SHARE Knowledge Hub
Legionella Management
Legionella management prevents growth in water systems and exposure to contaminated aerosol. The dutyholder needs a system-specific risk assessment, a responsible person, a written control scheme, monitoring with action limits and a response when a control fails. For hot and cold domestic water, temperature is a common strategy; cooling towers and other systems need their own HSG274 part and competent design.
Understanding Legionella Management
Legionella management prevents growth in water systems and exposure to contaminated aerosol. The dutyholder needs a system-specific risk assessment, a responsible person, a written control scheme, monitoring with action limits and a response when a control fails. For hot and cold domestic water, temperature is a common strategy; cooling towers and other systems need their own HSG274 part and competent design.
Why this matters at work
Legionella bacteria occur naturally in low numbers in water and can colonise man-made systems. Legionnaires' disease is a potentially fatal pneumonia caused by inhaling aerosol containing viable bacteria. Pontiac fever is a self-limiting flu-like illness associated with Legionella exposure but without pneumonia. Both indicate that an environmental pathway may need investigation.
Hazards and harm: disinfectant concentrate, incompatible chemicals, contaminated spray, pressure and hot water can cause inhalation injury, burns, infection or loss of containment. Cleaning can introduce a new exposure while addressing an existing microbial hazard.
How organisations manage this in practice
Myth: lowering the boiler prevents scalding safely. Correct answer: maintain microbial control in storage and circulation and manage scald risk near use with competent design. Myth: the contractor owns the risk. Correct answer: providers perform tasks; the dutyholder remains accountable for scope, supervision and action.
Design for access, drainage, cleanability, controlled discharge and reliable treatment. Keep pond and pack clean, prevent sunlight and debris where practicable, and maintain drift eliminators correctly fitted and undamaged. Changes in heat load, water source, chemistry or operating cycle can destabilise control.
Review the risk assessment and scheme when there is reason to believe they are no longer valid, including system or use change, repeated control failure, positive samples, illness, new vulnerable occupancy, responsible-person change or new guidance. Set a routine review interval but do not let the calendar delay a change-driven review.
Where foreseeable risk cannot be eliminated, implement a written control scheme tailored to the system. It should describe plant and operation, identify responsible people, show the current schematic, state control measures, checks and frequencies, and define remedial action. It must be an operating document, not a policy copied from another site.
Audit work as done: visit plant and outlets, trace records to assets, observe flushing and sampling, challenge overdue actions and test staff understanding. Compare risk assessment, schematic, scheme, contractor scope and data. Differences between them are control failures, not administrative tidiness issues.
How can I practise this topic in 3D?

Low-use room has unmanaged water stagnation

Bath outlet temperature too high
All related inspection points 9 across 2 locations
Riverside Leisure 4 inspection points
A safer place to call home 5 inspection points
Practice in the SHAREhub environment. Browser practice is separate from workplace competence and formal learning records.
What health boundary should readers understand?
This page is workplace and premises guidance, not medical advice. Suspected Legionnaires' disease, illness after aerosol exposure or an outbreak concern should be escalated through medical and public-health routes while the dutyholder secures records and reviews controls.
Managers should not attempt to diagnose illness. Their role is to prevent exposure, cooperate with competent water-treatment specialists, provide accurate water-system records, act on microbiological results, support any investigation and protect worker or occupant health information.
Legionella risk is environmental rather than person-to-person in normal workplace management. The prevention focus is therefore water-system design, temperature, stagnation, biofilm, aerosol generation, monitoring and maintenance.
| Issue | Dutyholder role | Medical/public-health role |
|---|---|---|
| Symptoms | Record reported work context and escalate appropriately. | Assess and treat the individual. |
| Positive water result | Review control scheme, restrict use if needed and clean/disinfect. | Advise on health/public-health response if illness is involved. |
| Outbreak concern | Preserve records and cooperate with authorities. | Lead clinical/public-health investigation. |
| Worker privacy | Keep health information limited and secure. | Handle clinical details confidentially. |
After possible water-aerosol exposure, contact a GP or local urgent-care service promptly for relevant illness and tell the clinician where and when the exposure occurred, including recent stays and water systems. NHS guidance identifies chest pain or breathlessness as reasons for urgent help; use 999 for a life-threatening emergency. Do not wait for water-sampling results or an internal investigation before seeking care. Use England’s NHS 111, NHS 24 in Scotland, NHS 111 Wales or the local GP/out-of-hours/Phone First route in NI as appropriate. Sources: NHS Legionnaires’ disease.
What are the key facts about legionella?
Legionella control is mainly an engineering, maintenance and management discipline.
Water systems are the source
Risk arises where water conditions allow bacteria to grow and aerosols can be inhaled.
Temperature matters
The risk range is commonly associated with warm water, especially around 20-45°C.
Aerosols matter
Showers, cooling towers, spray systems, hot tubs and pressure washers can create inhalable droplets.
Stagnation feeds risk
Dead legs, little-used outlets, poor turnover and biofilm increase concern.
Records are essential
Risk assessments, written schemes, monitoring and actions show control.
Competence matters
Responsible people need authority, knowledge, resources and contractor oversight.
What is legionella management in plain English?
Legionella management means keeping water systems in a condition that does not allow dangerous bacterial growth and aerosol exposure.
Legionella bacteria can exist naturally at low levels, but building water systems can create better growth conditions: warm temperatures, stored water, poor circulation, scale, sludge, biofilm and nutrients. If that water is sprayed or aerosolised, people can inhale droplets deep into the lungs.
