy branch

Read-only preview. Use the downloaded native file for your own working copy. Examples are fictional; signatures, work releases and operational evidence remain separate.

BOUK-PRO-DES | Version 1.0 | 23 October 2026 | GB baseline

COMPLETED FICTIONAL EXAMPLE. BuildOut UK Ltd is an illustrative construction business. The arrangements and cases below are examples for adaptation; no actual work, approval or signature is represented.

Record design decisions, interfaces, change control and safety-critical information.

Scope and operating responsibility

We apply this procedure to Roof plant access, glazed panels and lifting points. Evidence includes Design responsibility matrix; option and buildability reviews; significant design-risk register; checked design releases; change and residual-risk handover. The role controlling the task checks applicability before mobilisation and whenever the scope changes.

RoleRequired action
Design manager / appointed designerOwn this arrangement, confirm competent support and maintain its evidence trail.
Project manager and Site managerCoordinate the actual package, provide resources and verify prerequisites before release; resolve occupied and subcontractor interfaces.
Trade supervisor and workersUse the accepted current method, demonstrate understanding, report changes and stop when critical safeguards are uncertain.
Competent specialist and H&S adviserProvide technical advice within competence; challenge evidence and identify limitations. Management retains the operating decision.

Inputs before using the procedure

Use the current project risk register, relevant survey and design revisions, equipment or product information, worker consultation and the task-specific records listed below. Resolve conflicting or missing information before relying on it. Do not fill missing technical values from an example.

How we carry out the arrangement

1 Plan and obtain reliable information

The Design Coordinator identifies who prepares or changes each design, including temporary works, shop drawings, substitutions and contractor-designed elements. Procurement or site changes that affect design are returned to the responsible competent designer.

2 Verify capability and prerequisites

Design reviews consider construction, use, access, cleaning, maintenance, foreseeable repair and demolition. For rooftop plant, the team compares locating maintainable equipment at ground level or providing permanent safe access before relying on repeated temporary access.

3 Control work and interfaces

The design risk register records the significant foreseeable risks, options considered, residual assumptions, design owner and information needed by the next dutyholder. It highlights unusual or difficult-to-manage risks rather than filling a register with generic site hazards.

4 Review change and safe handback

Glazed panels, lifting points, temporary stability and plant-replacement routes receive coordinated design and buildability review. Required calculations and checks are accepted through the project design process before manufacture or installation.

Stop restrict and restart

Hold procurement, fabrication or construction when a design assumption, capacity, support condition, lifting point or significant residual risk is unresolved. Site convenience does not authorise a design alteration.

The person controlling the work makes the affected area safe and notifies the Site Manager. Restart requires the competent technical decision for the actual control, the authorised work-release decision and a fresh briefing of affected people. Record unresolved limits; an updated date or a completed form does not remove a hold.

Practical control detail

Client information, design coordination and construction-phase planning form a connected route. Notification is a separate check, rather than permission to start unsafe work.

Higher-risk construction work should pass through clear control gates before work starts, when conditions change and before work is handed back.

Evidence follow up and learning

Worked decision trail

Fictional situationDecision and evidence
What changesA revised roof plant layout removes safe maintenance access.
ResponseThe Design Manager returns the design for safer access and records residual hazards that cannot be eliminated.
VerificationTrace the accepted revision through construction drawings and the final maintenance information.

Supporting arrangement documents

ReferenceHow the document is used
BOUK-REG-DES-01
Design hazard and residual-risk register
Track design elimination/reduction decisions and residual risks requiring communication.
BOUK-FRM-DES-01
Design risk review and change approval record
Review buildability, temporary stability, use and maintenance interfaces.
BOUK-CHK-DES-01
Designer capability and appointment checklist
Confirm role, skills, knowledge, experience and organisational capability.
BOUK-FRM-DES-02
Safety-critical design information transmittal
Record issue and acknowledgement of significant residual risks.
BOUK-CHK-DES-02
Building-control and higher-risk-building interface screen
Determine whether additional building-safety appointments, controls and approvals require specialist review.

Retain the record ID, task, location, competent author, revision, date, decision, restrictions, action owner and separate effectiveness evidence. Restrict personal and health information and apply the relevant retention rule. File genuine results separately from teaching examples.

Guidance What are the Construction Design and Management Regulations? · Foundations of Construction Health and Safety Management

Content basis

Built from the BuildOut policy and arrangement register, the SHARE policy/risk/routine-checklist/audit databases and the linked SHAREknowledge topics.

Register legal summaries retain their own review dates. No actual inspection, clinical record, specialist certificate or company approval is represented.