Register fields
| Field | Use |
|---|---|
| Design hazard ID | Enter the actual design hazard id for this item. Retain the referenced evidence separately. |
| Element stage and revision | Enter the actual element stage and revision for this item. Retain the referenced evidence separately. |
| Credible harm and people | Enter the actual credible harm and people for this item. Retain the referenced evidence separately. |
| Options eliminated or reduced | Enter the actual options eliminated or reduced for this item. Retain the referenced evidence separately. |
| Residual risk and communication | Enter the actual residual risk and communication for this item. Retain the referenced evidence separately. |
| Design owner | Enter the actual design owner for this item. Retain the referenced evidence separately. |
| Review due | Enter the actual review due for this item. Retain the referenced evidence separately. |
| Drawing or evidence reference | Enter the actual drawing or evidence reference for this item. Retain the referenced evidence separately. |
| Decision and outstanding hold | Enter the actual decision and outstanding hold for this item. Retain the referenced evidence separately. |
Fictional worked decision
A revised roof plant layout removes safe maintenance access.
The Design Manager returns the design for safer access and records residual hazards that cannot be eliminated.
Trace the accepted revision through construction drawings and the final maintenance information.
Worked register entries
| Design hazard ID | Element stage and revision | Credible harm and people | Options eliminated or reduced | Residual risk and communication | Design owner | Review due | Drawing or evidence reference | Decision and outstanding hold | Record check |
|---|---|---|---|---|---|---|---|---|---|
| EX DES01 | Roof plant access revision 2 | Falls during future maintenance | Relocate access to protected route | Residual access requirements briefed | Example Design manager | 06 Nov 2026 | EX drawing reference only | Await competent design acceptance | |
| EX DES02 | Roof plant access revision 2 | Falls during future maintenance | Residual access requirements briefed | Example Design manager | 06 Nov 2026 | EX drawing reference only | Await competent design acceptance | Missing Options eliminated or reduced ; |
The operational Register sheet is blank. The Guide sheet explains ownership, privacy, date checks, review and extension of the table. The Record check column identifies incomplete entries; it does not authorise work or prove effective controls.