Good management is not just taking occasional samples. It is a cycle: know the system, assess the risk, appoint competent responsibility, write the control scheme, monitor the controls, fix defects, keep records and review after change. Sampling can support assurance, but it cannot rescue a poorly understood or poorly maintained system.
| Question | Plain answer | Why it matters |
|---|---|---|
| What is the hazard? | Legionella bacteria in water systems. | Can cause serious pneumonia-type illness. |
| How are people exposed? | By inhaling contaminated aerosols. | Controls focus on water and droplet creation. |
| What grows it? | Warm temperature, stagnation, nutrients, scale and biofilm. | Maintenance and design matter. |
| What controls it? | Temperature, biocide/treatment, flow, cleaning and monitoring. | Control strategy must match the system. |
| What proves it? | Risk assessment, schematic, written scheme, monitoring and action records. | Evidence protects people and dutyholders. |
How does legionella grow and cause risk?
Learners need the biological logic because it explains why the control scheme looks the way it does.
The common teaching model is simple: water system conditions allow growth, aerosol generation allows inhalation, susceptible people may develop illness. The strongest controls break that chain by keeping cold water cold, hot water hot, preventing stagnation, cleaning deposits, treating water and controlling aerosol-producing equipment.
Temperature alone is not enough. A calorifier may be hot, but a long dead leg, poorly used shower, thermostatic mixing valve or neglected storage tank can still create local risk. This is why monitoring must be connected to system knowledge.
| Stage | What happens | Control focus |
|---|---|---|
| Source | Bacteria present in water or introduced into a system. | System design and water quality. |
| Growth | Warm stagnant water, biofilm, sludge or scale supports multiplication. | Temperature, turnover, cleaning and treatment. |
| Aerosol | Water droplets are created by showers, sprays or cooling systems. | Control aerosol-generating equipment. |
| Exposure | People inhale droplets. | Restrict use, maintain systems and protect high-risk areas. |
| Illness | Susceptible people may develop legionellosis. | Medical/public-health response and prevention review. |
Which water systems need attention?
Any system that stores or circulates water and can create aerosols should be considered.
HSG274 separates technical guidance across evaporative cooling, hot and cold water systems and other risk systems. In practical terms, dutyholders should map their systems: tanks, calorifiers, showers, outlets, cooling towers, spa pools, fountains, vehicle washes, misting systems, emergency showers and specialist process equipment.
Small premises are not exempt from thinking. A simple system may need simple controls, but little-used outlets, poor records or unclear responsibility can still create unmanaged risk.
| System | Why it matters | Control focus |
|---|---|---|
| Cooling towers and evaporative condensers | High aerosol potential and complex water treatment needs. | Written scheme, treatment, monitoring and competent maintenance. |
| Hot and cold water systems | Common in most buildings. | Temperature, flushing, outlets, tanks and TMVs. |
| Showers and spray taps | Aerosol generation close to users. | Cleaning, flushing and temperature control. |
| Spa pools and hot tubs | Warm agitated water creates high aerosol risk. | Strict treatment, cleaning and monitoring. |
| Vehicle washes and pressure washers | Aerosols from stored or recirculated water. | Water quality, cleaning and use controls. |
| Emergency showers and eyewash | May be rarely used but critical when needed. | Flushing and inclusion in scheme. |
| Metalworking fluid systems | Water-mix fluids can create aerosols in special circumstances. | Fluid quality, bacterial control and avoiding jet washing biofilm. |
Who should own legionella management?
The dutyholder must make sure responsibility is competent, named and resourced.
A responsible person should have sufficient authority, competence and support to implement the control scheme. In larger organisations, there may be an appointed responsible person, deputies, facilities managers, maintenance contractors, water-treatment specialists and site users who all have defined roles.
Outsourcing does not remove dutyholder responsibility. Contractors can provide specialist advice, monitoring and maintenance, but the organisation still needs to understand what is being done, review reports and close defects.
| Role | Typical responsibility | Evidence |
|---|---|---|
| Dutyholder | Ensure risk is assessed and managed. | Appointment and governance records. |
| Responsible person | Manage day-to-day control scheme and records. | Named appointment and competence record. |
| Deputy | Cover absence and support continuity. | Deputy appointment and briefing. |
| Facilities/maintenance | Carry out checks, flushing, repairs and contractor coordination. | Logs and work orders. |
| Water-treatment specialist | Advise, sample, treat, clean or inspect as contracted. | Reports, certificates and recommendations. |
| Building users | Report temperature problems, unused outlets or defects. | Communication and reporting route. |
What should a legionella risk assessment cover?
The assessment should describe the water system and determine whether conditions could support growth and aerosol exposure.
A useful legionella risk assessment is not a generic folder with a logo on it. It should be specific to the building or system: schematic, asset list, outlet use, temperature profile, dead legs, storage, materials, users, susceptible people, aerosol points, maintenance access, control strategy and records.
The assessment should be reviewed when the system changes, use changes, monitoring fails, an illness is suspected, occupancy changes, controls are not maintained or new guidance/evidence suggests the risk has changed.
