Construction traffic and mobile plant

Workers on a protected walkway separated by continuous guardrails from a site dumper on a UK construction site
Illustrative workplace context for this course.

Coordinate construction traffic, mobile plant, deliveries and pedestrian routes.

£0Free training
Approx. 2h–3hEstimated self-paced learning
18 lessons5 modules
20 questionsFinal assessment
Open this course in the LMS →

Full public teaching and readers are free to read without an account. A free learner account is required for confirmed saved assessment, completion and certificate records in the LMS.

What you will work through

Fictional Canal Yard project: early deliveries, revised hoarding and moving plant compete for limited space. You coordinate the movement plan and test whether people are protected throughout the journey.

The course has 5 modules and 18 lessons, with teaching, applied activities, feedback and a check of understanding throughout. There are 4 practice pauses in the actual construction model, with an equivalent accessible text route. Public interactive practice is separate from confirmed LMS assessment and completion records.

Explore the interactive practice copy. Return to the LMS route for recorded learning.

Learning outcomes

Course outline

MODULE 1

Plan the movement system

  1. Map the whole movement systemVehicle risk follows the whole journey and task. Boundaries and interfaces are often where the plan fails.
  2. Plan roles and communicate limitsDriver competence and site-specific information are both needed; unfamiliarity with local routes can defeat an otherwise sound plan.
  3. Protect people outside the boundaryPeople outside the site have no duty to understand its vehicle system. Plan the crossing and maintain a safe route.
  4. Design separation that survives the shiftA route must remain physically usable; a drawn line or signed plan does not protect people when the route is blocked.
MODULE 2

Separate people and plant

  1. Reversing, visibility and banksman limitsAvoid reversing where possible. A signaller is a residual control with clear limits, not a substitute for route design and exclusion.
  2. Select and authorise operatorsCompetence must match the equipment, attachment, task and conditions; a generic credential is only part of the evidence.
  3. Excavators: slew, buckets and quick hitchesAttachment security and exclusion must be positively verified. People must not be used to test a potentially unsafe attachment.
  4. Dumpers and overturn riskGround and route design control stability; skill and speed cannot correct an unsuitable edge or bearing condition.
MODULE 3

Select and control equipment

  1. Telehandlers: load, reach and groundCapacity changes with reach and configuration. Site conditions and the actual load must fit the planned operating limits.
  2. Deliveries, unloading and storageDelivery planning includes arrival, waiting, load security, unloading and storage. Schedule pressure does not establish a safe work area.
  3. Lifting interfaces and exclusionLoads, machines and people need a coordinated arrangement with clear exclusion and communication, not informal timing.
  4. Stationary plant and stored energyUnexpected restart, gravity, hydraulic pressure and other stored energy can remain after a normal stop. Maintenance access needs a safe isolation system.
MODULE 4

Check, maintain and respond

  1. Overhead lines and changing envelopesPlant can bridge a safe-looking gap as its envelope changes. Do not estimate safe clearance from appearance.
  2. Pre-use checks and defect controlA safety-critical defect is a hold point. The repair and return-to-service decision must be controlled and recorded.
  3. Fitness, fatigue and road journeysFitness changes during a shift. Work planning must allow safe decisions without pushing people to hide fatigue or impairment.
MODULE 5

Verify and improve

  1. Use records to challenge the layoutAssurance connects the current physical layout, behaviour and records. It must find and resolve divergence, not simply collect documents.
  2. Capstone: deliveries meet a changing siteSeveral individually plausible changes can create a system conflict. A coordinated restart must protect every affected route and person.
  3. Make one measurable improvementAn action needs a demonstrable change and a way to verify it. Awareness certificates do not authorise plant operation or traffic design.

Assessment and completion

Complete the required lessons and activities, then take the 20-question final assessment. The pass threshold is 80% plus every designated critical safety answer. Points and badges cannot compensate for a critical error.

