Live assets
Fire door register
Existing fire door assets stay visible above the form so an inspector can scan a tag, select a door, or start a fresh inspection for a building, floor or area.
| Asset ID | QR / tag | Building | Floor / area | Door type | Rating | Last check | Status | Next due |
|---|---|---|---|---|---|---|---|---|
| FD-001 | QR-FD-001 | Head office | Ground floor reception | Corridor / office | FD30S | 18 Jul 2026 | Pass | 18 Oct 2026 |
| FD-007 | QR-FD-007 | Head office | Equipment store lobby | Store / compartment | FD60S | 22 Jul 2026 | Defect open | Repair verification |
| FD-011 | QR-FD-011 | Head office | Stairwell lower landing | Stair / lobby | FD30S | 18 Jul 2026 | Pass | 18 Oct 2026 |