HSE L8 requires a system-specific risk assessment and a responsible person.
| Assessment area | What to check | Evidence |
|---|---|---|
| System description | Tanks, calorifiers, outlets, TMVs, loops and aerosol points. | Schematic and asset register. |
| Temperature profile | Cold, hot, return and outlet temperatures. | Temperature logs and trend review. |
| Stagnation | Dead legs, little-used outlets and low turnover. | Flushing schedule and removal plan. |
| Susceptible people | Healthcare, older users, immune-compromised people or public exposure. | Occupancy profile. |
| Control strategy | Temperature, chemical treatment, cleaning or other controls. | Written scheme. |
| Monitoring | What is checked, when, by whom and against what action levels. | Monitoring programme. |
| Review triggers | Change, poor results, defects, illness or occupancy change. | Review log. |
How can the hierarchy of controls control Legionella growth and harmful aerosol exposure?
The written scheme explains how the risk assessment will be controlled in daily practice.
A written control scheme should be practical enough for the people using it. It should identify the system, responsible roles, control measures, monitoring, frequencies, action levels, cleaning, disinfection, sampling if needed, record keeping and escalation.
The scheme should also explain what to do when controls fail. For example, if hot water does not reach the required temperature, the issue should not sit as a note in a contractor report for three months. It needs risk assessment, interim controls, repair ownership and verification.
Use ERICPD with the five-level hierarchy to choose physical water-system controls. L8 requires a scheme of control where risk exists, while HSG274 gives system-specific technical advice. Every selected measure needs an owner, check, failure action and record; flushing alone does not compensate for a badly designed stagnant system.
| Scheme element | What it should say | Why it matters |
|---|---|---|
| Roles | Who does what and who reviews. | Prevents orphaned tasks. |
| Control parameters | Temperature, treatment or other performance criteria. | Defines what good looks like. |
| Monitoring frequency | Daily, weekly, monthly, quarterly or annual tasks as appropriate. | Keeps checks consistent. |
| Action levels | What triggers repair, cleaning, restriction or escalation. | Prevents passive logging. |
| Schematic | System layout and high-risk points. | Helps find stagnation and dead legs. |
| Contractor duties | Scope, reporting, escalation and competence. | Controls outsourced work. |
| Record retention | Which records are kept and for how long. | Supports audit and investigation. |
What does a practical water-system control scheme look like?
A worked scheme helps dutyholders understand how L8/HSG274-style arrangements become everyday facilities management.
Take a medium-sized leisure and office building with changing-room showers, staff kitchens, hot and cold water storage, thermostatic mixing valves, a plant room, a small number of little-used outlets and an external water-treatment contractor. A useful control scheme would not simply say 'contractor checks legionella'. It would define the system, responsible person, monitoring tasks, action limits, contractor role, records and review triggers.
The best schemes make exceptions visible. A missed flush, a cold outlet repeatedly above target, a hot outlet slow to reach temperature, a removed shower hose, a dead leg found during refurbishment or a contractor recommendation should all move into an action tracker with an owner and verification date.
| Control-scheme element | Example arrangement | Review evidence |
|---|---|---|
| System schematic | Current drawing shows incoming main, storage, calorifiers, hot return, TMVs, showers, kitchens, little-used outlets and dead legs. | Schematic version control and change notes. |
| Responsible roles | Dutyholder appoints responsible person, deputy, facilities technician and contractor contact with escalation routes. | Appointment letters, competence records and contact list. |
| Hot water control | Calorifier, return and sentinel outlets checked to confirm hot water control remains effective. | Temperature log, exceptions and repair records. |
| Cold water control | Tanks, sentinel outlets and storage are monitored to confirm cold water is not warming into the risk range. | Cold-water temperature log and trend review. |
| Little-used outlets | Mapped outlets are flushed safely on a defined frequency or removed if no longer needed. | Flushing register, missed-flush report and removal plan. |
| Showers and spray points | Shower heads and hoses are cleaned/descaled; defective hoses are replaced and rechecked. | Cleaning schedule and defect close-out. |
| Contractor role | Contractor samples, inspects, treats or advises within a written scope and reports urgent failures promptly. | Contract report, recommendation tracker and dutyholder review. |
| Actions and review | Out-of-range results, positive samples, refurbishment, closure/reopening or illness concerns trigger risk review. | Action tracker, revised assessment and management review notes. |
How does temperature control work?
For hot and cold water systems using temperature as the main control, keep cold water below 20°C where possible, hot water stored at least 60°C and outlets at 50°C within one minute (55°C in healthcare).
HSE hot-and-cold system guidance gives these control benchmarks and says system size and type matter. The outlet reading must be taken at the relevant measurement point, including upstream of a thermostatic mixing valve where fitted. A scalding risk requires a suitable separate control. These numbers are not a universal design for a cooling tower, spa pool or chemical-control regime.
The responsible person writes location-specific limits, frequency, method, action and escalation into the scheme. A warm cold-water outlet, slow hot-water rise, dead leg or failed mixing-valve check needs investigation and an interim exposure decision; record repair and a confirming test. HSG274 Part 2 supplies technical detail for hot and cold systems. The HSG274 second-edition update in March 2024 applies to Part 1 only.
| Check | Hot/cold-system benchmark | Decision if outside scheme | Source |
|---|---|---|---|
| Cold storage/distribution | Below 20°C where possible. | Find heat gain or stagnation, apply interim measures and retest. | HSE hot and cold systems |
| Hot storage | At least 60°C. | Check heater, stratification and circulation; assess exposure before continued use. | HSE hot and cold systems |
| Hot outlet | At least 50°C in one minute; 55°C in healthcare. | Check location, mixing valve, circulation and scald control; repair and retest. | HSE hot and cold systems |
How should a closed building's water system be returned to use?