Use the LMS to save and resume confirmed progress. Certificate availability follows its passed-completion and grade conditions. Browser practice and printed learning pages do not issue the official LMS record.

Independent construction learning. Completion records learning within the course scope; competent site assessment, practical training and task authorisation remain necessary. It does not confer a NEBOSH qualification.

Sources and learning provenance

The teaching draws on public SHAREhub topic pages and structured source records, with original fictional workface cases. Use the linked primary guidance and the applicable jurisdiction when planning a live task.

Topic records, source IDs and versions
Public topic sectionChunk and versionJurisdiction and source IDs
traffic-maangement · technical-modeltraffic-maangement--technical-model
Version 2.3
Great Britain, Northern Ireland
source-hsg136, source-hse_traffic, source-hseni_site
traffic-maangement · layout-modeltraffic-maangement--layout-model
Version 2.3
Great Britain, Northern Ireland
source-hsg136, source-hse_construction, source-hseni_site
mobile-plant-and-vehicles · audiencemobile-plant-and-vehicles--audience
Version 2.0
Great Britain, Northern Ireland
hse-transport, hseni-transport, hse-mobile
mobile-plant-and-vehicles · scenariomobile-plant-and-vehicles--scenario
Version 2.0
Great Britain, Northern Ireland
hse-construction, hse-transport, hseni-transport
traffic-maangement · public-road-routetraffic-maangement--public-road-route
Version 2.3
Great Britain, Northern Ireland
source-dft_redbook, source-dft_ch8, source-dfi_redbook, source-gb_cdm, source-ni_cdm
traffic-maangement · worked-exampletraffic-maangement--worked-example
Version 2.3
Great Britain, Northern Ireland
source-hse_construction, source-hsg144, source-gb_cdm, source-ni_cdm
traffic-maangement · hierarchy-in-practicetraffic-maangement--hierarchy-in-practice
Version 2.3
GB, NI
source-hse_control_hierarchy, source-hse_traffic, share-hierarchy-iosh
traffic-maangement · banksman-limitstraffic-maangement--banksman-limits
Version 2.3
Great Britain, Northern Ireland
source-hse_reversing, source-hseni_reversing
traffic-maangement · stop-triggerstraffic-maangement--stop-triggers
Version 2.3
Great Britain, Northern Ireland
source-hsg136, source-hse_reversing, source-hseni_reversing
mobile-plant-and-vehicles · az-learning-mobile-plant-and-vehicles-1mobile-plant-and-vehicles--az-learning-mobile-plant-and-vehicles-1
Version 20261018-stream01-detailed-1
Great Britain, Northern Ireland
hse-construction, hse-mobile, hse-transport, hseni-transport, ni-cdm, ni-puwer, ni-workplace
mobile-plant-and-vehicles · competencemobile-plant-and-vehicles--competence
Version 2.0
Great Britain, Northern Ireland
hse-transport, hseni-transport, hse-mobile, hse-dumpers, hse-construction, hse-hsg144, gb-cdm, ni-cdm, hse-l117
mobile-plant-and-vehicles · az-learning-mobile-plant-and-vehicles-3mobile-plant-and-vehicles--az-learning-mobile-plant-and-vehicles-3
Version 20261018-stream01-detailed-1
Great Britain, Northern Ireland
hse-construction, hse-transport, hseni-transport
mobile-plant-and-vehicles · stopmobile-plant-and-vehicles--stop
Version 2.0
Great Britain, Northern Ireland
hse-transport, hseni-transport, hse-mobile
mobile-plant-and-vehicles · hierarchiesmobile-plant-and-vehicles--hierarchies
Version 2.0
Great Britain, Northern Ireland
hse-ppe, hse-construction, hse-dumpers, hse-mobile, hseni-transport
mobile-plant-and-vehicles · az-learning-mobile-plant-and-vehicles-2mobile-plant-and-vehicles--az-learning-mobile-plant-and-vehicles-2
Version 20261018-stream01-detailed-1
Great Britain, Northern Ireland
hse-coupling, hse-dumpers, hse-hsg144, hse-loading, hse-mobile
traffic-maangement · vehicle-activity-comparisontraffic-maangement--vehicle-activity-comparison
Version 2.3
Great Britain, Northern Ireland
source-hsg136, source-hse_traffic, source-hse_construction
traffic-maangement · operational-routetraffic-maangement--operational-route
Version 2.3
Great Britain, Northern Ireland
source-hsg136, source-hse_traffic, source-hse_construction, source-hse_reversing, source-hseni_site, source-hseni_reversing
mobile-plant-and-vehicles · stationary-tasksmobile-plant-and-vehicles--stationary-tasks
Version 2.0
Great Britain, Northern Ireland
hse-dumpers, hse-hsg144, hse-coupling, hse-loading, hse-mobile, m-review-dumpers
mobile-plant-and-vehicles · legalmobile-plant-and-vehicles--legal
Version 2.0
Great Britain, Northern Ireland
gb-hswa, ni-hswo, gb-mhswr, ni-mhswr, gb-puwer, ni-puwer, gb-workplace, ni-workplace, gb-cdm, ni-cdm
traffic-maangement · failure-modestraffic-maangement--failure-modes
Version 2.3
Great Britain, Northern Ireland
source-hsg136, source-hse_traffic, source-hseni_site
traffic-maangement · decision-tooltraffic-maangement--decision-tool
Version 2.3
Great Britain, Northern Ireland
source-hsg136, source-hseni_site, source-hse_traffic, source-dft_redbook, source-dfi_redbook
mobile-plant-and-vehicles · road-journeysmobile-plant-and-vehicles--road-journeys
Version 2.0
Great Britain, Northern Ireland
hse-road, hseni-road, hse-transport
traffic-maangement · evidence-packtraffic-maangement--evidence-pack
Version 2.3
Great Britain, Northern Ireland
source-hsg136, source-hsg65, source-hseni_site
traffic-maangement · assurancetraffic-maangement--assurance
Version 2.3
Great Britain, Northern Ireland
source-hsg65, source-hsg136
mobile-plant-and-vehicles · standardmobile-plant-and-vehicles--standard
Version 2.0
Great Britain, Northern Ireland
hse-management-rights

