Skip to main content

HSG253 isolation risk assessment

What you can take away

A company-branded PDF or editable Word isolation planning record with the selection detail and any drawings you add.

  • The entered substance, pressure, line-size and location factors and calculated baseline category.
  • The proposed arrangement, isolation points, proving checks and control of the work.
  • Reinstatement requirements, review notes and actions to support your isolation documentation.
View completed example (PDF)

How it helps you at work

Make the baseline selection traceable, compare it with the proposed arrangement and keep technical review questions and verification requirements together.

Keep it with your own records

Save a working copy in this browser for the signed-in account. Download the PDF or editable Word record and file it in your own system; the worksheet does not automatically update organisation records.

How it works — the theory and its limits

The selector follows HSG253 Appendix 6’s baseline selection method. It uses the stated process factors to identify a starting category for selecting an isolation arrangement.

Competent technical assessment must then consider the real plant, substance, work and site standard. Installing, proving, monitoring and reinstating the isolation are separate parts of the planned work.

This is not a numerical risk score or work authorisation. The selector excludes pipelines, extended-term isolations, confined-space entry and catastrophic or very difficult recovery situations.

Method and guidance

Open the tool
  1. 1Define the work and sources
  2. 2Calculate the baseline and plan isolation
  3. 3Verify, control and reinstate
Before you use this tool

The selector implements the Appendix 6 baseline method; the final isolation scheme still needs competent technical assessment against the site standard. Pipelines, extended-term isolations, confined-space entry and catastrophic / very difficult recovery situations are outside its scope. No result authorises work or proves isolation. Use the actual P&ID, verified boundary, isolation certificate and permit process; assess other energy sources separately.

Take the next step

Sources, scope and guidance

Use the current guidance for the work and jurisdiction. Source review: 24 October 2026.