Return to use should be a planned water-system decision, not a date on a booking calendar. A period of low use changes the risk assessment because water movement, temperature and the population using the building may have changed. The competent responsible person must establish the system's condition and the controls needed before users are exposed to aerosols. Related guidance: L8 ACOP and guidance.
In an illustrative leisure building, a changing-room wing has been closed while adjacent rooms remained occupied. The current drawing shows the main hot-water circuit but not a shower removed during refurbishment. The responsible person holds reopening of the affected wing and commissions a survey to reconcile actual pipework, outlets, mixing valves and monitoring points. The issue is a gap in system knowledge; a contractor's completion certificate alone cannot fill it. Related guidance: L8 ACOP and guidance.
The competent team then defines the recommissioning method for this hot-and-cold system, including cleaning, flushing, treatment and sampling where the assessment requires them. Plan access, safe work with chemicals and hot water, aerosol exposure and protection of people in the occupied wing. Do not improvise a thermal-disinfection recipe from a normal outlet-temperature benchmark or apply a hot-and-cold procedure to a spa or cooling system. Related guidance: L8 ACOP and guidance.
Before release, the responsible person checks the revised schematic, the work records, identified exceptions and the evidence that the specified control regime has been restored at the relevant locations. Contractor scope must make clear who interprets results and who decides restrictions. A missing result or unresolved stagnant branch remains an explicit open issue; a booking commitment is not a substitute for the water-system decision. Related guidance: L8 ACOP and guidance.
Hand-back names the outlets released, continuing restrictions, monitoring arrangements, responsible person and deputy, and conditions triggering reassessment. Facilities staff demonstrate the checks they now own and the escalation route when an outlet fails. If user susceptibility or occupancy changes again, review the assessment and scheme rather than assuming the previous commissioning decision covers the new use. Related guidance: L8 ACOP and guidance.
Guidance for these decisions: L8 ACOP and guidance; HSG274 technical guidance; L8 approved for use in NI. Apply the legal route for the work location; illustrative scenarios are SHARE teaching examples.
Why do a small office and a cooling tower need different decisions?
Assessment should be proportionate to the actual system. For a simple, regularly used premises system, a competent assessment may establish no reasonably foreseeable risk, or low risk that is already properly managed. HSE says no further action may then be needed at that stage; existing controls still need maintenance and the assessment needs review. This is an assessment outcome, not an exemption based on the size of the business. Related guidance: L8 ACOP and guidance. HSE: Identify and assess sources of risk.
For an illustrative evaporative cooling system, a routine report records a free-halogen result without stating how cooling-water pH was considered. The responsible person asks the competent water-treatment specialist to establish the test method, system conditions and interpretation against HSG274 Part 1. The March 2024 update of Part 1 specifically stresses pH correction of free-halogen results. This page supplies no dose, target concentration or correction calculation. Related guidance: HSG274 technical guidance.
A domestic hot-water outlet temperature cannot answer that cooling-system question. The specialist checks the treatment and monitoring scheme, relevant operating results and any failure response; the responsible person records what activity is restricted and the evidence required for recovery. A normal result copied from another plant cannot close the uncertainty. Cooling-system discharge, drift and exposure interfaces also need their own assessment. Related guidance: HSG274 technical guidance.
For both cases, explain why the selected route fits the actual plant and people. Keep the low-risk assessment under review, and keep complex cooling-system decisions within competent specialist scope. HSG274 is labelled UK technical guidance, while the legal instruments and approved-code route remain those applicable to Great Britain or Northern Ireland. Related guidance: HSG274 technical guidance; L8 approved for use in NI.
Guidance for these decisions: L8 ACOP and guidance; HSG274 technical guidance. Apply the legal route for the work location; illustrative scenarios are SHARE teaching examples.
What monitoring and sampling may be needed?
Monitoring confirms whether the control scheme is being implemented and remains effective.
Routine monitoring commonly includes temperatures, visual checks, treatment levels where used, flushing records, cleaning tasks and action close-out. Microbiological sampling may be needed depending on system type, risk, control method, history and competent advice.
A sample result without action discipline is weak. The report should be reviewed, results interpreted, any restrictions considered, the system cleaned or disinfected where needed, causes investigated and the written scheme updated if the result shows a control weakness.
| Activity | What it checks | Evidence standard |
|---|---|---|
| Temperature monitoring | Hot/cold control remains effective. | Recorded location, result, time and action. |
| Flushing | Little-used outlets do not stagnate. | Schedule, completion and exceptions. |
| Treatment checks | Biocide or treatment remains within target. | Result, correction and trend. |
| Inspection | Tanks, scale, corrosion, biofilm or poor condition. | Inspection report and photos. |
| Sampling | Microbiological status where risk indicates. | Competent sampling plan and interpretation. |
| Action tracking | Defects are fixed and verified. | Owner, date, completion and recheck. |
How should cleaning, flushing and disinfection be managed?
Cleaning and flushing are controls only when they are planned, competent and recorded.
Flushing little-used outlets helps prevent stagnation, but it has to be done safely because flushing itself can create aerosols. Cleaning and disinfection should be undertaken by competent people using suitable methods, chemicals and precautions.
Design improvement is often better than permanent flushing. If an outlet is never used, removal may be stronger than relying on a weekly tick sheet forever. The control scheme should challenge why stagnant sections exist.
| Control | Good practice | Common failure |
|---|---|---|
| Little-used outlet flushing | Defined frequency, safe method and record. | Ticked off without actually flushing. |
| Shower cleaning | Clean and descale heads and hoses. | Blocked or scaled outlets left in use. |
| Tank inspection | Check cleanliness, covers, insulation and debris. | Tank not accessible or never inspected. |
| Dead leg removal | Remove or redesign redundant pipework. | Permanent flushing used as a weak workaround. |
| Disinfection | Competent chemical/thermal disinfection where required. | Treatment done but cause not fixed. |
| Post-work verification | Confirm control restored after cleaning or modification. | No recheck or record. |
How should legionella contractors be managed?