Course version 2026.10.20.4 · SH-PLT-01. Factual source identity and jurisdiction are retained in the .

Questions about this course

Is this course free?

Yes. The training is £0. Full public teaching and readers can be used without an account. A free learner account is required for confirmed saved assessment, completion and certificate records in the LMS.

How long should I allow?

Approx. 2h–3h: approximately 120–180 minutes of self-paced learning, including required activities and one final-assessment attempt. Your pace, review and retries may increase the time. Save and resume in the LMS.

Can I study without a 3D-capable browser?

Yes. The complete learning reader is available in ordinary HTML. Where this course includes model practice, an accessible text route provides the same decision sequence. Use the interactive LMS course to complete its assessed requirements.

What do I need to pass?

Complete the required learning and achieve at least 80% in the final assessment, with every critical safety answer correct. Follow the feedback and review the relevant lesson before retrying.

Where is my completion record?

The LMS holds confirmed grades, completion and certificate records for your learner account. Public browser practice has its own separate progress and is not an official completion record.

Does completion authorise construction work?

Independent construction learning. Completion records learning within the course scope; competent site assessment, practical training and task authorisation remain necessary. It does not confer a NEBOSH qualification.

Open this course in the LMS →Compare all construction courses

Presentation and model workshop

Use the same course imagery, worked decisions and source case in a 28-slide teaching companion. Practise classification, compare explained choices and inspect the linked model case.

Open the interactive presentation workshop · Download PowerPoint

This optional companion does not replace the required course activities or final assessment.