Workplace practice sheets
Use the fictional evidence in your own notes. The exercises do not create or approve operational records.
Optional fictional workplace transfer
Map a fictional contractor job: host hazards, contractor-created hazards, decision owners and final acceptance evidence.
- Choose a fictional task related to this course; include no real personal or confidential records.
- Describe its harm pathway and distinguish observed facts from information still needed.
- Compare a stronger control with a weaker alternative using the course explanation.
- Name the responsible role, the key check and the condition that would trigger stopping or review.
- Explain what would demonstrate improvement; do not submit or approve a real workplace record.
Open the live SHAREhub resource ↗
Optional extension. Live SHAREhub tools may need a separate sign-in. The included exercise works offline and submits no workplace record.
Optional visual practice and worked application
Use these fictional exercises to compare evidence and rehearse decisions. They do not alter course completion or assessment requirements. You can work through the same choices on paper.
Put the task and interfaces into the appointment
Fictional continuing case. The client checks a contractor’s general approval certificate, but the proposed supervisor has been replaced and the contractor has not received local process information.
Select for the actual work
General prequalification is an input, not proof of capability for this task. Confirm relevant supervision, people, method, equipment and the local information needed to plan safely.
Shared information
The host provides relevant site hazards and constraints. The contractor shares hazards created by its work with the host and affected teams. Approval does not transfer every responsibility to one party.
Worked mobilisation check
Open questions: who is supervising now, what local process information was issued, who coordinates corridor use and which role can release installation versus operation? Resolve these before the affected scope starts.
Connect each mobilisation gap with the responsible information
Fictional worked application: Two fictional contractors are due at a small manufacturing site. One installs a service connection while the other moves materials through the same corridor. Each work pack looks acceptable alone, but their combined arrangement would obstruct an escape route and confuse installation release with operating release. Stage evidence: The client checks a contractor’s general approval certificate, but the proposed supervisor has been replaced and the contractor has not received local process information.
Connect each mobilisation gap with the responsible information. Use the evidence in this stage, rather than assuming what happened off screen.
- The nominated supervisor is replaced before arrival. Task capability and supervision. Review the competence and cover needed for this job.
- The contractor has no current local process-hazard briefing. Host/site constraints. The task needs relevant host information, not only trade knowledge.
- Two teams use “released” to mean different operating states. Shared interface and release authority. Clarify the common scope, hold points and decision authority.
Record the contractor-interface action and hand-back evidence
Draw separate client, contractor and receiving-shift lanes. Add the information each owes the others, the shared corridor conflict and the specific evidence needed at hand-back.
Draw separate client, contractor and receiving-shift lanes. Add the information each owes the others, the shared corridor conflict and the specific evidence needed at hand-back.
Use only a fictional or authorised non-confidential example. Keep planned actions separate from verified current protection.
A saved practice entry does not alter the graded course or authorise work.
Reconcile the two work packs
Fictional continuing case. The installation method allows a staging area in the corridor. The material-movement plan uses the same space during the occupied shift.
Combined risk
The documents must be checked together against actual site conditions. Separate acceptable methods can create a new exposure when escape, access, isolation or other safeguards depend on shared space.
A coordinated decision
The host operations role and both contractors must agree usable boundaries, timing, communication and change control. Moving the task near occupied work is a material interface change, not merely a drawing update.
Worked coordination record
Conflict: staging blocks a required route during occupied work. Action: revise the agreed arrangement before mobilisation. Owners: host coordinator and both work leads. Verification: joint task/route check and consistent briefing to affected people.
Choose what resolves the corridor conflict
Fictional worked application: Two fictional contractors are due at a small manufacturing site. One installs a service connection while the other moves materials through the same corridor. Each work pack looks acceptable alone, but their combined arrangement would obstruct an escape route and confuse installation release with operating release. Stage evidence: The installation method allows a staging area in the corridor. The material-movement plan uses the same space during the occupied shift.
Choose what resolves the corridor conflict. Select every defensible evidence or action; leave unsupported substitutes unselected.
- Jointly review the actual occupied conditions and the two task boundaries. Relevant evidence. This examines the interaction missing from the separate packs.
- Confirm a usable route arrangement and brief the affected teams consistently. Relevant evidence. The coordinated control must work in practice and be understood.
- Accept both packs unchanged because each contractor has already signed its own method. Insufficient evidence. Separate signatures do not resolve their combined exposure.
- Leave the host uninformed because the corridor conflict is created by contractors. Insufficient evidence. Shared site constraints and affected operations require coordination.
Record the contractor-interface action and hand-back evidence
Draw separate client, contractor and receiving-shift lanes. Add the information each owes the others, the shared corridor conflict and the specific evidence needed at hand-back.
Draw separate client, contractor and receiving-shift lanes. Add the information each owes the others, the shared corridor conflict and the specific evidence needed at hand-back.
Use only a fictional or authorised non-confidential example. Keep planned actions separate from verified current protection.
A saved practice entry does not alter the graded course or authorise work.
Accept hand-back without hiding an unresolved configuration
Fictional continuing case. Required installation tests are accepted, but the record does not explain a remaining temporary connection. The outgoing lead says demobilisation is complete.
Useful but incomplete evidence
Accepted tests remain useful within their scope. They do not settle an unresolved configuration or demonstrate that every operating-release condition is met.
State-based hand-back
Describe completed work, verified tests, actual plant state, temporary connections and restrictions. Identify the receiving role and distinguish installation acceptance from permission to operate.
Follow through
The receiving shift needs a consistent account of the limits. A translated briefing can be effective when people demonstrate understanding; it does not approve later unreviewed changes.
Decide what the receiving team can accept
Fictional worked application: Two fictional contractors are due at a small manufacturing site. One installs a service connection while the other moves materials through the same corridor. Each work pack looks acceptable alone, but their combined arrangement would obstruct an escape route and confuse installation release with operating release. Stage evidence: Required installation tests are accepted, but the record does not explain a remaining temporary connection. The outgoing lead says demobilisation is complete.
Is the remaining temporary connection identified and covered by the responsible release decision?
- Is the remaining temporary connection identified and covered by the responsible release decision?
- No / not established in this case: Accepted installation tests do not explain the remaining connection. Next: Current decision — Keep the configuration question open and obtain clarification before affected operation.
- Yes, supported by the stated evidence: Proceed to the separate verification question; the first condition alone is not the final decision. Next: Does the receiving role have the verified state, restrictions and operating authority?
- Current decision
Keep the configuration question open and obtain clarification before affected operation.
- Does the receiving role have the verified state, restrictions and operating authority?
- The relevant evidence is still missing: Complete the receiving-role briefing and required acceptance before release. Next: Verification still required — Complete the receiving-role briefing and required acceptance before release.
- Yes, the responsible check is evidenced within its scope: Record hand-back within its scope and communicate remaining limits. Next: Scoped decision supported — Record hand-back within its scope and communicate remaining limits.
- Verification still required
Complete the receiving-role briefing and required acceptance before release.
- Scoped decision supported
Record hand-back within its scope and communicate remaining limits.
Record the contractor-interface action and hand-back evidence
Draw separate client, contractor and receiving-shift lanes. Add the information each owes the others, the shared corridor conflict and the specific evidence needed at hand-back.
Draw separate client, contractor and receiving-shift lanes. Add the information each owes the others, the shared corridor conflict and the specific evidence needed at hand-back.
Use only a fictional or authorised non-confidential example. Keep planned actions separate from verified current protection.
A saved practice entry does not alter the graded course or authorise work.
Optional choices save on this browser, separately from recorded course progress. Live tools retain their own access and competent-review requirements.