Specialist support helps, but dutyholders must remain informed and in control.
Contractors should be selected for competence, scope and ability to explain findings clearly. The contract should define monitoring, sampling, reporting timescales, escalation, defect management, emergency response and record handover. Reports should not sit unread in a portal.
The responsible person should challenge repeated failures, unclear recommendations and closed actions without verification. If a contractor identifies a recurring temperature issue, the dutyholder should ask whether design, use, balancing, maintenance or occupancy has changed.
| Check | What good looks like | Warning sign |
|---|---|---|
| Competence | Relevant experience, training and clear technical support. | Only price used for selection. |
| Scope | Written scope covers system, frequencies and reporting. | Assumptions about who does flushing or actions. |
| Reports | Findings are clear, prioritised and explained. | Long reports with no action summary. |
| Escalation | Failures trigger prompt dutyholder action. | Defects remain open without risk review. |
| Verification | Repairs or cleaning are rechecked. | Invoices accepted as proof of control. |
| Change control | System changes are communicated. | Contractor unaware of refurbishment or closure. |
What records should be kept for legionella management?
Records are a core part of L8-style control because they show the system is understood and managed.
Records should prove that controls were selected, implemented, checked and improved. The table helps distinguish useful evidence from records that exist only because someone expected a document.
| Record | What it should show | Review point |
|---|---|---|
| Risk assessment | System risk, people at risk and control strategy. | Review after change or poor results. |
| Responsible person appointment | Named competent person and deputies. | Review after role changes. |
| Schematic | Current water-system layout. | Update after modifications. |
| Written control scheme | Controls, frequencies, action levels and escalation. | Use a risk-based review programme and earlier change/failure triggers; an annual review is an example planned interval, not a universal statutory expiry. |
| Temperature/treatment logs | Monitoring completed and acted on. | Trend and exceptions. |
| Flushing records | Little-used outlets managed. | Missed flushes and outlet use. |
| Cleaning/disinfection records | Work completed by competent people. | Post-work verification. |
| Action tracker | Defects closed and verified. | Overdue high-risk actions. |
HSE’s general legionella record guidance distinguishes the five-employee recording threshold from recommended records. Smaller employers still assess and control risks; retaining a proportionate scheme and monitoring evidence is good practice and specific sector or control obligations may also apply. Sources: HSE legionella record keeping.
How do you distinguish a bad reading from a failing control?
An unexpected reading starts an investigation and an exposure decision. First establish which asset and measurement point it describes, how the reading was obtained and whether it can be compared with the scheme's intended parameter. A repeat measurement can clarify evidence, but it should not erase the original failure or delay necessary protective action. Related guidance: Hot and cold water systems.
At a shower with a thermostatic mixing valve, the blended temperature and the upstream hot-water temperature answer different questions. A scald-protection setting cannot be read as direct proof that the upstream circulation is inadequate or adequate. Keep both controls in view and obtain competent advice on measurement, valve function and the affected users before changing settings. Related guidance: Hot and cold water systems.
Suppose the remote log is normal while manual checks from a distant branch are repeatedly outside the scheme. Check whether the sensor observes that branch, whether its location and calibration are suitable, and whether outlet use or pipework has changed. A negative sample from a different point or date cannot close a temperature-control failure by itself. Review the relevant control regime and sampling purpose together. Related guidance: Hot and cold water systems.
An observed competence check asks the facilities technician to identify the correct asset, use the agreed measurement method, record the actual result and escalate an exception. The responsible person must demonstrate a proportionate restriction and recovery decision; the contractor must explain limitations of the test. The dutyholder checks that competent cover, access and budget exist to act on failures. Related guidance: Hot and cold water systems.
| Exception | What to establish | Closure evidence |
|---|---|---|
| Repeated slow hot-water response | Correct test point, method, circulation and changes in use; separate scald control. | Competent diagnosis, completed repair and confirming checks at affected points. Related guidance: Hot and cold water systems; Keeping legionella records; HSG274 technical guidance. |
| Missing outlet from the schematic | Survey actual pipework and establish whether a redundant branch remains. | Updated drawing and assessed removal or control of the actual branch. Related guidance: Hot and cold water systems; Keeping legionella records; HSG274 technical guidance. |
| Normal remote log, abnormal local check | Sensor position, coverage, calibration and comparability of readings. | Validated monitoring coverage and resolved local control weakness. Related guidance: Hot and cold water systems; Keeping legionella records; HSG274 technical guidance. |
| Missed low-use outlet task | Actual use, missed period and possible exposure; do not backdate a tick. | Risk decision, completed appropriate work and a resourced future schedule. Related guidance: Hot and cold water systems; Keeping legionella records; HSG274 technical guidance. |
Guidance for these decisions: Hot and cold water systems; Keeping legionella records; HSG274 technical guidance. Apply the legal route for the work location; illustrative scenarios are SHARE teaching examples.
What should happen if controls fail or illness is suspected?
The response should protect people, preserve evidence and restore control.
