SHAREhub home

Temporary works register and design-category record

BOUK-REG-TW-01 · v1.0 · Blank register with separate fictional worked entries · XLSX

Identify each temporary works item, design/check needs and status.

Download editable XLSXView this policy branch

Read-only preview. Use the downloaded native file for your own working copy. Examples are fictional; signatures, work releases and operational evidence remain separate.

Register fields

FieldUse
Temporary works IDEnter the actual temporary works id for this item. Retain the referenced evidence separately.
Description location and stageEnter the actual description location and stage for this item. Retain the referenced evidence separately.
Design category and checking routeEnter the actual design category and checking route for this item. Retain the referenced evidence separately.
Designer checker and coordinatorEnter the actual designer checker and coordinator for this item. Retain the referenced evidence separately.
Design revision evidenceEnter the actual design revision evidence for this item. Retain the referenced evidence separately.
Loading or dismantling restrictionEnter the actual loading or dismantling restriction for this item. Retain the referenced evidence separately.
Next inspection or review dueEnter the actual next inspection or review due for this item. Retain the referenced evidence separately.
Release referenceEnter the actual release reference for this item. Retain the referenced evidence separately.
Current controlled stateEnter the actual current controlled state for this item. Retain the referenced evidence separately.

Fictional worked decision

A trade wants to remove a prop to improve delivery access.

The Temporary Works Coordinator prohibits alteration until the competent designer and checking route resolve stability and sequence.

Check installed configuration against the accepted revision before the altered stage is released.

Worked register entries

Temporary works IDDescription location and stageDesign category and checking routeDesigner checker and coordinatorDesign revision evidenceLoading or dismantling restrictionNext inspection or review dueRelease referenceCurrent controlled stateRecord check
EX TW01Temporary prop at EastfieldCompetent design/check category requiredExample coordinator and specialistEX proposed revision referenceNo alteration or loading permitted26 Oct 2026Release not issuedHeld
EX TW02Temporary prop at EastfieldCompetent design/check category requiredEX proposed revision referenceNo alteration or loading permitted26 Oct 2026Release not issuedHeldMissing Designer checker and coordinator ;

The operational Register sheet is blank. The Guide sheet explains ownership, privacy, date checks, review and extension of the table. The Record check column identifies incomplete entries; it does not authorise work or prove effective controls.

Content basis

Built from the BuildOut policy and arrangement register, the SHARE policy/risk/routine-checklist/audit databases and the linked SHAREknowledge topics.

Register legal summaries retain their own review dates. No actual inspection, clinical record, specialist certificate or company approval is represented.