BuildOut UK Ltd
BOUK-RAMS-TW-01 v1.0 | BLANK EDITABLE MASTER | Temporary support, hose-whip/pressure, cement contact, access and concrete placement sequence.
| Field | Detail | Field | Detail |
|---|---|---|---|
| Assessment date | Not recorded | Review date | Not recorded |
| Organisation | BuildOut UK Ltd | Location / work area | Not recorded |
| Assessment scope | Complete for the actual task, footprint, people and interfaces. Pump concrete into a slab or supported formwork | Assessor | ________________________ |
| Method | Qualitative workplace assessment | Status / revision | Document · Revision 1 |
Assessment inputs for this task
| Information to establish | Actual task input or evidence |
|---|---|
| Accept formwork support and concrete-placement design | |
| Verify pump position rated connections and delivery interface | |
| Inspect formwork bracing access and edge protection | |
| Control pour sequence loads pressure and hose handling | |
| Stop if support leakage or pressure conditions deviate | |
| Manage curing release striking and safe cleanout under accepted method |
Detailed risk assessment
| Hazard category and hazard | Who may be harmed and how | Existing controls and evidence | Further controls and actions | Completion timescale | Responsible job role |
|---|---|---|---|---|---|
Company policy or procedure context
BOUK-POL-TW
Hold loading, alteration or dismantling when a design, check, foundation, bracing, connection or sequence requirement is uncertain or no longer met.
User-supplied requirement context; not proof of control implementation or an approved issue.
Assessment method
Qualitative assessment: describe credible harm, exposure and control effectiveness in words. Prioritise proportionate improvements without numerical scoring. Proposed measures are not implemented controls; this document does not authorise work.
3 Priority actions and justification
Select and justify the actual priority actions after assessing the work. No priorities or risk acceptability are prefilled.
4 Communicate check and review
Communication recipients and method: Record the recipients, briefing method and practical understanding check.
Follow-up verification and escalation: Record the competent verifier, evidence, timing, escalation and conditions for reopening an ineffective action.
Review date: Not recorded
Earlier review triggers: Review changed scope, people, equipment, sequence or conditions; incidents, failed controls or new information.
Reviewer: ________________________
Review notes: Record limitations, prerequisites and the competent review decision.
Workplace review confirmation
Not yet recorded
SHARE source guidance
Foundations of Construction Health and Safety Management
https://www.sharehub.ltd/knowledge-hub/foundations-of-construction-health-and-safety-management.html
Scaffolding Safety
https://www.sharehub.ltd/knowledge-hub/scaffolding.html
Assessment boundary
Original SHARE workplace format informed by HSE and NEBOSH principles. Not an official NEBOSH template, endorsement or examination submission. Document contents require competent workplace review.
Team briefing: three quick checks
1. Who could be harmed by this activity and how?
Expected discussion: Identify exposed people and credible harm before briefing.
2. What safeguards must be checked before work starts?
Expected discussion: Confirm the task-specific controls.
3. When must the team stop and report a problem?
Expected discussion: Stop when required safeguards fail or conditions change; consult the supervisor.
Personnel acknowledgement and signatures
Acknowledgement confirms receipt and understanding of the briefing, not approval of the assessment or a waiver of rights. Ask questions before work; report changed conditions. Typed acknowledgements are self-recorded, not verified electronic identities.
| Name / email | Role | Signature / acknowledgement | Date |
|---|---|---|---|
| ________________________ | ________________ | ________________________ | ________________ |
| ________________________ | ________________ | ________________________ | ________________ |
| ________________________ | ________________ | ________________________ | ________________ |
| ________________________ | ________________ | ________________________ | ________________ |
| ________________________ | ________________ | ________________________ | ________________ |
| ________________________ | ________________ | ________________________ | ________________ |
Task method sequence and hold points
| Stage to define | Actual safe method controls and evidence | Responsible person and release |
|---|---|---|
| Accept formwork support and concrete-placement design | ||
| Verify pump position rated connections and delivery interface | ||
| Inspect formwork bracing access and edge protection | ||
| Control pour sequence loads pressure and hose handling | ||
| Stop if support leakage or pressure conditions deviate | ||
| Manage curing release striking and safe cleanout under accepted method |
Complete the actual sequence, equipment, competence, interfaces, critical hold points, emergency arrangements and safe handback. This master does not supply engineered limits or authorise the task. Use the linked procedure and specialist method where needed.