The response should protect people, preserve evidence and restore control. A failed temperature or treatment result needs an immediate exposure decision, a named repair owner and a confirming check before the affected system is handed back.
| Trigger | Immediate management action | Follow-up |
|---|---|---|
| Temperature out of range | Assess risk, restrict use if needed and arrange repair. | Recheck and trend review. |
| Positive sample | Follow competent advice, consider restriction, clean/disinfect and investigate cause. | Review control scheme. |
| Missed monitoring | Complete overdue checks and assess exposure risk. | Review resources and accountability. |
| Suspected illness linked to premises | Escalate, preserve records and cooperate with health/public authorities. | Investigate controls and update scheme. |
| System change/refurbishment | Review risk assessment before use. | Update schematic and control programme. |
| Long building closure | Implement recommissioning/flushing plan before reoccupation. | Verify controls before normal use. |
How does legionella management differ by sector?
The control principles stay the same, but the system and people at risk change.
The control principles stay the same, but the system and people at risk change. A shower block, care home and cooling system produce different aerosols and expose different people; the written scheme must fit the assets and users.
| Setting | Typical risk | Management focus |
|---|---|---|
| Office | Little-used showers, kitchenettes and stored water. | Simple schematic, flushing, temperatures and contractor review. |
| Hotel/leisure | Showers, pools, spas and changing facilities. | High-use/high-aerosol controls and occupancy changes. |
| Care setting | Susceptible users and scald risk. | Competent balancing of scald and legionella controls. |
| Construction/refurbishment | Temporary water, recommissioning and disturbed systems. | Pre-use controls and handover evidence. |
| Manufacturing | Process water, washers, cooling and aerosols. | System-specific assessment and maintenance. |
| Vacant property | Stagnation and unknown system condition. | Recommissioning before occupation. |
| Metalworking | Water-mix fluids and aerosol during cleaning or jetting. | Fluid management and avoid aerosolising biofilm. |
How does this topic align with ISO 45001?
Use these examples to connect the relevant clauses to your own occupational health and safety management system. For each clause, identify the person responsible, the control in use and the evidence that it works.
Scroll across the table to read all four columns.
| ISO 45001 clause | How it applies | What to put in place | How to verify it works |
|---|---|---|---|
| 5.3 Roles and responsibilities | Riverside’s dutyholder appoints a competent person with enough authority to oversee Legionella controls in the little-used bedroom wing. | Name the person responsible for day-to-day water controls, a deputy and an escalation route. Specify who authorises room reopening and how maintenance tells hotel operations that the control checks and any corrective work are complete. | Staff on duty can identify who has authority to close or release rooms. A sample decision shows the named person acted on the latest findings and communicated the room status. |
| 8.1.3 Management of change | Refurbishment, low use and reopening can change the water system or how it is used. Riverside needs to review those changes before the bedroom wing returns to use. | Have the responsible person review the assessment and written control arrangements with competent support. Agree how incomplete shower-outlet checks and defects will be resolved, and who confirms readiness before release. | The reopening record shows the assessment review, completed checks and resolved defects. Room release records follow the agreed approval. |
| 9.1.1 Monitoring and evaluating performance | A monitoring programme helps the responsible person identify where water-system controls are failing or checks are being missed. | Track the checks defined in the written scheme and review exceptions with the people responsible for resolving them. Record the response and verify the result after a correction. | A sample of missed or out-of-specification results shows how each was investigated, corrected and rechecked. A wider review identifies recurring problems by location or pattern of use. |
Selected applications of ISO 45001:2018 with Amendment 1:2024. Use the current standard for a full assessment and check the legal duties that apply to the work and location.
ISO 45001:2018 · 2024 climate action amendment · ISO 45002 implementation guidance · ISO technical committee clause FAQ
How can competence be demonstrated on the real task?
Competence needs to match the water system, responsibilities and decisions allocated. A technician trained for domestic outlet measurements is not thereby competent to commission an evaporative cooling system. Appointment of a responsible person needs evidence of system knowledge, authority and access to competent help; a course title alone cannot supply those resources. Related guidance: L8 ACOP and guidance.
Run an observed exercise using the actual schematic and a safe simulated failed reading. Ask the participant to identify the measurement location, explain its meaning, preserve the result and select the escalation or restriction within their role. The assessor should understand the relevant system and method. Do not create a live exposure, defeat a mixing valve or improvise treatment to test a trainee. Related guidance: L8 ACOP and guidance.
Retain the task, system, assessor, observed reasoning, assigned limits and learning action. Reassess after altered pipework, a change of system type or users, recurring failures, lost cover or evidence that the person cannot perform their duty. The dutyholder must ensure a competent deputy arrangement is practical when the usual responsible person is absent. Related guidance: L8 ACOP and guidance.
