SHAREhub home

Fire risk assessment, hot-work and fire-watch procedure

BOUK-PRO-FIRE · v1.0 · Completed fictional example · DOCX

Assess ignition/fuel/occupants, coordinate occupied premises, authorise hot work and inspect fire precautions.

Download editable DOCXView this policy branch

Read-only preview. Use the downloaded native file for your own working copy. Examples are fictional; signatures, work releases and operational evidence remain separate.

BOUK-PRO-FIRE | Version 1.0 | 23 October 2026 | GB baseline

COMPLETED FICTIONAL EXAMPLE. BuildOut UK Ltd is an illustrative construction business. The arrangements and cases below are examples for adaptation; no actual work, approval or signature is represented.

Assess ignition/fuel/occupants, coordinate occupied premises, authorise hot work and inspect fire precautions.

Scope and operating responsibility

We apply this procedure to Phased refurbishment with a live escape route. Evidence includes Construction fire assessment; occupier interface; hot-work authorisation; fire-watch checks; system impairment and restoration; evacuation exercises. The role controlling the task checks applicability before mobilisation and whenever the scope changes.

RoleRequired action
Site managerOwn this arrangement, confirm competent support and maintain its evidence trail.
Project manager and Site managerCoordinate the actual package, provide resources and verify prerequisites before release; resolve occupied and subcontractor interfaces.
Trade supervisor and workersUse the accepted current method, demonstrate understanding, report changes and stop when critical safeguards are uncertain.
Competent specialist and H&S adviserProvide technical advice within competence; challenge evidence and identify limitations. Management retains the operating decision.

Inputs before using the procedure

Use the current project risk register, relevant survey and design revisions, equipment or product information, worker consultation and the task-specific records listed below. Resolve conflicting or missing information before relying on it. Do not fill missing technical values from an example.

How we carry out the arrangement

1 Plan and obtain reliable information

The Site Manager coordinates construction fire risks with the occupier’s responsible arrangements throughout phased refurbishment. The applicable fire law and dutyholders are identified for the project nation and premises.

2 Verify capability and prerequisites

Escape routes, compartmentation, alarm availability, access for responders and evacuation of occupants remain effective during temporary works, isolations and changes of phase.

3 Control work and interfaces

Avoid hot work where a safer cold method is practicable. Otherwise assess combustible materials, voids, adjacent occupancies, fire protection and the required permit, watch and post-work checks for the actual conditions.

4 Review change and safe handback

Fire-system impairment is controlled and communicated to the relevant occupier and project authority; temporary measures and restoration are verified before affected work or occupancy continues.

Stop restrict and restart

Do not carry out hot work or continue an affected phase with unresolved ignition, escape, alarm, compartmentation or fire-response controls.

The person controlling the work makes the affected area safe and notifies the Site Manager. Restart requires the competent technical decision for the actual control, the authorised work-release decision and a fresh briefing of affected people. Record unresolved limits; an updated date or a completed form does not remove a hold.

Practical control detail

Before welding, grinding or thermal cutting, compare a cold method. If hot work remains necessary, the issuer checks combustible materials on both sides of the work and in voids, occupied boundaries, alarm impairments, suitable fire response and the required watch and post-work checks. Work on process plant also needs operator coordination, competent isolation and any required atmosphere or DSEAR controls.

The quickest way to make fire risk assessment useful is to select the right route for the premises, people, work activity and fire mechanism.

Evidence follow up and learning

Worked decision trail

Fictional situationDecision and evidence
What changesA temporary partition blocks an occupied-building escape route.
ResponseThe Site Manager holds the affected phase, restores or competently revises escape and coordinates with the occupier.
VerificationWalk the revised route and verify alarm, assistance and responder access before reopening the phase.

Supporting arrangement documents

ReferenceHow the document is used
BOUK-RA-FIRE-01
Site and occupied-interface fire risk assessment
Assess ignition/fuel, people at risk, escape, alarms, response and coordinated arrangements.
BOUK-PTW-FIRE-01
Hot-work permit and fire-watch record
Control ignition, combustible removal, fire watch, checks and final handback.
BOUK-CHK-FIRE-01
Fire precautions, escape routes and alarm checks
Inspect escape/access, fire doors, alarms, extinguishers and housekeeping.
BOUK-PLN-FIRE-01
Construction fire and evacuation plan
Coordinate alarm, assembly, assistance, communication and emergency-service access.
BOUK-RA-FIRE-02
Flammable substances and explosive-atmosphere assessment
Assess dangerous substances, ventilation, ignition controls and hazardous-area needs.
BOUK-CHK-FIRE-02
Occupied residential building fire-duty interface checklist
Identify responsible persons, building scope and information/evacuation interfaces before refurbishment.
BOUK-RAMS-FIRE-01
Welding, brazing and thermal cutting RAMS
Fume capture, optical radiation, fire control, gas cylinders and permit interfaces.

Retain the record ID, task, location, competent author, revision, date, decision, restrictions, action owner and separate effectiveness evidence. Restrict personal and health information and apply the relevant retention rule. File genuine results separately from teaching examples.

Guidance Fire Safety at Work · Hot Work Control in Process Areas

Content basis

Built from the BuildOut policy and arrangement register, the SHARE policy/risk/routine-checklist/audit databases and the linked SHAREknowledge topics.

Register legal summaries retain their own review dates. No actual inspection, clinical record, specialist certificate or company approval is represented.