| Role and assessor | Observed decision | Limits and failure response | Record and reassessment |
|---|---|---|---|
| Building user/worker — facilities supervisor | Recognise an out-of-service outlet, respect restrictions and report unexpected condition to the named contact. | Do not flush, remove signs or change valve settings without authorised instruction. | Briefing and demonstrated reporting route; refresh after changed access or restrictions. Related guidance: L8 ACOP and guidance; HSG274 technical guidance; Keeping legionella records. |
| Facilities technician — assessor competent in the system/method | Locate the point on the schematic, take the specified measurement, record time/result and escalate a simulated exception. | Remain within the instructed task; an uncertain point or failed instrument holds the measurement decision. | Observed point/method and exception response; reassess after instrument, pipework or method change. Related guidance: L8 ACOP and guidance; HSG274 technical guidance; Keeping legionella records. |
| Responsible person/deputy — competent water-safety assessor | Interpret evidence, decide affected restrictions, obtain specialist support and set a verified release condition. | Do not treat a negative sample or contractor invoice as proof that all controls work. | System-specific decision, cover and recovery evidence; reassess after altered use, failed controls or loss of authority. Related guidance: L8 ACOP and guidance; HSG274 technical guidance; Keeping legionella records. |
| Contractor/specialist — competent technical reviewer | Explain survey/test/treatment scope, limitations, records and hand-back against the system-specific scheme. | Do not apply domestic benchmarks to cooling or spa systems; resolve unclear acceptance criteria before work. | Scope, demonstrated methods, interpreted results and exclusions; review changed plant or contracted duty. Related guidance: L8 ACOP and guidance; HSG274 technical guidance; Keeping legionella records. |
| Dutyholder/manager — competent governance reviewer | Test whether competent cover, access, budget and an open-exception route exist in practice. | Cannot delegate away the duty or authorise unsafe exposure because a reopening date is fixed. | Resourcing and sampled exception closure; reassess after organisational change or recurring failures. Related guidance: L8 ACOP and guidance; HSG274 technical guidance; Keeping legionella records. |
Guidance for these decisions: L8 ACOP and guidance; HSG274 technical guidance; Keeping legionella records. Apply the legal route for the work location; illustrative scenarios are SHARE teaching examples.
What training is needed for legionella management?
Training should match responsibility: awareness for users, practical checks for facilities teams and technical competence for responsible people and specialists.
Training should be role-based. General awareness creates a baseline, but supervisors, managers, advisers and senior leaders need different levels of decision-making, verification and escalation competence. HSE L8.
| Training level | Who needs it | What it should cover |
|---|---|---|
| General awareness | Everyone who may encounter the topic. | Plain-English awareness of legionella management, why it matters, common situations, basic controls, reporting routes and where to get help. HSE L8 |
| Topical practical training | Workers most directly involved in the task or support process. | Task examples, control expectations, warning signs, stop-work points, escalation and records. HSE L8 |
| Supervisor and manager training | People allocating work, authorising tasks, holding conversations or checking controls. | Decision quality, private conversations, supervision, risk assessment, evidence, escalation and review. HSE L8 |
| Specialist or competent-person training | Dutyholders, responsible persons, deputies, facilities teams, maintenance contractors, leisure managers, landlords, property managers and auditors. | Technical assessment, occupational health, fire safety, process safety, auditing, investigation or legal/privacy support where needed. HSE L8 |
| Refresher and learning | People in roles where drift, rare tasks or changing work creates risk. | Scenario refreshers, incident learning, audit findings, drills, reassessment and updates after change. HSE L8 |
How should learners explain legionella management?
Strong answers connect biology, systems, legal duties, control scheme, monitoring and records.
Strong answers connect biology, systems, legal duties, control scheme, monitoring and records. Explain where legionella can grow, how aerosol reaches people, who owns the written scheme and what a failed monitoring result changes.
| Prompt | Strong answer should include | Weak answer |
|---|---|---|
| Explain how legionella risk arises. | Growth in water systems plus aerosol exposure and susceptible people. | Dirty water causes disease. |
| Explain L8/HSG274 control. | Assess, appoint responsibility, written scheme, monitor, record and review. | Take water samples. |
| Explain temperature control. | Keep cold water cold, hot water hot and act on out-of-range readings. | Check temperatures sometimes. |
| Explain records. | Risk assessment, schematic, scheme, logs, actions, contractor reports and review. | Keep a folder. |
| Explain contractor duties. | Outsourcing support does not remove dutyholder control. | Contractor handles it all. |
Which legal duties apply to legionella management?
Apply the legal route for the work location and test the actual controls, responsibilities and records.
Great Britain and Northern Ireland have distinct primary and management regulations. Official guidance helps interpret practical arrangements, but is not a replacement for the applicable instrument. Specialist legal advice is needed for a disputed duty or enforcement decision.
| Jurisdiction | Direct instrument or guidance | Operational decision supported |
|---|---|---|
| Great Britain | Health and Safety at Work etc. Act 1974 | General employer, worker and public protection duties. |
| Northern Ireland | Health and Safety at Work (NI) Order 1978 | The separate NI general-duty route. |
| Great Britain | Management of Health and Safety at Work Regulations 1999 | Risk assessment, arrangements, competence and emergency planning. |
| Northern Ireland | Management of Health and Safety at Work Regulations (NI) 2000 | The separate NI management and risk-assessment route. |
| Great Britain | COSHH Regulations 2002 | Biological-agent exposure assessment and control. |
| Northern Ireland | COSHH Regulations (NI) 2003 | Separate NI biological-agent exposure controls. |
| Great Britain | L8, fourth edition ACOP and guidance | GB approved-code route for legionella risk. |
| Northern Ireland | HSENI approval of L8 for use in NI | L8 is approved for use with NI law. |
Check the separate notification/reporting duties. In GB, assess whether a cooling tower or evaporative condenser is a notifiable device, notify the local authority in writing and keep required details current, including cessation of use. For diagnosed work-related legionellosis, separately assess RIDDOR using the work connection and applicable reporting criteria. A positive water sample alone is not a diagnosed reportable disease. In Northern Ireland, notify the local authority in writing about a cooling tower or evaporative condenser and when it stops being used; obtain its notification form from that authority’s environmental-health service. For employer disease reporting, HSENI describes NI RIDDOR 1997 legionellosis cases where a doctor has notified the employer and the employee’s current work involves potentially contaminated workplace water-service systems. Use HSENI’s Report of a case of disease (NI2508A) route when those criteria apply. HSENI accepts work-related reports across enforcing-authority areas and forwards relevant reports to district councils. Public-health escalation and an employer’s statutory report are distinct. Sources: HSE legionella other duties; HSENI legionella duties in Northern Ireland; HSENI report of a case of disease — NI2508A; HSENI incident reporting service.
How should controls be owned and reviewed?
Assign a competent owner, check that task controls work, involve workers and act when evidence changes.
For Legionella Management, record the actual hazard and task, the chosen control, the person responsible, the evidence that it works and the point at which work must stop or be reassessed. HSE management guidance for Great Britain describes planning, worker consultation, checking and action. HSENI guidance for Northern Ireland describes competent help, risk control and review. These management steps do not prove that a particular task control is suitable; use the topic-specific evidence and the applicable GB or NI law elsewhere on this page.
Where ISO 45001 is adopted, connect water-system responsibilities, contractor scope, failed readings and verified recovery to the existing management arrangements. The actual system risk assessment and control scheme govern the water decision. Certification cannot confirm a temperature regime, treatment result or release of a closed wing. HSE: ISO 45001 management standard.
What warning signs show legionella is not managed?
Most failures show up as missing ownership, poor records, repeated temperature issues or passive contractor reports.
Warning signs are included because failure usually appears before a serious event. Treat these points as prompts for inspection, audit, supervision and management review rather than as simple compliance statements. HSE L8.
| Warning sign | How harm can develop | Action |
|---|---|---|
| No named responsible person | Controls may be nobody's job. | Appoint competent owner and deputy. HSE L8 |
| Out-of-date schematic | Dead legs or high-risk outlets may be missed. | Update system information. HSE L8 |
| Repeated temperature failures | Growth conditions may persist. | Investigate root cause and repair. HSE L8 |
| Missed flushing | Stagnant water may develop. | Recover schedule and review outlet use. HSE L8 |
| Contractor reports unread | Defects remain open. | Review reports and action tracker. HSE L8 |
| No change review after refurbishment | New risk may not be controlled. | Review assessment before reoccupation. HSE L8 |
| No evidence of action after positive sample | Control may not be restored. | Escalate, clean/disinfect and verify. HSE L8 |
Which acronyms and terms matter here?
These terms identify the water-system control and the evidence needed to manage it.
| Term | Full form or meaning | Use here |
|---|---|---|
| GB | Great Britain | England, Scotland and Wales legal route. |
| NI | Northern Ireland | Separate law; HSENI approves L8 for use. |
| L8 | Legionnaires’ disease approved code and guidance | Dutyholder control framework. |
| HSG274 | HSE legionella technical guidance, three parts | Choose the part for the actual water system. |
| COSHH | Control of Substances Hazardous to Health | Biological-agent exposure law in separate GB and NI instruments. |
| TMV | Thermostatic mixing valve | Balances scald control with legionella system design and checks. |
| ERICPD | Eliminate, Reduce, Isolate, Control, PPE, Discipline | Control planning and sustained checks. |
| Sentinel outlet | Selected representative hot/cold outlet | A point for temperature monitoring under the scheme. |
| ACOP | Approved Code of Practice | Different legal status from ordinary guidance; apply the appropriate GB/NI approval route. |
| PPE | Personal protective equipment | Selected for the maintenance or treatment task after assessment. |
| HSE | Health and Safety Executive | Great Britain regulator; HSG274 explicitly has UK technical scope. |
Which Crownway Fuels documents support this topic?
Open an editable document, read the preview, or find its place in the Crownway hierarchy. 6 resources relate to this page.
Fictional Crownway Fuels examples for English forecourts, with a separate illustrative bulk terminal. Check site applicability, permissions and actual controls before adapting any document for use.
Water hygiene and welfare systems policy (6)
- Water hygiene and welfare systems policy (CWF-POL-WATER · Completed fictional example)
Set company expectations, responsibilities and resources for water hygiene and welfare systems.
Read preview · Download DOCX · Show in hierarchy - Water hygiene and welfare systems procedure (CWF-PRO-WATER · Completed fictional example)
Explain who does what, in what sequence, the control rationale, evidence, escalation and safe restart conditions.
Read preview · Download DOCX · Show in hierarchy - Water systems and responsible persons register (CWF-REG-WATER-01 · Blank register with separate fictional worked entries)
Provide the site/task-specific water systems and responsible persons register and retain its controlled output.
Read preview · Download XLSX · Show in hierarchy - Legionella and biological water risk assessment (CWF-RA-WATER-01 · Blank editable master)
Provide the site/task-specific legionella and biological water risk assessment and retain its controlled output.
Read preview · Download DOCX · Show in hierarchy - Written water hygiene control scheme (CWF-PLN-WATER-01 · Completed fictional example)
Provide the site/task-specific written water hygiene control scheme and retain its controlled output.
Read preview · Download DOCX · Show in hierarchy - Water hygiene monitoring cleaning and remedial record (CWF-FRM-WATER-01 · Blank editable master)
Provide the site/task-specific water hygiene monitoring cleaning and remedial record and retain its controlled output.
Read preview · Download DOCX · Show in hierarchy














Unlock another resource
You have used this month’s two free downloads. Publish a post in your own words to unlock one more resource, or choose SHARE Individual for 10 downloads per month.